Home / Browse projects / Mumbai Suburban, Maharashtra / MOTI MADHAV

Registered No litigation declared Others project

MOTI MADHAV

By AADHYA SKYVISTA

RG-MH-17945 · RERA P51800055563 · Last updated on MahaRERA portal: 6 Aug 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
9 of 11Construction stages donefurthest along: Basement (if any), 0%
12 of 13Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

MOTI MADHAV is a Others project by AADHYA SKYVISTA in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800055563 on 2 Apr 2024. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 6 months from the original filing. 1 of the 13 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameMOTI MADHAV
  • TypeOthers
  • Location
    • 10.03 Mt Ram Mandir Road
    • Vile Parle East
    • Vileparle
    • Andheri
    • Mumbai Suburban
    • 400057
  • Pincode400057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800055563
  • ReraGenie IDRG-MH-17945

Builder

  • NameAADHYA SKYVISTA
  • Entity typePartnership
  • PartnersHIREN JIVRAJ PATEL, GAUTAM JIVRAJ PATEL

Key dates

1 months past promisethis monthRegisteredApr 2024First promiseMar 2026Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Apr 2024
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 31 Mar 2026)
  • Buildings1 building record
  • Documents filed82 files

Current status

8%1 of 13 units booked
88.0%Work done, per cost certificate

Figures as on 6 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MOTI MADHAVNA1111213

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

MOTI MADHAV: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area460 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
Declared on21 Feb 2026
LandownerVillageDistrict
Moti Madhav Co-Operative Housing Society LimitedVileparleMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1235.03
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGrd Flr, Shop Nos 5 to 10 and Commercial Space No-1, Paradise Plaza CHSL, Karani Lane, Ghatkopar W
Estimated costRs 6.95 cr
Cost incurredRs 6.12 cr
Work done88.0%
BuildingWingEstimatedIncurred
MOTI MADHAVNARs 6.95 crRs 6.12 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAASHISH R SOLANKI
EngineerS V PATEL & ASSOCIATES
EngineerHITESH SOLANKI
EngineerSUNIL SHAH
EngineerPARIKH & KULKARNI
Chartered AccountantKARTIK JAYANTILAL PATEL
Chartered AccountantMEHTA BHARAT & ASSOCIATES
PartnerRole in project
AADHYA SKYVISTA-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA19032620275Mar 2026 → Sep 2026

Reason as filed by the promoter1) The area is which project is to be constructed and completed is entirely a residential area, therefore there are limitations in time of construction work on daily basis. 2) We experienced cautious approach adopted by prospective customers, many buyers are preferring to invest only after the receipt of the Occupation Certificate (OC) to ensure greater security and certainty. This shift in buyer sentiment has also contributed to slower bookings and delayed fund inflows. 3) The extension is mainly sought to complete the remaining finishing work and to obtain the Occupation Certificate (OC) fro

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 of RERA updated_30_06_26.pdf6 Aug 2026
Withdrawal Update Form 2File: Form 2 30_06_26 Final.pdf6 Aug 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 Signed.pdf6 Aug 2026
Withdrawal Update Form 130 Apr 2026
Withdrawal Update Form 230 Apr 2026
Withdrawal Update Form 330 Apr 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 Scanned.pdf23 Feb 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 Scanned.pdf23 Feb 2026
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf23 Feb 2026
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf23 Feb 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 Scanned.pdf23 Feb 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 Scanned.pdf23 Feb 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 Signed.pdf21 Feb 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 Signed.pdf21 Feb 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 Scanned.pdf21 Feb 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 Scanned.pdf21 Feb 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 Signed.pdf21 Feb 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 Signed.pdf21 Feb 2026
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf21 Feb 2026
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf21 Feb 2026
Withdrawal Update Form 3File: Withdrawal Application Form 3 Scanned.pdf21 Feb 2026
Withdrawal Update Form 3File: Withdrawal Application Form 3 Scanned.pdf21 Feb 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 Scanned.pdf21 Feb 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 Scanned.pdf21 Feb 2026
Form 5 (FY 2024-2025)File: FORM 5_Final_scanned_sign.pdf30 Sep 2025
Form 2A (FY 2024-2025)File: Form_2A_24_25.pdf13 Jun 2025
Form 1File: Form 1 30_06_24.pdf6 Jun 2025
Form 2File: Form 2 30_06_24.pdf6 Jun 2025
Form 3File: Form 3 30_06_2024.pdf6 Jun 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure Aadhya Skyvista 30_06_24.pdf6 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration 30_06_24.pdf6 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration 30_09_24.pdf6 Jun 2025
Form 1File: Form 1 30_09_24.pdf6 Jun 2025
Form 2File: Form 2 30_09_24.pdf6 Jun 2025
Form 3File: Form 3 30_09_2024.pdf6 Jun 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure Aadhya Skyvista 30_09_24.pdf6 Jun 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure Aadhya Skyvista 31_12_24.pdf6 Jun 2025
Form 1File: Form 1 31_12_24.pdf6 Jun 2025
Form 2File: Form 2 31_12_24.pdf6 Jun 2025
Form 3File: Form 3 31_12_2024.pdf6 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration 31_12_24.pdf6 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration 31_03_25.pdf6 Jun 2025
Form 1File: Form 1 31_03_25.pdf6 Jun 2025
Form 2File: Form 2 31_03_25.pdf6 Jun 2025
Form 3File: Form 3 31_03_2025.pdf6 Jun 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure Aadhya Skyvista 31_03_25.pdf6 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Uploaded.pdf27 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Uploaded.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf25 Dec 2024
Disclosure of sold/ booked inventoryFile: Inventory Disclosure Aadhya Skyvista.pdf25 Dec 2024
Disclosure of sold/ booked inventoryFile: Inventory Disclosure Aadhya Skyvista 25122024.pdf25 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 24-25.pdf25 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 of RERA updated as on 20122024.pdf23 Dec 2024
Layout approvalFile: Drawing (7).pdf20 Dec 2024
Layout approvalFile: 2436046Amendletter_signed.pdf20 Dec 2024
Details of encumbrances concerned to FinanceFile: Drawing (7).pdf20 Dec 2024
Copy of Layout Approval (in case of layout)File: Drawing (7).pdf20 Dec 2024
Copy of Layout Approval (in case of layout)File: 2436046Amendletter_signed.pdf20 Dec 2024
Details of encumbrances concerned to LegalFile: Drawing (7).pdf20 Dec 2024
Declaration in FORM BFile: Form B- Promoter- Moti Madhav.pdf14 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Firm_merged (2).pdf14 Mar 2024
Proforma of Agreement for saleFile: AFS_Moti Madhav_Aadhya Skyvista_13032024 (1).pdf14 Mar 2024
Proforma of Allotment letterFile: Allotment letter_Moti Madhav_Aadhya Skyvista_13032024 (1).pdf14 Mar 2024
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter (29).pdf14 Mar 2024
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement (40).pdf14 Mar 2024
Other - LegalFile: Aadhya skyvista Partnership Deed (1).pdf14 Mar 2024
Layout approvalFile: 1 Building Plan Approval _ NA Order for plotted development (13).pdf13 Mar 2024
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development (13).pdf13 Mar 2024
PAN CardFile: 1 PAN Card (26).pdf13 Mar 2024
Copy of the legal title reportFile: Title Report for Resbumission_11zon.pdf13 Mar 2024
Details of encumbrances concerned to FinanceFile: No ENCUMBRANCE LETTER -Dues.pdf13 Mar 2024
Details of encumbrances concerned to FinanceFile: No ENCUMBRANCE LETTER Litigations.pdf13 Mar 2024
Details of encumbrances concerned to LegalFile: No ENCUMBRANCE LETTER -Dues.pdf13 Mar 2024
Details of encumbrances concerned to LegalFile: No ENCUMBRANCE LETTER Litigations.pdf13 Mar 2024
Copy of Layout Approval (in case of layout)File: 1 Building Plan Approval _ NA Order for plotted development (13).pdf13 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development (13).pdf13 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development (24).pdf13 Mar 2024
Declaration about Commencement CertificateFile: FORMAT D(32) (1).pdf13 Mar 2024
CERSAI detailsFile: Declaration of Cersai (1).pdf13 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (7)_11zon (1).pdf13 Mar 2024

How this compares with Mumbai Suburban

8%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 6 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MOTI MADHAV on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vile Parle East6,700+ in Mumbai Suburban

2 kmMOTI MADHAVCompleted 135Lapsed / revoked 63Other 141Dot size: filed unitsN

Filed coordinates, straight-line distance. 339 registered projects within 2 km.

Builder: AADHYA SKYVISTA

AADHYA SKYVISTA has 1 registration on MahaRERA, including MOTI MADHAV. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if MOTI MADHAV is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MOTI MADHAV?

The registered promoter entity is AADHYA SKYVISTA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MOTI MADHAV?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MOTI MADHAV?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MOTI MADHAV?

The professionals named in the filing: Architect: AASHISH R SOLANKI; Engineer: S V PATEL & ASSOCIATES; Engineer: HITESH SOLANKI; Engineer: SUNIL SHAH; Engineer: PARIKH & KULKARNI; Chartered Accountant: KARTIK JAYANTILAL PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MOTI MADHAV?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MOTI MADHAV. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MOTI MADHAV to a free account