MUNICIPAL STAFF MANDAR CHSL

By OSSIA DEVELOPERS

RG-MH-31971 · RERA P51800080186 · Last updated on MahaRERA portal: 25 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Nov 2028Possession promisedno revision filed
4 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 10%
30 of 30Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 50 documents Report an error

MUNICIPAL STAFF MANDAR CHSL is a Residential / Group Housing project by OSSIA DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800080186 on 6 May 2025. Possession is promised by 30 Nov 2028. 0 of the 30 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete.

At a glance

Project

  • NameMUNICIPAL STAFF MANDAR CHSL
  • TypeResidential / Group Housing
  • Location
    • R.M. BHATTAD ROAD
    • BORIVALI
    • Mumbai Suburban
    • 400092
  • Pincode400092
  • RERA no.P51800080186
  • ReraGenie IDRG-MH-31971

Builder

  • NameOSSIA DEVELOPERS
  • Entity typePartnership
  • Other registrations5 more →
  • Completed3 of 6
  • Declared earlier projects5 →

Key dates

this monthRegisteredMay 2025PromisedNov 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 May 2025
  • Promised completion30 Nov 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed50 files

Current status

0%0 of 30 units booked
17.5%Work done, per cost certificate

Figures as on 25 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA8515015
WING BNA8515015

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 10%.

WING A19%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)10%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B19%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)10%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed111

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots111
Closed/Covered111
BuildingClosed/CoveredTotal
WING A5656
WING B5555

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,100 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Jul 2025
LandownerVillageDistrict
MUNICIPAL STAFF MANDAR CHSLBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI7088.51
Proposed, not sanctioned2,529 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKOTAK MAHINDRA BANK LTD ADITYA TOWERS CHANDAVARKAR ROAD BORIVALI WEST MUMBAI MAHARASHTRA PIN CODE - 400 092
Estimated costRs 5,829
Cost incurredRs 1,018
Work done17.47%
BuildingWingEstimatedIncurred
WING ANARs 2,678Rs 509
WING BNARs 2,678Rs 509
-NARs 473-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPACE VISION
Engineeramjad ali bhati
Chartered AccountantNEHALI AND CO
Chartered AccountantNEHALI & CO
PartnerRole in project
OSSIA DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2028

Documents filed50

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Form 1 - Mandar.pdf25 May 2026
Withdrawal Update Form 2File: Engineer Certificate Form 2 - Mandar.pdf25 May 2026
Withdrawal Update Form 3File: Signed CA Certificate_Ossia Developers March 26.pdf25 May 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate - Mandar.pdf21 May 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate - Mandar.pdf21 May 2026
Withdrawal Update Form 3File: Signed CA Certificate_Ossia Developers DEC 25.pdf21 May 2026
Withdrawal Update Form 1File: Form 1.pdf14 May 2026
Withdrawal Update Form 2File: Engineer Certificate Form 2.pdf14 May 2026
Withdrawal Update Form 3File: Re Signed CA Certificate_Ossia Developers sept 25.pdf14 May 2026
Commencement certificateFile: 2471680_FirstCC_signed.pdf26 Jul 2025
Layout approvalFile: IOD Drawing upto 7th Floor (1)_1-1.pdf26 Jul 2025
Building plan approvalFile: IOD Drawing upto 7th Floor (1)_2-3.pdf26 Jul 2025
Building plan approvalFile: IOD Drawing upto 7th Floor_4-end.pdf26 Jul 2025
Details of encumbrances concerned to FinanceFile: No encumbrances Self Declaration.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Declaration for Existing Members.pdf17 Apr 2025
Details of encumbrances concerned to LegalFile: No encumbrances Self Declaration.pdf17 Apr 2025
Other - TechnicalFile: annexure A.pdf14 Apr 2025
Layout approvalFile: IOD Drawing upto 7th Floor 14-02-25_1-1-1.pdf12 Apr 2025
Layout approvalFile: IOD Drawing upto 7th Floor 14-02-25_2-2.pdf12 Apr 2025
Layout approvalFile: IOD Drawing upto 7th Floor 14-02-25_3-3.pdf12 Apr 2025
Layout approvalFile: IOD Drawing upto 7th Floor 14-02-25_4-4.pdf12 Apr 2025
Layout approvalFile: IOD Drawing upto 7th Floor 14-02-25_5-5.pdf12 Apr 2025
Layout approvalFile: IOD Drawing upto 7th Floor 14-02-25_6-end.pdf12 Apr 2025
Building plan approvalFile: IOD_signed.pdf12 Apr 2025
Copy of Layout Approval (in case of layout)File: IOD Drawing upto 7th Floor 14-02-25_1-1-1.pdf12 Apr 2025
Copy of Layout Approval (in case of layout)File: IOD Drawing upto 7th Floor 14-02-25_2-2.pdf12 Apr 2025
Copy of Layout Approval (in case of layout)File: IOD Drawing upto 7th Floor 14-02-25_3-3.pdf12 Apr 2025
Copy of Layout Approval (in case of layout)File: IOD Drawing upto 7th Floor 14-02-25_4-4.pdf12 Apr 2025
Copy of Layout Approval (in case of layout)File: IOD Drawing upto 7th Floor 14-02-25_5-5.pdf12 Apr 2025
Copy of Layout Approval (in case of layout)File: IOD Drawing upto 7th Floor 14-02-25_6-end.pdf12 Apr 2025
Proforma of Allotment letterFile: 12-4-25 Allotment Letter (4) (1).pdf12 Apr 2025
Declaration in FORM BFile: FORM B Affidavit cum declaration Promoter.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf12 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: 2471680_FirstCC_signed.pdf12 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: IOD_signed.pdf12 Apr 2025
Declaration about Commencement CertificateFile: CC Covering Letter (8).pdf12 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration of RERA Bank Account.pdf12 Apr 2025
Deviation Report with respect to Allotment letterFile: Deviation Report allotment.pdf12 Apr 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS.pdf12 Apr 2025
Proforma of Agreement for saleFile: Draft Agreement (2) (3) (1).pdf12 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure of Interest.pdf12 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Opening of RERA Designated Bank Accounts.pdf12 Apr 2025
PAN CardFile: Ossia developers pancard --.pdf11 Apr 2025
Copy of the legal title reportFile: title certificate as per RERA format 03-05-2025.pdf11 Apr 2025
Details of encumbrances concerned to FinanceFile: No encumbrances Self Declaration.pdf11 Apr 2025
CERSAI detailsFile: Cersai Declaration.pdf11 Apr 2025
Details of encumbrances concerned to LegalFile: No encumbrances Self Declaration.pdf11 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Secured.pdf11 Apr 2025

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Borivali Shiv Sadan CHSLP51800066573Borivali East, Mumbai Suburban128Jun 2024OngoingOct 2027Not due yet
Prem RatanP51800046559Prem Nagar, Mumbai Suburban-Aug 2022CompletedDec 2024Oct 2024
Narmada ChayaP51800032374Borivali East, Mumbai Suburban-Jan 2022Certificate SignedDec 2024Oct 2023
JYOTI CHSLP51800008566Borivali -W, Mumbai Suburban-Aug 2017CompletedDec 2018Registered original: Jun 2018Aug 2018

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MUNICIPAL STAFF MANDAR CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORIVALI6,700+ in Mumbai Suburban

Builder: OSSIA DEVELOPERS

Ossia developers has 6 registrations on MahaRERA, including JYOTI CHSL and Prem Ratan. Its filings disclose 5 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if MUNICIPAL STAFF MANDAR CHSL is delayed beyond 30 Nov 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MUNICIPAL STAFF MANDAR CHSL?

The registered promoter entity is OSSIA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MUNICIPAL STAFF MANDAR CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MUNICIPAL STAFF MANDAR CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MUNICIPAL STAFF MANDAR CHSL?

The professionals named in the filing: Architect: SPACE VISION; Engineer: amjad ali bhati; Chartered Accountant: NEHALI AND CO; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MUNICIPAL STAFF MANDAR CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MUNICIPAL STAFF MANDAR CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MUNICIPAL STAFF MANDAR CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.