ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / MSR SEASONS

Registration lapsed No litigation declared Residential / Group Housing project

MSR SEASONS

By Mind Space Realty Pvt. Ltd.

RG-MH-11968 · RERA P52100006114 · Last updated on MahaRERA portal: 11 Jul 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 16 complaints at MahaRERA
  • Completion date moved by 72 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
44 of 55Construction stages doneacross 5 buildings; furthest along: Excavation, 0%
9 of 188Units unsoldnot recorded sold or booked
16Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

MSR SEASONS is a Residential / Group Housing project by Mind Space Realty Pvt. Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100006114 on 14 Aug 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 72 months from the original filing. 179 of the 188 units on this registration are recorded sold or booked, and 44 of 55 construction stages are filed complete. 16 complaints are on record with the regulator.

At a glance

Project

  • NameMSR SEASONS
  • TypeResidential / Group Housing
  • Location
    • NEAR LOKMANYA HOSPITAL
    • CHINCHWAD
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100006114
  • ReraGenie IDRG-MH-11968

Builder

  • NameMind Space Realty Pvt. Ltd.
  • Entity typeCompany
  • DirectorPRASHANT BHANDARI
  • Other registrations2 more →
  • Completed2 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

10 months past promisethis monthRegisteredAug 2017First promiseDec 2019Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on14 Aug 2017
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2019)
  • Buildings5 building records
  • Documents filed75 files

Current status

95%179 of 188 units booked

Figures as on 11 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA171246046
WING BNA171246046
WING CNA171246046
WING DNA171246046
WING ENA21044

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 11 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

44 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Excavation, at 0%.

Wing A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING D100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING E0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes65%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes100%
Street LightingYes65%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed188

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots188
Closed/Covered188
BuildingClosed/CoveredTotal
Wing A4646
WING B4646
WING C4646
WING D4646
WING E44

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,799 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 Mar 2026
LandownerVillageDistrict
MINDSPACE REALTY PVT LTD-Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchawad Municipal Corporation
Permissible FSI13576.55
Proposed, not sanctioned8,507 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, JEHANGIR BUILDING, M G ROAD, FORT MUMBAI 400001

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShashank Phadke
ArchitectSolespace
Chartered AccountantAMP and Associates
Chartered AccountantNirmal Nahata And Associates
PartnerRole in project
Mind Space Realty Pvt. Ltd.-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100005145Dec 2019 → Dec 2020

Reason as filed by the promoterDue to unavoidable reasons the developer / promoter not able to complete the project till 31/12/2019. The project at present is nearing completion and work is in progress in full swing at site.

EXT52100009225Dec 2019 → Dec 2025

Reason as filed by the promoterAt present we have completed 1 Building comprising of Wing A & B, out of the 5 wings sanctioned and we have received Part Completion/ Occupancy certificate for the wing A and wing B for the (called as Phase I for short) from the Municipal Corporation of Pimpri Chinchwad which is uploaded on the Maha RERA website. We have only allotted units out of A & B Wing and have the consent of all for the allottees in the Agreements executed. The under construction of (Phase 2) building housing C, D & E wing have all unsold/unallotted units. Wing C, D and E of the project are delayed due to delayed approv

Complaints filed with MahaRERA16

Case no.ComplainantRespondentFiled
CC005000000022925Sarita Bhairu ChandekarPrashant Bhandari18/04/2019
CC005000000022926Kishor SurveMindspace Realty Pvt Ltd19/04/2019
CC005000000022959NITIN ASALKARPRASHANT BHANDARI26/04/2019
CC005000000064461Tushar Chandrakant DandawatePrashant Bhandari13/09/2020
CC005000000033555Sumedh Tendulkar1) Prashant Bhandari, 2) Mind Space Realty Ltd.21/10/2019
CC005000000033557Sindhu NairPrashant Bhandari21/10/2019
CC005000000033558Shital Patel1) Prashant Bhandari21/10/2019
CC005000000033559Vishal Shetty1) Prashant Bhandari 2) Mind Space Realty Ltd.21/10/2019
CC005000000043615Ms. Jyoti Dilip ShindeMindSpace Reality Pvt Ltd09/11/2019
CC005000000043635Amruta Dnyanesh Padaval & Dnyanesh N.PadavalMIND SPACE REALTY PVT LTD13/11/2019
CC005000000053843Bhushan P Pawar/Jagruti PawarMind Space Realty pvt ltd/Prashant Bhandhari28/12/2019
CC005000000053846VERY LATE POSSESSION and TILL NOW NO POSSESSION. WHILE BOOKING in 2015 PAID 85 AND TILL NOW 50 LAKHSPrashant Bhandari, Mind Space Realty Pvt Ltd18/10/2020
CC005000000053847SACHIN ARUN TAWAREMIND SPACE REALITY PVT.LTD/MR.PRASHANT BHANDARI06/01/2020
CC005000000054133Pravin Tarachandji BafnaMIND SPACE REALTY PVT. LTD. AND MR. PRASHANT OMPRAKASH BHANDARI AND ASHISH OMPRAKASH BHANDARI08/03/2020
CC005000000054145AIJAZ AHMED MULLAMIND SPACE REALTY PRIVATE LIMITED11/03/2020
CC005000000106567Santosh Ramdas GiramkarMind Space Realty Pvt. Ltd.01/02/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Jul 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Jul 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Oct 2024

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: 1 Layout Plan Seasons.pdf11 Jul 2026
Building plan approvalFile: 2 Lower Parking Plan AB Bldg Seasons.pdf11 Jul 2026
Building plan approvalFile: 3 Upper Parking Plan AB Bldg Seasons.pdf11 Jul 2026
Building plan approvalFile: 4 1st 2 4 6 10th Floor Plan AB Bldg Seasons.pdf11 Jul 2026
Building plan approvalFile: 5 3rd 5789th Floor Plan AB Bldg Seasons.pdf11 Jul 2026
Building plan approvalFile: 6 11th 12th Floor Plan AB Bldg Seasons.pdf11 Jul 2026
Building plan approvalFile: 7 Terrace Floor Plan AB Bldg Seasons.pdf11 Jul 2026
Building plan approvalFile: 8 Elevation Section Plan AB Bldg Seasons.pdf11 Jul 2026
Building plan approvalFile: 9 Lower Parking Plan CD Bldg Seasons.pdf11 Jul 2026
Building plan approvalFile: 10 Upper Parking Plan CD Bldg Seasons.pdf11 Jul 2026
Building plan approvalFile: 11 1st 2 4 Floor Plan CD Bldg Seasons.pdf11 Jul 2026
Building plan approvalFile: 12 3rd 5th Floor Plan CD Bldg Seasons.pdf11 Jul 2026
Building plan approvalFile: 13 6th 7 9 11 10th Floor Plan CD Bldg Seasons.pdf11 Jul 2026
Building plan approvalFile: 14 8th12th Floor Plan CD Bldg Seasons.pdf11 Jul 2026
Building plan approvalFile: 15 Terrace Floor Plan CD Bldg Seasons.pdf11 Jul 2026
Building plan approvalFile: 16 Elevation Section Plan CD Bldg Seasons.pdf11 Jul 2026
Building plan approvalFile: 17 Elevation Section Plan E Bldg Seasons.pdf11 Jul 2026
Building plan approvalFile: 18 Basement Ground Parking Plan E Bldg Sesons.pdf11 Jul 2026
Building plan approvalFile: 19 All Floor Plan E Bldg Seasons.pdf11 Jul 2026
Building plan approvalFile: 20 Parking Layout All Building Seasons.pdf11 Jul 2026
Withdrawal Update Form 1File: MSR - Form 1.pdf11 Jul 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf11 Jul 2026
Withdrawal Update Form 3File: Form_3_Rera_15032024.pdf11 Jul 2026
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf10 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ComplcertCD BLG11072024.pdf7 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Compl Certi 27062022PART2 MSR AB.pdf7 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ComplcertCD BLG11072024.pdf7 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Compl Certi 27062022PART2 MSR AB.pdf7 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ComplcertCD BLG11072024.pdf7 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Compl Certi 27062022PART2 MSR AB.pdf7 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ComplcertCD BLG11072024.pdf7 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Compl Certi 27062022PART2 MSR AB.pdf7 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 31122021.pdf9 Apr 2022
CERSAI detailsFile: CERSAI.pdf9 Feb 2022
Layout approvalFile: LAYOUT03122021.pdf2 Feb 2022
Copy of Layout Approval (in case of layout)File: LAYOUT03122021.pdf2 Feb 2022
Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf2 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf7 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf7 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form5 2018-2019.pdf7 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form5 2019-2020.pdf7 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form5 2020-2021.pdf7 Jan 2022
Disclosure of sold/ booked inventoryFile: Disclosure of sold and booked inventory.pdf4 Sep 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part1 Completion Certificate.pdf24 Nov 2020
Certificates of CA (Form 5)File: MSRSEASONFORM5.pdf30 Sep 2019
Details of encumbrancesFile: INDENTURE OF MORTGAGE - Index-II.pdf3 Apr 2019
Details of encumbrancesFile: RECTIFICATION OF THE INDENTURE - Index-II.pdf3 Apr 2019
OtherFile: INDENTURE OF MORTGAGE Capital India.pdf26 Mar 2019
OtherFile: RECTIFICATIONOFTHE INDENTURE OF MORTGAGE- IndexII.pdf26 Mar 2019
Certificates of CA (Form 5)File: Form5.pdf8 Oct 2018
Proforma of Allotment letterFile: MSR Seasons-Draft Agreement.pdf31 Mar 2018
Declaration in FORM BFile: FoemB-MSRSeasons.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CommencmentCertificate.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate.pdf29 Jul 2017
Certificates of CA (Form 3)File: Form3.pdf29 Jul 2017
Proforma of Allotment letterFile: AffidavitAgreementtosell.pdf29 Jul 2017
Building plan approvalFile: LayoutPlanPlotC.pdf27 Jul 2017
Layout approvalFile: layout plan.pdf27 Jul 2017
PAN CardFile: MSR PAN CARD.pdf27 Jul 2017
Copy of the legal title reportFile: Title Report.pdf27 Jul 2017
Details of encumbrancesFile: Encmubrance Report.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: layout plan.pdf27 Jul 2017
Building Plan Approval (IOD)File: LayoutPlanPlotC.pdf27 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf27 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
MSR CapitalCTS No 5864 Part Morwadi Pimpri 41101860CompletedAug 2015Aug 2015
MSR QueenstownPlot B CTS No 3876 Part Chinchwad Pune 411033725CompletedMar 2012Mar 2012

How this compares with Pune

95%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 72 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MSR SEASONS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHINCHWAD13,700+ in Pune

2 kmMSR SEASONSCompleted 103Lapsed / revoked 40Other 95Dot size: filed unitsN

Filed coordinates, straight-line distance. 238 registered projects within 2 km.

Builder: Mind Space Realty Pvt. Ltd.

Mind Space Realty Pvt. Ltd. has 3 registrations on MahaRERA, including MSR SEASONS and MSR OLIVE. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that MSR SEASONS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if MSR SEASONS is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MSR SEASONS?

The registered promoter entity is Mind Space Realty Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MSR SEASONS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MSR SEASONS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MSR SEASONS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MSR SEASONS?

The professionals named in the filing: Architect: Shashank Phadke; Architect: Solespace; Chartered Accountant: AMP and Associates; Chartered Accountant: Nirmal Nahata And Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MSR SEASONS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MSR SEASONS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MSR SEASONS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.