Home / Browse projects / Thane, Maharashtra / MULTANI RESIDENCY

Registered No litigation declared Residential / Group Housing project

MULTANI RESIDENCY

By M R Developers

RG-MH-17919 · RERA P51700076655 · Last updated on MahaRERA portal: 22 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 4 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 48%
28 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

MULTANI RESIDENCY is a Residential / Group Housing project by M R Developers in Thane, Maharashtra, registered with MahaRERA as P51700076655 on 20 Jun 2024. Possession is promised by 30 Mar 2027. The completion date has moved by 4 months from the original filing. 0 of the 28 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameMULTANI RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • Bhiwandi
    • Chavindre
    • Bhiwandi (M Corp.)
    • Thane
    • 421302
  • Pincode421302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700076655
  • ReraGenie IDRG-MH-17919

Builder

  • NameM R Developers
  • Entity typePartnership
  • PartnersFarzana Rehan Multani, Sauman Aqeel Ahmad Momin, Rizwan Alimohammad Multani

Key dates

this monthRegisteredJun 2024First promiseNov 2026Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Jun 2024
  • Promised completion30 Mar 2027
  • Revised completionRevised to 30 Mar 2027 (originally 30 Nov 2026)
  • Buildings1 building record
  • Documents filed69 files

Current status

0%0 of 28 units booked
54.0%Work done, per cost certificate

Figures as on 22 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MULTANI RESIDENCYNA5528028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 48%.

MULTANI RESIDENCY: 43% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure48%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed25

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots25
Open Space25

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area800 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Rizwan Alimohammad MultaniBhiwandi (M Corp.)Thane
Reshma Rizwan MultaniBhiwandi (M Corp.)Thane

Approvals and building plan

Sanctioning authorityBHIWANDI NIZAMPUR MUNICIPAL CORPORATION
Permissible FSI2126.67
Proposed, not sanctioned1,389 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBhiwandi
Estimated costRs 3.40 cr
Cost incurredRs 1.84 cr
Work done54.0%
BuildingWingEstimatedIncurred
MULTANI RESIDENCYNARs 3.06 crRs 1.84 cr
-NARs 34.00 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM M ARCHITECTS
EngineerELITE STRUCTURES
Chartered AccountantB M CHAUHAN & CO
Chartered AccountantBM CHAUHAN & CO
Chartered AccountantMUKESH SONI
Chartered AccountantNITIN BALAJI DHAVAN
PartnerRole in project
M R Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P51700076655/WarNov 2026 → Mar 2027

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Mar 2027

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM 2A.pdf22 Sep 2026
Withdrawal Update Form 1File: FORM 1.pdf10 Sep 2026
Withdrawal Update Form 2File: Microsoft Word - FORM-2 Q1 26-27 30-06-2026 R0.pdf10 Sep 2026
Withdrawal Update Form 3File: FORM 3 - JUNE 2026 - MR DEVELOPERS.pdf10 Sep 2026
Form 5 (FY 2025-2026)File: FORM 5 - MR DEVELOPERS - FY 2025-2026.pdf29 Jul 2026
Withdrawal Update Form 1File: FORM-1 Q1 2026.pdf2 Jul 2026
Withdrawal Update Form 2File: FORM-2 Q4 25-26 31-03-2026 R1.pdf2 Jul 2026
Withdrawal Update Form 3File: FORM 3 AS ON 31-03-2026 OF MR DEVELOPERS.pdf2 Jul 2026
Withdrawal Update Form 1File: FORM 1 Q3 31-12-2025.pdf3 Jun 2026
Withdrawal Update Form 2File: FORM-2 Q4 25-26 09-03-2026 R0.pdf3 Jun 2026
Withdrawal Update Form 3File: FORM 3 AS ON 31 DEC 2025 M R DEVELOPERS.pdf3 Jun 2026
Form 1File: FORM 1 - Q4 24-25.pdf7 Jan 2026
Form 2File: FORM-2 Q4 24-25.pdf7 Jan 2026
Form 3File: FORM 3 Q4 24-25.pdf7 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCOLURE OF SOLD AND UNSOLD Q4 24-25.pdf7 Jan 2026
Withdrawal Update Form 1File: FORM 1 - Q1 25-26.pdf7 Jan 2026
Withdrawal Update Form 1File: FORM 1 - Q2 25-26.pdf7 Jan 2026
Withdrawal Update Form 2File: FORM-2 Q1 25-26.pdf7 Jan 2026
Withdrawal Update Form 2File: FORM-2 Q2 25-26.pdf7 Jan 2026
Withdrawal Update Form 3File: FORM 3 Q1 25-26.pdf7 Jan 2026
Withdrawal Update Form 3File: FORM 3 Q2 25-26.pdf7 Jan 2026
Form 1File: FORM 1.pdf2 Jan 2026
Form 2File: FORM 2.pdf2 Jan 2026
Form 3File: FORM 3 SIGNED.pdf2 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCOLURE OF SOLD AND UNSOLD Q1 24-25.pdf2 Jan 2026
Form 1File: FORM 1.pdf2 Jan 2026
Form 2File: FORM 2.pdf2 Jan 2026
Form 3File: FORM 3 SIGNED.pdf2 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCOLURE OF SOLD AND UNSOLD Q2 24-25.pdf2 Jan 2026
Form 1File: FORM 1.pdf2 Jan 2026
Form 2File: FORM 2.pdf2 Jan 2026
Form 3File: FORM 3 Signed.pdf2 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCOLURE OF SOLD AND UNSOLD Q3 24-25.pdf2 Jan 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Signed.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf25 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf25 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED 20-01-2025.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf25 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Reshma_compressed.pdf12 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: rera gmail.pdf16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Sauman.pdf16 May 2024
Other - LegalFile: 1.pdf16 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf9 Apr 2024
Proforma of Agreement for saleFile: AFS_Black_compressed 14-5-24.pdf9 Apr 2024
Deviation Report with respect to model copy of AgreementFile: Deviation - Agreement.pdf9 Apr 2024
Layout approvalFile: Drawing.pdf30 Mar 2024
Copy of the legal title reportFile: MR.pdf30 Mar 2024
Copy of Layout Approval (in case of layout)File: Drawing.pdf30 Mar 2024
Declaration about Commencement CertificateFile: Format - D.pdf30 Mar 2024
Other - TechnicalFile: Annexure A - One Project on registration.pdf30 Mar 2024
Details of encumbrances concerned to FinanceFile: No Encumbrances Certificate - Financial.pdf23 Mar 2024
Details of encumbrances concerned to FinanceFile: No Encumbrances Certificate - Legal.pdf23 Mar 2024
Details of encumbrances concerned to LegalFile: No Encumbrances Certificate - Financial.pdf23 Mar 2024
Details of encumbrances concerned to LegalFile: No Encumbrances Certificate - Legal.pdf23 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Certificate.pdf23 Mar 2024
Declaration in FORM BFile: ilovepdf_merged (17).pdf23 Mar 2024
CERSAI detailsFile: CERSAI Declaration (3).pdf23 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Rizwan.pdf23 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Farzana.pdf23 Mar 2024
Proforma of Allotment letterFile: Letter of Allotment (1).pdf23 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration (6).pdf23 Mar 2024
Deviation Report with respect to Allotment letterFile: Deviation - Allotment Letter.pdf23 Mar 2024
Building plan approvalFile: Drawing (4).pdf9 Mar 2024
PAN CardFile: M R Deveolper - Pan Card.pdf9 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Drawing (4).pdf9 Mar 2024

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 4 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MULTANI RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chavindre7,600+ in Thane

2 kmMULTANI RESIDENCYCompleted 6Lapsed / revoked 8Other 27Dot size: filed unitsN

Filed coordinates, straight-line distance. 41 registered projects within 2 km.

Builder: M R Developers

M R Developers has 1 registration on MahaRERA, including MULTANI RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if MULTANI RESIDENCY is delayed beyond 30 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MULTANI RESIDENCY?

The registered promoter entity is M R Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MULTANI RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MULTANI RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MULTANI RESIDENCY?

The professionals named in the filing: Architect: M M ARCHITECTS; Engineer: ELITE STRUCTURES; Chartered Accountant: B M CHAUHAN & CO; Chartered Accountant: BM CHAUHAN & CO; Chartered Accountant: MUKESH SONI; Chartered Accountant: NITIN BALAJI DHAVAN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MULTANI RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MULTANI RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MULTANI RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.