Home / Browse projects / Pune, Maharashtra / MORYA SKYDALE

Registered No litigation declared Others project

MORYA SKYDALE

By ROYAL NISARG VENTURES LLP

RG-MH-51738 · RERA P52100055584 · Last updated on MahaRERA portal: 17 Oct 2026

Source: official MahaRERA filing

Red flags

  • Rs 46.00 crore secured on the land, in favour of ADITYA BIRLA CAPITAL LIMITED
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • No extension sought by the promoter; the date moved only under MahaRERA's automatic 4-month extension
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2030Possession promisedmoved 4 months by MahaRERA order
7 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 60%
119 of 136Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 151 documents Report an error

MORYA SKYDALE is a Others project by ROYAL NISARG VENTURES LLP in Pune, Maharashtra, registered with MahaRERA as P52100055584 on 4 Apr 2024. Possession is promised by 30 Apr 2030. The completion date has moved by 4 months under MahaRERA's automatic 4-month extension for the West Asia conflict, which the promoter did not apply for. 17 of the 136 units on this registration are recorded sold or booked, and 7 of 22 construction stages are filed complete.

At a glance

Project

  • NameMORYA SKYDALE
  • TypeOthers
  • Location
    • -
    • THERGAON
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055584
  • ReraGenie IDRG-MH-51738

Builder

  • NameROYAL NISARG VENTURES LLP
  • Entity typePartnership
  • PartnersSAJID GULABHUSEN BAGWAN, PRAVIN JAYANTIBHAI POKAR, HIMATLAL RATANSHI POKAR, ASHOK RATANSHI POKAR, HARESH DEVCHAND CHAUDHARI, SUJIT VASANT PATIL, TUKARAM CHANDAR TUPE, GANESH BABANRAO PINJAN, BHIMRAO RAMCHANDRA KALE

Key dates

this monthRegisteredApr 2024First promiseDec 2029Revised toApr 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Apr 2024
  • Promised completion30 Apr 2030
  • Revised completionRevised to 30 Apr 2030 (originally 30 Dec 2029)
  • Buildings2 building records
  • Documents filed151 files

Current status

12%17 of 136 units booked
62.4%Work done, per cost certificate

Figures as on 17 Oct 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AB WINGCommercial Wing AB, Wing A, Wing B25216850118
C/MHADA WINGNA7618018

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 60%.

AB WING · wing Commercial Wing AB, Wing A, Wing B33%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure33%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises7%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C/MHADA WING47%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed324

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots324
Closed/Covered324
BuildingClosed/CoveredTotal
AB WING Commercial Wing AB, Wing A, Wing B297297
C/MHADA WING2727

Land and ownership5

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area6,300 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared present
Charge in favour ofADITYA BIRLA CAPITAL LIMITED
Secured amountRs 46.00 crore
CERSAI search filedYes
Declared on9 Sep 2026
LandownerVillageDistrict
BALASAHEB VISHNUPANT GAWADEPimpri Chinchawad (M Corp.)Pune
SUSHMA PANDURANG GAWADEPimpri Chinchawad (M Corp.)Pune
SWAPNIL PANDURANG GAWADEPimpri Chinchawad (M Corp.)Pune
SAMIR PANDURANG GAWADEPimpri Chinchawad (M Corp.)Pune
SWATI GANESH PINJANPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri-Chinchwad Municipal Corporation
Permissible FSI18260.33
Proposed, not sanctioned18,256 sq m
Buildings approved4
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 12,13,14, SUKHWANI PACIFIC PHASE2, S NO 31 OPP ADITYA BIRLA HOSPITAL,PUNE 411033
Estimated costRs 55.11 cr
Cost incurredRs 34.39 cr
Work done62.39%
BuildingWingEstimatedIncurred
AB WINGCommercial Wing AB, Wing A, Wing BRs 33.65 crRs 20.18 cr
C/MHADA WINGNARs 15.84 crRs 9.50 cr
-NARs 5.62 crRs 4.71 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLANDMARK DG
EngineerAmol Manik Sarate
EngineerM/S. AJAY BHILARE AND ASSOCIATES
EngineerPLANEDGE CONSULTANTS PVT LTD
Chartered AccountantCA VIRAG AJAY DESAI
Chartered AccountantMuttha & Lahoti Chartered Accountant
Chartered AccountantM.K Chhajed & Co.
Chartered AccountantMUTTHA AND LAHOTI
Chartered AccountantA S JANGADA & ASSOCIATES
PartnerRole in project
ROYAL NISARG VENTURES LLP-

Extensions1

A revised date filed with the regulator does not change the possession date in your agreement for sale. Commentary on the order notes that a buyer's right to interest for delay under section 18 of RERA may still stand; that question has not been tested.

MahaRERA order of 7 Aug 2026Dec 2029 → Apr 2030

Granted by MahaRERA, not applied for by the promoterMahaRERA's order of 7 August 2026 extended the completion date of eligible registered projects by four months, treating the West Asia conflict as force majeure. Promoters did not have to apply for it.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2030

Documents filed151

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 151 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: MORYA SKYDALE FORM-1 QTR-II.pdf17 Oct 2026
Withdrawal Update Form 2File: FORM -2 MORYA SKYDALE QTR-II.pdf17 Oct 2026
Withdrawal Update Form 3File: Form3.pdf17 Oct 2026
Form 5 (FY 2025-2026)File: Form 5 final.pdf1 Oct 2026
Withdrawal Update Form 1File: Form 1 Q1 FY 2026-27.pdf12 Sep 2026
Withdrawal Update Form 2File: Form 2 Q1 FY 2025-26.pdf12 Sep 2026
Withdrawal Update Form 3File: Form 3 Q1 FY 2025-26.pdf12 Sep 2026
Layout approvalFile: Layout Plan.pdf11 May 2026
Layout approvalFile: Building Plan 11.pdf11 May 2026
Building plan approvalFile: Building Plan 01.pdf11 May 2026
Building plan approvalFile: Building Plan 02.pdf11 May 2026
Building plan approvalFile: Building Plan 03.pdf11 May 2026
Building plan approvalFile: Building Plan 04.pdf11 May 2026
Building plan approvalFile: Building Plan 05.pdf11 May 2026
Building plan approvalFile: Building Plan 06.pdf11 May 2026
Building plan approvalFile: Building Plan 07.pdf11 May 2026
Building plan approvalFile: Building Plan 08.pdf11 May 2026
Building plan approvalFile: Building Plan 09.pdf11 May 2026
Building plan approvalFile: Building Plan 10.pdf11 May 2026
Building plan approvalFile: Building Plan 12.pdf11 May 2026
Form 2A (FY 2024-2025)File: FORM 2A 31-03-2025.pdf11 May 2026
Form 2A (FY 2025-2026)File: FORM 2A 31-03-2026.pdf11 May 2026
Withdrawal Update Form 1File: Form 1 Q4 FY 2025-26.pdf4 May 2026
Withdrawal Update Form 2File: Form 2 Q4 FY 2025-26.pdf4 May 2026
Withdrawal Update Form 3File: Form 3 Q4 FY 2025-26.pdf4 May 2026
Withdrawal Update Form 1File: FORM 1 Q2 FY 2025-26.pdf31 Mar 2026
Withdrawal Update Form 1File: FORM 1 Q3 FY 2025-26.pdf31 Mar 2026
Withdrawal Update Form 2File: Form 2 Q2 FY 2025-26.pdf31 Mar 2026
Withdrawal Update Form 2File: FORM 2 Q3 FY 2025-26.pdf31 Mar 2026
Withdrawal Update Form 3File: FORM 3 Q2 FY 2025-26.pdf31 Mar 2026
Withdrawal Update Form 3File: FORM 3 Q3 FY 2025-26.pdf31 Mar 2026
Form 5 (FY 2024-2025)File: Form -5.pdf30 Mar 2026
Form 1File: Architect's Certificate (1).pdf18 Aug 2025
Form 1File: Architect's Certificate.pdf18 Aug 2025
Form 1File: Architect's Certificate Q-3.pdf18 Aug 2025
Form 2File: Engineer's Certificate Q-1.pdf18 Aug 2025
Form 2File: Engineer's Certificate Q-2.pdf18 Aug 2025
Form 2File: Engineer's Certificate Q-3.pdf18 Aug 2025
Form 3File: CA Certificate Q-1.pdf18 Aug 2025
Form 3File: CA Certificate Q-2_11zon.pdf18 Aug 2025
Form 3File: CA Certificate Q-3.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Q-1.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Q-2.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Q-3.pdf18 Aug 2025
Withdrawal Update Form 1File: RNV Architect Certificate.pdf18 Aug 2025
Withdrawal Update Form 2File: RNV Engineer Certificate.pdf18 Aug 2025
Withdrawal Update Form 3File: RNV CA Certificate (1).pdf18 Aug 2025
Layout approvalFile: Layout 1-13_11zon.pdf24 Jul 2025
Building plan approvalFile: Plan 2-13_11zon.pdf24 Jul 2025
Building plan approvalFile: Plan 3-13_11zon.pdf24 Jul 2025
Building plan approvalFile: Plan 4-13_11zon.pdf24 Jul 2025
Building plan approvalFile: Plan 5-13_11zon.pdf24 Jul 2025
Building plan approvalFile: Plan 6-13_11zon.pdf24 Jul 2025
Building plan approvalFile: Plan 7-13_11zon.pdf24 Jul 2025
Building plan approvalFile: Plan 8-13_11zon.pdf24 Jul 2025
Building plan approvalFile: Plan 9-13_11zon.pdf24 Jul 2025
Building plan approvalFile: Plan 10-13_11zon.pdf24 Jul 2025
Building plan approvalFile: Plan 11-13_11zon.pdf24 Jul 2025
Building plan approvalFile: Plan 12-13_11zon.pdf24 Jul 2025
Building plan approvalFile: Plan 13-13_11zon.pdf24 Jul 2025
Form 1File: Architect Certificate March 2025.pdf23 May 2025
Form 2File: Engineer Certificate March 2025.pdf23 May 2025
Form 3File: CA Certificate March 2025.pdf23 May 2025
Disclosure of Sold and Booked InventoryFile: sold unsold March 2025.pdf23 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate 30 9 24.pdf7 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate 31 12 24.pdf7 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30-6-24 f2.pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate (1).pdf6 Mar 2025
Layout approvalFile: Layout 01_11zon.pdf26 Feb 2025
Building plan approvalFile: Plan 02_11zon.pdf26 Feb 2025
Building plan approvalFile: Plan 03_11zon.pdf26 Feb 2025
Building plan approvalFile: Plan 04_11zon.pdf26 Feb 2025
Building plan approvalFile: Plan 05_11zon.pdf26 Feb 2025
Building plan approvalFile: Plan 06_11zon.pdf26 Feb 2025
Building plan approvalFile: Plan 07_11zon.pdf26 Feb 2025
Building plan approvalFile: Plan 08_11zon.pdf26 Feb 2025
Building plan approvalFile: Plan 09_11zon.pdf26 Feb 2025
Building plan approvalFile: Plan 10_11zon.pdf26 Feb 2025
Building plan approvalFile: Plan 11_11zon.pdf26 Feb 2025
Building plan approvalFile: Plan 12_11zon.pdf26 Feb 2025

How this compares with Pune

12%of this project is bookeddistrict median 29%
28%of Pune projects moved their completion datethis one moved by 4 months
25%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 14,000+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MORYA SKYDALE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near THERGAON14,000+ in Pune

2 kmMORYA SKYDALECompleted 131Lapsed / revoked 50Other 81Dot size: filed unitsN

Filed coordinates, straight-line distance. 262 registered projects within 2 km.

Builder: ROYAL NISARG VENTURES LLP

ROYAL NISARG VENTURES LLP has 1 registration on MahaRERA, including MORYA SKYDALE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MORYA SKYDALE is delayed beyond 30 Apr 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MORYA SKYDALE?

The registered promoter entity is ROYAL NISARG VENTURES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MORYA SKYDALE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MORYA SKYDALE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MORYA SKYDALE?

The professionals named in the filing: Architect: LANDMARK DG; Engineer: Amol Manik Sarate; Engineer: M/S. AJAY BHILARE AND ASSOCIATES; Engineer: PLANEDGE CONSULTANTS PVT LTD; Chartered Accountant: CA VIRAG AJAY DESAI; Chartered Accountant: Muttha & Lahoti Chartered Accountant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MORYA SKYDALE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MORYA SKYDALE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MORYA SKYDALE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.