Home / Browse projects / Thane, Maharashtra / MY CITY - PHASE I - PART II
MY CITY - PHASE I - PART II
RG-MH-27154 · RERA P51700009168 · Last updated on MahaRERA portal: 20 Aug 2022
Source: official MahaRERA filing
Red flags
- 3 complaints at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MY CITY - PHASE I - PART II is a Residential / Group Housing project by HORIZON PROJECTS PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700009168 on 19 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2019. The completion date has moved by 12 months from the original filing. 3 complaints are on record with the regulator.
At a glance
Project
- NameMY CITY - PHASE I - PART II
- TypeResidential / Group Housing
- Location
- Diva-Manpada Road
- Betavade
- DOMBIVLI
- Kalyan
- Thane
- 400612
- Pincode400612
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700009168
- ReraGenie IDRG-MH-27154
Builder
- NameHORIZON PROJECTS PVT LTD
- Entity typeCompany
- CINU45400MH2011PTC213029
- GSTIN27AAFCR1404F1ZS
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- DirectorsSaurabh Natu, Deepak Lohia, Sameer Parasmal Nahar, Saurabh Natu, Sameer Parasmal Nahar, Saurabh Natu
- Other registrations9 more →
- Completed4 of 10
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on19 Aug 2017
- Promised completion31 Dec 2019
- Revised completionRevised to 31 Dec 2019 (originally 31 Dec 2018)
- Buildings5 building records
- Documents filed65 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A1 | NA | 31 | 0 | 0 | 0 | 0 |
| A2 | NA | 31 | 0 | 0 | 0 | 0 |
| B1 | NA | 30 | 0 | 0 | 0 | 0 |
| C1 | NA | 31 | 0 | 0 | 0 | 0 |
| C2 | NA | 31 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 20 Aug 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
55 of 55 construction stages are filed complete across 5 buildings.
A1100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
A2100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B1100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C1100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C2100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Aug 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 50% |
Parking filed593
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A1 | 83 | 35 | 118 |
| A2 | 84 | 33 | 117 |
| B1 | 76 | 44 | 120 |
| C1 | 89 | 31 | 120 |
| C2 | 109 | 9 | 118 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | CURRIE AND BROWN |
| Partner | Role in project |
|---|---|
| HORIZON PROJECTS PVT LTD | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have registered our project “My City Phase -I Part -II ” (“hereinafter referred to as the said Project”) on the RERA Website bearing Registration No.51700009168 on 19th August 2017. The “Revised Proposed Date of Completion” while registering the said Project was mentioned on RERA Website as 31/12/2018 . We have completed the entire construction and completed finishing works of the said Project and have applied for most of the NOCs and initiated the compliances required for obtaining Occupation Certificate. We expect the water and electricity connections to be in place on or before 30th June
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000012418 | RAJESH PARSHURAM AMBRE | HORIZON PROJECTS PVT LTD | 13/12/2017 |
| CC006000000001512 | Mayuresh Dhavle | Runwal builders | 27/10/2017 |
| CC006000000193917 | HORIZON PROJECTS PVT LTD | MR. VIJAY ANAND TALEKAR & MRS. TRUPTI VIJAY TALEKAR | 17/09/2020 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Dec 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Dec 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 27 Sep 2019
Documents filed65
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 3)File: Form 3 My City Phase I Part II September 2017.pdf | 20 Aug 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A My City Phase I Part II Year 2020.pdf | 23 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A My City Phase I Part II Year 2021.pdf | 23 Jun 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Cluster 5 Tower 7.pdf | 23 Mar 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Cluster 5 Tower 8.pdf | 23 Mar 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Cluster 5 Tower 9.pdf | 23 Mar 2022 |
| Certificates of CA (Form 5)File: Form 5 My City Phase I Part II 08032021.pdf | 10 Mar 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Tower A3 30092020.pdf | 19 Dec 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Tower A4 30092020.pdf | 19 Dec 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Tower B2 30092020.pdf | 19 Dec 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Tower C3 30092020.pdf | 19 Dec 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Tower C4 30092020.pdf | 19 Dec 2020 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM-4 - ARCHITECT COMPLETION CERTIFICATE MY CITY PHASE I PART II 2020.pdf | 10 Aug 2020 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate TA 1.pdf | 10 Aug 2020 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate TA 2.pdf | 10 Aug 2020 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate TB 1.pdf | 10 Aug 2020 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate TC 1.pdf | 10 Aug 2020 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate TC 2.pdf | 10 Aug 2020 |
| Certificates of CA (Form 3)File: Form-3 HPPL - My City Phase 1 Part II.pdf | 16 Jul 2020 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCCUPATION CERTIFICATE - MY CITY PHASE I PART II.pdf | 27 Sep 2019 |
| OtherFile: OC A1A2B1C1C2 14-2-19.pdf | 25 Feb 2019 |
| Certificates of CA (Form 3)File: Form 3 My City Cluster dtd 29 sep 18.pdf | 22 Feb 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 310718_MY CITY PHASE I PART II ARCHITECT CERTIFICATE.pdf | 21 Feb 2019 |
| Details of encumbrancesFile: Self Declaration reg encumbrances.pdf | 5 Jan 2019 |
| Declaration in FORM BFile: FORM - B My City Part - II.pdf | 5 Jan 2019 |
| Certificates of CA (Form 5)File: HPPL- Phase I- Part II FORM 5.pdf | 29 Oct 2018 |
| Layout approvalFile: 14092017_ layout.pdf | 6 Dec 2017 |
| Copy of Layout Approval (in case of layout)File: 14092017_ layout.pdf | 6 Dec 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: 14092017_CC.pdf | 6 Dec 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TOWER- A1.pdf | 6 Dec 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TOWER- A2.pdf | 6 Dec 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TOWER- B1.pdf | 6 Dec 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TOWER- C1.pdf | 6 Dec 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TOWER- C2.pdf | 6 Dec 2017 |
| Proforma of Allotment letterFile: My City Phase I Part II AFS with Allotment .pdf | 10 Nov 2017 |
| Proforma of Allotment letterFile: My City Phase I Part II AFS with Allotment.pdf | 4 Oct 2017 |
| Copy of the legal title reportFile: title certificate8.pdf | 30 Jul 2017 |
| Details of encumbrancesFile: Encumbrances.pdf | 30 Jul 2017 |
| Declaration in FORM BFile: Form B.pdf | 30 Jul 2017 |
| Certificates of CA (Form 3)File: CA Certificate1.pdf | 30 Jul 2017 |
| Proforma of Allotment letterFile: Self Declaration.pdf | 30 Jul 2017 |
| Building plan approvalFile: PLOT A _ 120706.pdf | 29 Jul 2017 |
| Building plan approvalFile: 01 LAYOUT PLAN.pdf | 29 Jul 2017 |
| Layout approvalFile: 20151204_LAYOUT PLAN copy.pdf | 29 Jul 2017 |
| Layout approvalFile: TOWER A1.pdf | 29 Jul 2017 |
| Layout approvalFile: TOWER A2.pdf | 29 Jul 2017 |
| Layout approvalFile: TOWER B1.pdf | 29 Jul 2017 |
| Layout approvalFile: TOWER C1.pdf | 29 Jul 2017 |
| Layout approvalFile: TOWER C2.pdf | 29 Jul 2017 |
| PAN CardFile: Company PAN Card.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: 20151204_LAYOUT PLAN copy.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: TOWER A1.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: TOWER A2.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: TOWER B1.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: TOWER C1.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: TOWER C2.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: PLOT A _ 120706.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: 01 LAYOUT PLAN.pdf | 29 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: AMENDED CC.pdf | 29 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A1_29-07-2017.pdf | 29 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A2_29-07-2017.pdf | 29 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: C1_29-07-2017.pdf | 29 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: C2_29-07-2017.pdf | 29 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: B1_29-07-2017.pdf | 29 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERTIFICATE_29-7-17 My City Plot A Part 2 RERA.pdf | 29 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 9 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 65 filed documents as one ZIP, foldered, with a manifest
Keep MY CITY - PHASE I - PART II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Betavade7,600+ in Thane
Filed coordinates, straight-line distance. 335 registered projects within 2 km.
DOSTI PLANET NORTH - SECTOR 3
CHALAMA INFRAPROPERTIES PRIVATE LIMITED
NICE WORLD 1
NICE BUILDERS
CENTRAL PARK
HARMAIN ENTERPRISES
MUKTA GHARONDA
SKYLARK INFRASTRUCTURES
Palm Riveria
YES REALTY
Trinity Paradise Phase 1
Trinity Builders
See every Thane project, with the district possession charts
Builder: HORIZON PROJECTS PVT LTD
HORIZON PROJECTS PVT LTD has 10 registrations on MahaRERA, including MY CITY - PHASE I - PART I and MY CITY - PHASE I - PART III. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if MY CITY - PHASE I - PART II is delayed beyond 31 Dec 2019?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MY CITY - PHASE I - PART II?
The registered promoter entity is HORIZON PROJECTS PVT LTD, a company as per the filing. Its CIN U45400MH2011PTC213029 and GSTIN 27AAFCR1404F1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MY CITY - PHASE I - PART II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MY CITY - PHASE I - PART II?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MY CITY - PHASE I - PART II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MY CITY - PHASE I - PART II?
The professionals named in the filing: Architect: CURRIE AND BROWN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MY CITY - PHASE I - PART II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback