MORYA RESIDENCY
RG-MH-28467 · RERA P52800026050 · Last updated on MahaRERA portal: 30 Mar 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 3 completed earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MORYA RESIDENCY is a Residential / Group Housing project by MANOJ VASANT MAHADIK in Ratnagiri, Maharashtra, registered with MahaRERA as P52800026050 on 12 Aug 2020. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 12 months from the original filing. 17 of the 32 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameMORYA RESIDENCY
- TypeResidential / Group Housing
- Location
- GONDESAKHAL ROAD
- Lanja
- Lanja (CT)
- Ratnagiri
- 416701
- Pincode416701
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52800026050
- ReraGenie IDRG-MH-28467
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on12 Aug 2020
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 30 Jun 2025)
- Buildings1 building record
- Documents filed81 files
Current status
Figures as on 30 Mar 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MORYA RESIDENCY | NA | 6 | 4 | 32 | 0 | 32 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
MORYA RESIDENCY: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 30 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SUBHASH BABAJI GURAV | Ratnagiri (M Cl) | Ratnagiri |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| MORYA RESIDENCY | NA | Rs 2.25 cr | Rs 2.62 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KAUSTUBH MANOHAR ZAGADE |
| Engineer | KAUSTUBH MANOHAR ZAGADE |
| Chartered Accountant | KPT AND ASSOCIATES LLP |
| Chartered Accountant | Amol Gajanan Khanolkar |
| Chartered Accountant | Swapnil Modi |
| Partner | Role in project |
|---|---|
| MANOJ VASANT MAHADIK | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterApplied for Occupancy Certificate, process is taking time so need few more days for it.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Aug 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Aug 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Aug 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Aug 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed81
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE 30 JUNE 2025.pdf | 30 Mar 2026 |
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE 30 SEPT 2025.pdf | 30 Mar 2026 |
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE 30 SEPT 2025.pdf | 30 Mar 2026 |
| Withdrawal Update Form 2File: ENGINEER CERTIFICATE JUNE 2025 (1).pdf | 30 Mar 2026 |
| Withdrawal Update Form 2File: ENGINEER CERTIFICATE SEPT 2025 (1).pdf | 30 Mar 2026 |
| Withdrawal Update Form 2File: ENGINEER CERTIFICATE SEPT 2025 (1).pdf | 30 Mar 2026 |
| Withdrawal Update Form 3File: FORM (3) 30-06-2025.pdf | 30 Mar 2026 |
| Withdrawal Update Form 3File: FORM (3) 30-09-2025.pdf | 30 Mar 2026 |
| Withdrawal Update Form 3File: FORM (3) 30-09-2025.pdf | 30 Mar 2026 |
| Form 2A (FY 2024-2025)File: FORM 2(A) APRIL 2024 TO MARCH 2025.pdf | 30 Mar 2026 |
| Form 5 (FY 2024-2025)File: FORM 5 01-04-24 TO 31-03-2025 MORYA RESIDENCY.pdf | 30 Mar 2026 |
| Form 1File: ARCHITECT'SS CER 31 MARCH 2025.pdf | 30 Jun 2025 |
| Form 2File: ENGINEER'S CER 31 MARCH 2025.pdf | 30 Jun 2025 |
| Form 3File: FORM 3 Morya Residency_compressed.pdf | 30 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory.pdf | 30 Jun 2025 |
| Withdrawal Update Form 1File: ARCHITECTu0027SS CER 31 MARCH 2025.pdf | 29 Jun 2025 |
| Withdrawal Update Form 1File: ARCHITECTu0027SS CER 31 MARCH 2025.pdf | 29 Jun 2025 |
| Withdrawal Update Form 2File: ENGINEERu0027S CER 31 MARCH 2025.pdf | 29 Jun 2025 |
| Withdrawal Update Form 2File: ENGINEERu0027S CER 31 MARCH 2025.pdf | 29 Jun 2025 |
| Withdrawal Update Form 3File: form-3 old morya residency.pdf | 29 Jun 2025 |
| Withdrawal Update Form 3File: FORM 3 Morya Residency_compressed.pdf | 29 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 JAN24 TO MAR 2024 MAHADIK.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 APRIL TO JUNE 2024 MAHADIK.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 JULY TO SEP 2024 MAHADIK.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 OCT TO DEC 2024 MAHADIK.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 JAN TO MARCH 2024 MAHADIK.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 APRIL TO JUNE 2024 MAHADIK_compressed.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 JULY TO SEP 2024 MAHADIK.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 OCT TO DEC 2024 MAHADIK.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 JAN TO MAR 2024 MAHADIK.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 APRIL TO JUNE 2024 MAHADIK.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 JULY TO SEPT 2024 MAHADIK.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 OCT TO DEC 2024 MAHADIK.pdf | 20 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold_and_Booked_Inventory LANJA (1) (1) (1).pdf | 20 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A MAHADIK.pdf | 20 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 Mahadik.pdf | 20 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20 TO 21.pdf | 5 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21 TO 22.pdf | 5 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22to 23.pdf | 5 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFCATE 31 MARCH 2023_20240327_0001.pdf | 28 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE 30 JUN 2023_20240327_0001.pdf | 28 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE 30 SEP 2023_20240327_0001.pdf | 28 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE 31 DEC 2023_20240327_0001.pdf | 28 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE 31 MARCH 2023_20240327_0001.pdf | 28 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE 30 JUNE 2023_20240327_0001.pdf | 28 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE 30 SEPT 2023_20240327_0001.pdf | 28 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE 31 DEC 2023_20240327_0001.pdf | 28 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 31-3-23 (1)_compressed.pdf | 28 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM-3- 30-06-23_compressed.pdf | 28 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA - FORM-3 30-09-23_compressed.pdf | 28 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CIRTIFICATE FORM-3 31-12-23_compressed.pdf | 28 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 CA CIRTIFICATE_22-23.pdf | 28 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 morya residency31122022.pdf | 19 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 morya residency31032022.pdf | 19 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form5 morya residency 20-21_compressed.pdf | 19 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form5 morya residency 21-22_compressed.pdf | 19 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT MAR 21.pdf | 18 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS DEC 21.pdf | 18 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S JUNE 21.pdf | 18 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S MAR 20.pdf | 18 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS DEC 21.pdf | 18 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS JUNE 21.pdf | 18 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS MAR 20.pdf | 18 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS MAR 21.pdf | 18 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QUALITY ASSURANCE MAR 20.pdf | 18 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Morya Residency.pdf | 25 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Morya Residency.pdf | 25 Jan 2022 |
| Layout approvalFile: PLAN LAYOUT.pdf | 9 Aug 2020 |
| Building plan approvalFile: PLAN LAYOUT.pdf | 9 Aug 2020 |
| PAN CardFile: PAN.pdf | 9 Aug 2020 |
| Copy of the legal title reportFile: TITLE SEARCH.pdf | 9 Aug 2020 |
| Details of encumbrancesFile: DECLARATION.pdf | 9 Aug 2020 |
| Copy of Layout Approval (in case of layout)File: PLAN LAYOUT.pdf | 9 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN LAYOUT.pdf | 9 Aug 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 9 Aug 2020 |
| Declaration in FORM BFile: AFFIDAVIT.pdf | 9 Aug 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 9 Aug 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf | 9 Aug 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 9 Aug 2020 |
| Proforma of Allotment letterFile: AGREEMENT TO SALE.pdf | 9 Aug 2020 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| MAHADIK PLAZAP52900055325 | TALERE, Sindhudurg | 46 | Mar 2024 | Ongoing | Dec 2026 | Not due yet |
| SHREE RESIDENCYP52900025958 | PLOT NO 4, Sindhudurg | - | Aug 2020 | Completed | Nov 2023 | Apr 2022 |
| VAKRATUNDA PLAZA | AT AND POST TALERE KANKAWLI | 1 | - | Completed | Mar 2017 | Mar 2017 |
| MANGALMURTI RESIDENCY | AANAND NAGAR KASARDE KANKAWLI SINDHUDURG | 1 | - | Completed | Mar 2017 | Mar 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Ratnagiri
Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 81 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MORYA RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Lanja1,100+ in Ratnagiri
Filed coordinates, straight-line distance. 19 registered projects within 2 km.
SAI SAMARTH MAULI
SAMARTH BUILDER
SAI SAMARTH HERITAGE
SAI SAMARTH BUILDERS
Taj City Centre and Taj Residency
K. M. DEVELOPERS
LANJA CITY PRIDE PHASE I
TECHNOBUILT INFRA
Kripalu Heights
SUNIL MANOHARLAL PURI
Swapnsrushti-5
Hemant Madhukar Naik
See every Ratnagiri project, with the district possession charts
Builder: MANOJ VASANT MAHADIK
MANOJ VASANT MAHADIK has 5 registrations on MahaRERA, including SIDDHI GANESH PARK and SHREE RESIDENCY. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Ratnagiri district page.
Frequently asked questions
What does it mean that MORYA RESIDENCY shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if MORYA RESIDENCY is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MORYA RESIDENCY?
The registered promoter entity is MANOJ VASANT MAHADIK, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MORYA RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MORYA RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MORYA RESIDENCY?
The professionals named in the filing: Architect: KAUSTUBH MANOHAR ZAGADE; Engineer: KAUSTUBH MANOHAR ZAGADE; Chartered Accountant: KPT AND ASSOCIATES LLP; Chartered Accountant: Amol Gajanan Khanolkar; Chartered Accountant: Swapnil Modi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MORYA RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback