Home / Browse projects / Thane, Maharashtra / MUKTA AVENUE

Registered No litigation declared Residential / Group Housing project

MUKTA AVENUE

By MATOSHREE SPACE BUILDERS AND DEVELOPERS

RG-MH-07342 · RERA P51700055363 · Last updated on MahaRERA portal: 23 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
0 of 44Construction stages doneacross 4 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

MUKTA AVENUE is a Residential / Group Housing project by MATOSHREE SPACE BUILDERS AND DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700055363 on 22 Mar 2024. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NameMUKTA AVENUE
  • TypeResidential / Group Housing
  • Location
    • KHARDI DAWALE GAON
    • SHIL DIVA ROAD DIVA EAST
    • DIVA EAST
    • Thane (M Corp.)
    • Thane
    • 400612
  • Pincode400612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700055363
  • ReraGenie IDRG-MH-07342

Builder

  • NameMATOSHREE SPACE BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersARUNKUMAR NARAYANLALJI SAHALOT, KISHOR SAKHARAM PATIL, PRAVIN SAKHARAM PATIL
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Mar 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings4 building records
  • Documents filed82 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MUKTA AVENUE BUILDING-ENA80000
MUKTA AVENUE BUILDING-FNA80000
MUKTA AVENUE BUILDING-GNA80000
MUKTA AVENUE BUILDING-HNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 23 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 0%.

MUKTA AVENUE BUILDING-E0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
MUKTA AVENUE BUILDING-F0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
MUKTA AVENUE BUILDING-G0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
MUKTA AVENUE BUILDING-H0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Closed/Covered4
BuildingClosed/CoveredTotal
MUKTA AVENUE BUILDING-E11
MUKTA AVENUE BUILDING-F11
MUKTA AVENUE BUILDING-G11
MUKTA AVENUE BUILDING-H11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,400 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityTHANE MUNCIPLE CORPORATION
Permissible FSI6525.76
Proposed, not sanctioned6,521 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOFFICE NO 7 GROUND FLOORAKRUTI SMC, LBS MARG KHOPAT, THANE WEST THANE 400601

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJITESH P PAWAR
EngineerJIGAR J SOLANKI
Chartered AccountantPG RANADE
Chartered AccountantASHUTOSH TIWARI
PartnerRole in project
MATOSHREE SPACE BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form-1.pdf23 Apr 2026
Form 2File: Form-2.pdf23 Apr 2026
Form 3File: Form 3 of CA of 4th Qtr of Mukta Avenue for 2025-26.pdf23 Apr 2026
Disclosure of Sold and Booked InventoryFile: Matoshree Space Form C upto Match -2026.pdf23 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A.pdf23 Apr 2026
Form 5 (FY 2025-2026)File: Matoshree Form 5.pdf21 Apr 2026
Form 1File: Form 1 Matoshree.pdf18 Feb 2026
Form 2File: Form-2 Matoshree.pdf18 Feb 2026
Form 3File: Form 3 Matoshree.pdf18 Feb 2026
Disclosure of Sold and Booked InventoryFile: Discloser.pdf18 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A.pdf24 Oct 2025
Form 2A (FY 2023-2024)File: Form 2A.pdf24 Oct 2025
Form 1File: Form-1.pdf18 Oct 2025
Form 2File: Form 2.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: Discloser.pdf18 Oct 2025
Form 3File: Form-3.pdf18 Oct 2025
Form 5 (FY 2023-2024)File: Form 5 Matoshree.pdf18 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 Matoshree -2.pdf18 Oct 2025
Declaration and undertaking (Annexure A)File: Matoshree RERA 50-2024.pdf4 Jul 2025
Disclosure of Sold and Booked InventoryFile: 5-Mukta Avenue Sold-Unsold List Jan-25 to Mar-25.pdf4 Jul 2025
Form 2File: RERA CERTIFICATE-Q5 STRUCTURAL ENGNEER OF MATOSHREE.pdf4 Jul 2025
Form 3File: 5-FORM 3 OF CA AS ON 31ST MARCH-2025.pdf4 Jul 2025
Form 1File: Form 1 1-4-25.pdf4 Jul 2025
Form 2File: Form 2 QPR 4.pdf4 Jul 2025
Form 1File: Form 1 QPR 4.pdf4 Jul 2025
Form 3File: Form 3- QPR 4.pdf4 Jul 2025
Disclosure of Sold and Booked InventoryFile: Desclose QPR 4.pdf4 Jul 2025
Form 2File: Fom 2 QPR 3.pdf4 Jul 2025
Form 1File: Form 1 QPR 3.pdf4 Jul 2025
Form 3File: 3-FORM QPR 3.pdf4 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory QPR 3.pdf4 Jul 2025
Form 2File: Form 2 QPR 2.pdf4 Jul 2025
Form 1File: Form 1 QPR 2.pdf4 Jul 2025
Form 3File: Form 3 QPR 2.pdf4 Jul 2025
Disclosure of Sold and Booked InventoryFile: Invetory QPR 2.pdf4 Jul 2025
Form 1File: Form 1 QPR 1.pdf4 Jul 2025
Form 2File: Form 2 QPR 1.pdf4 Jul 2025
Form 3File: Form 3 QPR 1.pdf4 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory QPR 1.pdf4 Jul 2025
Building plan approval or NA orderFile: Vinisiti with Receipt of Matoshree Space.pdf2 Jul 2025
Commencement certificateFile: CC COPY MATOSHREE SPACE - SKMBT_C22023121819110.pdf2 Jul 2025
Other - TechnicalFile: Declaration cum Undertaking for RERA.pdf20 Mar 2024
Other - TechnicalFile: MATOSHTREE DECLARATION.pdf18 Mar 2024
Copy of the legal title reportFile: Title Certificate of Matoshree Space dated 17 Jan 2024 - converted.pdf5 Mar 2024
Other - LegalFile: Affidavit regarding Amalgmation.pdf21 Feb 2024
Other - LegalFile: CONVEYANCE - 5-16_11zon.pdf20 Feb 2024
Other - LegalFile: CONVEYANCE - 5-10_11zon.pdf20 Feb 2024
Other - LegalFile: CONVEYANCE - 5-18_11zon.pdf20 Feb 2024
Other - LegalFile: CONVEYANCE - 5-17_11zon.pdf20 Feb 2024
Other - LegalFile: CONVEYANCE 5-15_part-1_.pdf20 Feb 2024
Other - LegalFile: CONVEYANCE 5-15_part-2-.pdf20 Feb 2024
Other - LegalFile: Declaration-Matoshri_compressed.pdf20 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Matoshree space form 3_compressed.pdf12 Feb 2024
Proforma of Agreement for saleFile: Specimen Agreement to be entered into between Promoter and Allottee.pdf2 Feb 2024
Details of encumbrances concerned to FinanceFile: fiananace encrumbrance update.pdf27 Jan 2024
Details of encumbrances concerned to LegalFile: fiananace encrumbrance update.pdf27 Jan 2024
CERSAI detailsFile: cersai report update.pdf27 Jan 2024
Declaration about Commencement CertificateFile: DECLARAION CC TABULAR FORM.pdf25 Jan 2024
Declaration in FORM BFile: Adobe Scan 25 Jan 2024_compressed.pdf25 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure -A mahaRera.pdf25 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A mahaRera.pdf18 Jan 2024
Deviation Report with respect to Allotment letterFile: Deviation Report Allotment Letter Mukta Avenue.pdf18 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Sale Agreement Deviation Report Mukta Avenue.pdf18 Jan 2024
Details of encumbrances concerned to FinanceFile: encrumbrance letter.pdf9 Jan 2024
Details of encumbrances concerned to LegalFile: encrumbrance letter.pdf9 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration RERA Matoshree space_1.pdf8 Jan 2024
Layout approvalFile: SanctionPlanMatoshree.pdf29 Dec 2023
Copy of Layout Approval (in case of layout)File: SanctionPlanMatoshree.pdf29 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 engineer rera.pdf28 Dec 2023
Building plan approvalFile: MYSCAN_0002_compressed-compressed.pdf22 Dec 2023
Building plan approvalFile: MYSCAN_0003_compressed-compressed.pdf22 Dec 2023
Building plan approvalFile: MYSCAN_0004-compressed.pdf22 Dec 2023
Building plan approvalFile: MYSCAN_0005-compressed.pdf22 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_0002_compressed-compressed.pdf22 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_0003_compressed-compressed.pdf22 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_0004-compressed.pdf22 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_0005-compressed.pdf22 Dec 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf22 Dec 2023
Building plan approvalFile: Vinisiti with Receipt of Matoshree Space.pdf21 Dec 2023
PAN CardFile: Matoshree PAN Card .pdf21 Dec 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
MUKTA LAKE CITYSurvey no 4 10 A Khardi Dawale Gaon Shil Diva Road Diva East140CompletedJun 2021Late, Dec 2022

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MUKTA AVENUE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DIVA EAST7,600+ in Thane

2 kmMUKTA AVENUECompleted 45Lapsed / revoked 18Other 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 111 registered projects within 2 km.

Builder: MATOSHREE SPACE BUILDERS AND DEVELOPERS

MATOSHREE SPACE BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including MUKTA AVENUE. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if MUKTA AVENUE is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MUKTA AVENUE?

The registered promoter entity is MATOSHREE SPACE BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MUKTA AVENUE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MUKTA AVENUE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MUKTA AVENUE?

The professionals named in the filing: Architect: JITESH P PAWAR; Engineer: JIGAR J SOLANKI; Chartered Accountant: PG RANADE; Chartered Accountant: ASHUTOSH TIWARI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MUKTA AVENUE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MUKTA AVENUE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MUKTA AVENUE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.