MY CITY - PHASE I - PART I
RG-MH-10265 · RERA P51700000528 · Last updated on MahaRERA portal: 15 Feb 2025
Source: official MahaRERA filing
Red flags
- 24 complaints at MahaRERA
- Completion date moved by 18 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MY CITY - PHASE I - PART I is a Residential / Group Housing project by HORIZON PROJECTS PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700000528 on 18 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2022. The completion date has moved by 18 months from the original filing. 24 complaints are on record with the regulator.
At a glance
Project
- NameMY CITY - PHASE I - PART I
- TypeResidential / Group Housing
- Location
- Diva-Manpada Road
- Betavade
- DOMBIVLI
- Kalyan
- Thane
- 400612
- Pincode400612
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700000528
- ReraGenie IDRG-MH-10265
Builder
- NameHORIZON PROJECTS PVT LTD
- Entity typeCompany
- CINU45400MH2011PTC213029
- GSTIN27AAFCR1404F1ZS
- DirectorsSaurabh Natu, Deepak Lohia, Sameer Parasmal Nahar, Saurabh Natu, Sameer Parasmal Nahar, Saurabh Natu
- Other registrations9 more →
- Completed4 of 10
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on18 Jul 2017
- Promised completion30 Dec 2022
- Revised completionRevised to 30 Dec 2022 (originally 30 Jun 2021)
- Buildings5 building records
- Documents filed208 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A3 | NA | 31 | 0 | 0 | 0 | 0 |
| A4 | NA | 31 | 0 | 0 | 0 | 0 |
| B2 | NA | 31 | 0 | 0 | 0 | 0 |
| C3 | NA | 31 | 0 | 0 | 0 | 0 |
| C4 | NA | 23 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 15 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
55 of 55 construction stages are filed complete across 5 buildings.
A3100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
A4100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B2100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C3100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C4100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 15 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 90% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 0% |
Parking filed624
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A3 | 114 | 18 | 132 |
| A4 | 107 | 27 | 134 |
| B2 | 78 | 42 | 120 |
| C3 | 109 | 9 | 118 |
| C4 | 82 | 38 | 120 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Saakaar Architects |
| Architect | JYOTI KALE |
| Engineer | Atul Waman Bapat |
| Chartered Accountant | Kshirsagar and Associates |
| Partner | Role in project |
|---|---|
| HORIZON PROJECTS PVT LTD | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe, have registered our project “My City - Phase I - Part I ” (hereinafter referred to as the said Project) on the RERA Website bearing Registration No.51700000528 on 18th July 2017. The “Revised Proposed Date of Completion” while registering the said Project was mentioned on RERA Website as 31/12/2020 for the completion of the Project and further it was sou moto extended by RERA Authority for 6 (six) months i.e. till 30/06/2021 due to lockdown declared by Maharashtra Government due to Covid-19. We have completed the construction and the finishing work of the said Project and obtained Part Occ
Complaints filed with MahaRERA24
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000000031 | Refund of Rs. 15, 38,295 /- and waiver the 24% interest on delay payment. | Mr. Sandip Runwal , Mr Subhash | 29/07/2017 |
| CC006000000000671 | ADITYA ARVINDKUMAR MESHRAM | HORIZON PROJECTS PVT LTD | 04/12/2018 |
| CC006000000000608 | Sagar Mhaprolkar | RUNWAL DEVELOPER or HORIZON Projects PVT LTD | 21/09/2017 |
| CC006000000012452 | ANIL PRABHAKAR VIJAPURE | PARESH MISHRA | 17/12/2017 |
| CC006000000023627 | Dennis Albert Pinto | Horizon Projects Pvt Ltd | 10/03/2018 |
| CC006000000055551 | ANIL PRABHAKAR VIJAPURE | M/S HORIZONSPROJECTS PVT LTD | 06/08/2018 |
| CC006000000193651 | HORIZON PROJECTS PVT LTD | Mrs. Rasika Rajendra Salvi & Mrs. Suchita S. Kadu | 15/09/2020 |
| CC006000000193768 | Horizon Projects Pvt Ltd | Mr. Byju Philips Punnamotil | 15/09/2020 |
| CC006000000193817 | HORIZON PROJECTS PVT LTD | JINEESH JAYAPRAKASH | 15/09/2020 |
| CC006000000193842 | HORIZON PROJECTS PVT LTD | SANDESH LAXMAN MORE & SANIKA SANDESH MORE | 15/09/2020 |
| CC006000000193843 | HORIZON PROJECTS PVT LTD | SUSHANT PANIGRAHI & SHIVSHANKAR PANIGRAHI | 15/09/2020 |
| CC006000000193844 | HORIZON PROJECTS PVT LTD | T N G REDDY | 15/09/2020 |
| CC006000000193908 | HORIZON PROJECTS PVT LTD | KRISHNA S. NAIDU | 15/09/2020 |
| CC006000000193915 | HORIZON PROJECTS PVT LTD | MRS. SHRIDEVI R. MARTURKAR & MR. RAGHAVENDRA P. MARTURKAR | 17/09/2020 |
| CC006000000193918 | HORIZON PROJECTS PVT LTD | MR. MURSHID SHAHID KHAN | 17/09/2020 |
| CC006000000193920 | HORIZON PROJECTS PVT LTD | MS. NAJMA D KHAN | 17/09/2020 |
| CC006000000193922 | HORIZON PROJECTS PVT LTD | MS. SUBHA VITHAL SAMBARE | 17/09/2020 |
| CC006000000194237 | HORIZON PROJECTS PVT LTD | MR. BIPIN NAIR & MRS. SMITHA NAIR | 07/10/2020 |
| CC006000000194240 | HORIZON PROJECTS PVT LTD | MR. T.N.G. REDDY | 07/10/2020 |
| CC006000000194245 | HORIZON PROJECTS PVT LTD | RASHMA RAVEENDRAN | 07/10/2020 |
| CC006000000194278 | HORIZON PROJECTS PVT LTD | MR. T. N.G. REDDY | 07/10/2020 |
| CC006000000193653 | HORIZON PROJECTS PVT LTD | MOHAMMED ASHRAF ISMAIL SHAIKH & MOHAMMED ASIF ISMAIL SHAIKH | 15/09/2020 |
| CC006000000193657 | HORIZON PROJECTS PVT LTD | SHOORSATI T. SINGH, RAKESH T. SINGH & ROSHAN T. SINGH | 15/09/2020 |
| CC12501562 | Anil Prabhakar Vijapure | HORIZON PROJECTS PVT LTD | 12/05/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Dec 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 9 Mar 2020
Documents filed208
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 208 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Dec 2024 compressed.pdf | 15 Feb 2025 |
| Certificates of CA (Form 3)File: FORM 3 - Cluster 1 Dec2024-23-01-2025-compressed -compressed (1).pdf | 30 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE-Phase I- Part I -31-12-2024.pdf | 30 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 22 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 22 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 29 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 2 June 2024.pdf | 29 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 2023.pdf | 29 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 2024.pdf | 29 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 2024.pdf | 29 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 29 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf | 29 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dec 22.pdf | 8 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: March 23.pdf | 8 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: June 23.pdf | 8 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sept 23.pdf | 8 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2021-2022 - DS.pdf | 8 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2022 - 2023 - DS.pdf | 8 Dec 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 A3.pdf | 4 Dec 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 A4.pdf | 4 Dec 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 B2.pdf | 4 Dec 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 C3.pdf | 4 Dec 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 C4.pdf | 4 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 A3.pdf | 29 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 Form 1 A4.pdf | 29 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 Form 1 B2.pdf | 29 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 Form 1 C3.pdf | 29 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5 Form 1 C4.pdf | 29 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Form 1 A3.pdf | 29 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 Form 1 A4.pdf | 29 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 Form 1 B2.pdf | 29 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 Form 1 C3.pdf | 29 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5 Form 1 C4.pdf | 29 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Form 1 A3.pdf | 29 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 Form 1 A4.pdf | 29 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 Form 1 B2.pdf | 29 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 Form 1 C3.pdf | 29 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5 Form 1 C4.pdf | 29 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Form 1 A3.pdf | 29 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 Form 1 A4.pdf | 29 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 Form 1 B2.pdf | 29 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 Form 1 C3.pdf | 29 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5 Form 1 C4.pdf | 29 Nov 2023 |
| Certificates of CA (Form 3)File: 31 12 2022 Form 3 Cluster 1.pdf | 29 Nov 2023 |
| Certificates of CA (Form 3)File: 31 03 2023 Form 3 Cluster 1.pdf | 29 Nov 2023 |
| Certificates of CA (Form 3)File: 30 06 2023 Form 3 Cluster 1.pdf | 29 Nov 2023 |
| Certificates of CA (Form 3)File: 30 09 2023 Form 3 Cluster 1.pdf | 29 Nov 2023 |
| Certificates of CA (Form 5)File: Form 5 HPPL DS.pdf | 29 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 HPPL DS.pdf | 29 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A3 PHASE 1 PART 1 FORM 1.pdf | 21 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A4 PHASE 1 PART 1 FORM 1.pdf | 21 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: B2 PHASE 1 PART 1 FORM 1.pdf | 21 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: C4 PHASE 1 PART 1FORM 1.pdf | 21 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PHASE 1- PART 1 FORM 2.pdf | 21 Oct 2022 |
| Certificates of CA (Form 3)File: Form3 - My City Part1 Phase 1 Sep 22_compressed.pdf | 21 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 My City Phase I Part 1 2020 2021.pdf | 19 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 My City Phase I Part I 2021 2022.pdf | 19 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 My City Ph1 Pt 1 30 9 2017.pdf | 8 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory My City Ph 1 pt 1 30 06 21.pdf | 8 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory My City Ph1 Pt 1 30 09 21.pdf | 8 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate My CIty Phase I part 1 30 06 2018.pdf | 6 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate My CIty Phase I Part I 30 09 2018.pdf | 6 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate My CIty Phase I Part I 31 12 2018.pdf | 6 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate My CIty Phase I Part I 30 03 2019.pdf | 6 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate My CIty Phase I Part I 30 06 2019.pdf | 6 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate My CIty Phase I Part I 30 09 2019.pdf | 6 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate My CIty Phase I Part I 31 12 2019.pdf | 6 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate My CIty Phase I Part I 31 03 2020.pdf | 6 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate My CIty Phase I Part I 30 06 2020.pdf | 6 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate My CIty Phase I Part I 30 09 2020.pdf | 6 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate My CIty Phase I Part I 31 12 2020.pdf | 6 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate My CIty Phase I Part I 30 09 2021.pdf | 6 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate My CIty Phase I Part I 31 12 2021.pdf | 6 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold My City Phase I Part I 31 12 2021.pdf | 6 Sep 2022 |
| Certificates of CA (Form 3)File: Form 3 My City Phase I Part I 31 03 2019.pdf | 3 Sep 2022 |
| Certificates of CA (Form 3)File: Form 3 My City Phase I Part I 31 03 2020.pdf | 3 Sep 2022 |
| Certificates of CA (Form 3)File: Form 3 My City Phase I Part I 30 06 2020.pdf | 3 Sep 2022 |
| Certificates of CA (Form 3)File: Form 3 My City Phase I Part I 31 12 2020.pdf | 3 Sep 2022 |
| Certificates of CA (Form 3)File: Form 3 My City Phase I Part I 30 06 2021.pdf | 3 Sep 2022 |
| Certificates of CA (Form 3)File: My City Phase I Part I Form 3 CA Certificate 30 09 2018.pdf | 3 Sep 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 9 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 208 filed documents as one ZIP, foldered, with a manifest
Keep MY CITY - PHASE I - PART I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Betavade7,600+ in Thane
Filed coordinates, straight-line distance. 69 registered projects within 2 km.
DOSTI PLANET NORTH - SECTOR 3
CHALAMA INFRAPROPERTIES PRIVATE LIMITED
NICE WORLD 1
NICE BUILDERS
CENTRAL PARK
HARMAIN ENTERPRISES
MUKTA GHARONDA
SKYLARK INFRASTRUCTURES
Palm Riveria
YES REALTY
Trinity Paradise Phase 1
Trinity Builders
See every Thane project, with the district possession charts
Builder: HORIZON PROJECTS PVT LTD
HORIZON PROJECTS PVT LTD has 10 registrations on MahaRERA, including MY CITY - PHASE I - PART I and MY CITY - PHASE I - PART III. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if MY CITY - PHASE I - PART I is delayed beyond 30 Dec 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MY CITY - PHASE I - PART I?
The registered promoter entity is HORIZON PROJECTS PVT LTD, a company as per the filing. Its CIN U45400MH2011PTC213029 and GSTIN 27AAFCR1404F1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MY CITY - PHASE I - PART I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MY CITY - PHASE I - PART I?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MY CITY - PHASE I - PART I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MY CITY - PHASE I - PART I?
The professionals named in the filing: Architect: Saakaar Architects; Architect: JYOTI KALE; Engineer: Atul Waman Bapat; Chartered Accountant: Kshirsagar and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MY CITY - PHASE I - PART I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback