Home / Browse projects / Thane, Maharashtra / Mountain Greens
Mountain Greens
By Mountain Residency Private Limited
RG-MH-48579 · RERA P51700048979 · Last updated on MahaRERA portal: 15 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Mountain Greens is a Others project by Mountain Residency Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700048979 on 24 Jan 2023. Possession is promised by 31 Dec 2026.
At a glance
Project
- NameMountain Greens
- TypeOthers
- Location
- Survey No-45
- Adivali Dhokali
- Kalyan East
- Adivali Dhokali
- Ambarnath
- Thane
- 421306
- Pincode421306
- RERA no.P51700048979
- ReraGenie IDRG-MH-48579
Builder
- NameMountain Residency Private Limited
- Entity typeCompany
- DirectorsPradeep Kamlesh Mishra, Ashok Kumar Sankatha Prasad Shukla
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on24 Jan 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed123 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Mountain Greens | NA | 26 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.
Mountain Greens: 60% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed22
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership30
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Arun Pundalik Bhane | Adivali Dhokali | Thane |
| Balaram Pundalik Bhane | Adivali Dhokali | Thane |
| Mahadev Pundalik Bhane | Adivali Dhokali | Thane |
| Kamlabai Satyavan Patil | Adivali Dhokali | Thane |
| Parvatibai Abhimanyu Bhoir | Adivali Dhokali | Thane |
| Ravindra Undraya Bhane | Adivali Dhokali | Thane |
| Rajesh Undraya Bhane | Adivali Dhokali | Thane |
| Rekha Undraya Bhane | Adivali Dhokali | Thane |
| Parvati Undraya Bhane | Adivali Dhokali | Thane |
| Pandharinath Undraya Bhane | Adivali Dhokali | Thane |
| Sakhubai Sakharam Jadhav | Adivali Dhokali | Thane |
| Nirmala Baglya Bhane | Adivali Dhokali | Thane |
| Ananta Banglya Bhane | Adivali Dhokali | Thane |
| Yogita Rajesh Huddar | Adivali Dhokali | Thane |
| Mukesh Suresh Pawar | Adivali Dhokali | Thane |
| Sarita Vinod Gharat | Adivali Dhokali | Thane |
| Kisan Tukaram Bhane | Adivali Dhokali | Thane |
| Gajanan Tukaram Bhane | Adivali Dhokali | Thane |
| Vasant Tukaram Bhane | Adivali Dhokali | Thane |
| Sukhdev Tukaram Bhane | Adivali Dhokali | Thane |
| Pandurang Tukaram Bhane | Adivali Dhokali | Thane |
| Sharad Tukaram Bhane | Adivali Dhokali | Thane |
| Hirabai Sunil Vayale | Adivali Dhokali | Thane |
| Dropadabai Harishchandra Phulore | Adivali Dhokali | Thane |
| Devkubai Ganpat Bhane | Adivali Dhokali | Thane |
| Bharat Ganpat Bhane | Adivali Dhokali | Thane |
| Shashikant Ganpat Bhane | Adivali Dhokali | Thane |
| Deepak Ganpat Bhane | Adivali Dhokali | Thane |
| Bhaskar Ganpat Bhane | Adivali Dhokali | Thane |
| Dinesh Ganpat Bhane | Adivali Dhokali | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| Mountain Residency Private Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Mar 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Mar 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed123
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 - Mountain Greens as on June 2026.pdf | 15 Jul 2026 |
| Form 2File: Form 2 - Mountain Greens as on June 2026.pdf | 15 Jul 2026 |
| Form 3File: Form 3 - Mountain Greens as on June 2026.pdf | 15 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular-29- Mountain Greens as on June 2026.pdf | 15 Jul 2026 |
| Form 1File: Form 1-Mountain Greens as on June 2025.pdf | 19 May 2026 |
| Form 2File: Form 2 - Mountain Greens as on Sept 2025.pdf | 19 May 2026 |
| Form 3File: Form 3 - Mountain Greens as on 30-09-2025 (2).pdf | 19 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - June 2025.pdf | 19 May 2026 |
| Form 1File: Form 1 - Mountain Greens as on March 2026.pdf | 19 May 2026 |
| Form 2File: Form 2 - Mountain Greens as on March 2026.pdf | 19 May 2026 |
| Form 3File: Form 3 - Mountain Greens as on March 2026.pdf | 19 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Mountain greens as on 31-03-2026.pdf | 19 May 2026 |
| Form 1File: Form 1 - Mountain Greens as on Dec 2025.pdf | 18 Jan 2026 |
| Form 2File: Form 2 - Mountain Greens as on Dec 2025.pdf | 18 Jan 2026 |
| Form 3File: Form 3 - Mountain Greens as on 31-12-2025 .pdf | 18 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Mountain Greens as on Dec 2025.pdf | 18 Jan 2026 |
| Form 1File: Form 1 - Mountain Green as on Sep 2025.pdf | 19 Oct 2025 |
| Form 2File: Form 2 - Mountain Greens as on Sept 2025.pdf | 19 Oct 2025 |
| Form 3File: Form 3 - Mountain Greens as on 30-09-2025 (2).pdf | 19 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Sept 2025.pdf | 19 Oct 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: organized (1).pdf | 9 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Mountain Greens as on March 2025.pdf | 24 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 - March 2025.pdf | 24 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- March 2025_11zon.pdf | 24 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 - March 2025.pdf | 24 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: CIRCULAR -29 - March 2025_11zon.pdf | 24 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Mountain Greens as on 31-03-2025.pdf | 20 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Mountain Greens as on 31-12-2024 Previously Updated.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mountain Greens as on March 2025.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mountain Greens as on 31-12-2024 Previously Updated.pdf | 20 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Mountain Greens as on March 2025.pdf | 9 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 14 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 9 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 - Dec 2024.pdf | 11 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 - Dec 2024_11zon.pdf | 11 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Dec 2024.pdf | 11 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 - Mountain Green.pdf | 13 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 2022-23_compressed.pdf | 11 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 2023-24.pdf | 11 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Mountain Greens FY 2023-24.pdf | 9 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sept 2024.pdf | 2 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sept 2024_compressed.pdf | 2 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sept 2024_compressed.pdf | 2 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sept 2024.pdf | 2 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Circular 29 (Sept 2024)_compressed.pdf | 2 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Mountain Greens as on Sept 2024.pdf | 13 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Mountain Greens as on Sept 2024.pdf | 13 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mountain Greens as on Sept 2024.pdf | 13 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mountain Greens as on June 2024.pdf | 18 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Mountain Greens as on 30-06-2024.pdf | 18 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Mountain Greens as on June 2024.pdf | 5 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 2022-23.pdf | 13 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 2023-24.pdf | 13 May 2024 |
| Disclosure of sold/ booked inventoryFile: Circular-29.pdf | 13 May 2024 |
| Disclosure of sold/ booked inventoryFile: Circular-29.pdf | 13 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf | 13 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-05.pdf | 13 May 2024 |
| Declaration about Commencement CertificateFile: FORMAT-D.pdf | 11 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf | 11 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (2).pdf | 11 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mountain Greens as on March 2024.pdf | 6 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Mountain Greens as on 31-03-2024.pdf | 6 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Mountain Greens as on March 2024.pdf | 5 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC - Mountain Greens.pdf | 13 Mar 2024 |
| Layout approvalFile: Copy of layout.pdf | 12 Mar 2024 |
| Building plan approvalFile: Building Plan.pdf | 12 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Finance Letter - Mountain Greens.pdf | 12 Mar 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance Finance Letter - Mountain Greens.pdf | 12 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: Copy of layout.pdf | 12 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf | 12 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf | 12 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: MOUNTAIN GREENS_compressed.pdf | 24 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Mountain Greens as on Dec 2023.pdf | 8 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mountain Greens as on Dec 2023.pdf | 5 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Mountain Greens as on Dec 2023.pdf | 5 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Mountain Greens as on March 2023.pdf | 14 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Mountain Greens as on June 2023.pdf | 14 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Mountain Greens as on Sep 2023.pdf | 14 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mountain Greens as on March 2023.pdf | 14 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mountain Greens as on June 2023.pdf | 14 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mountain Greens as on Sept 2023.pdf | 14 Dec 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 123 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Mountain Greens on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Adivali Dhokali, Kalyan East7,600+ in Thane
Kohinoor Eden
KGI REALTY PRIVATE LIMITED
Olympia City Phase 1
Balaji Rattan Lifespaces
Krishna Trident
Sonawane Infrastructure Private Limited
Rai s Heaven
RAI RESIDENCY Private Limited
Metro Grande Tower C and D
West Pioneer Properties India Pvt Ltd
SEASON SAHARA BUILDING NO 4 AND 5
SAMARTH SAI BUILDERS & DEVELOPERS
See every Thane project, with the district possession charts
Builder: Mountain Residency Private Limited
Mountain Residency Private Limited has 1 registration on MahaRERA, including Mountain Greens. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Mountain Greens is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Mountain Greens?
The registered promoter entity is Mountain Residency Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Mountain Greens?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Mountain Greens?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in Mountain Greens?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback