Home / Browse projects / Pune, Maharashtra / Mont Vert Sonnet

Completed No litigation declared Others project

Mont Vert Sonnet

By Greenlife Constructions

RG-MH-20501 · RERA P52100004227 · Last updated on MahaRERA portal: 3 Jun 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 5 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2023Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Internal walls, 97%
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

Mont Vert Sonnet is a Others project by Greenlife Constructions in Pune, Maharashtra, registered with MahaRERA as P52100004227 on 9 Aug 2017. The registration is recorded completed; possession was promised by 31 May 2023. The completion date has moved by 5 months from the original filing.

At a glance

Project

  • NameMont Vert Sonnet
  • TypeOthers
  • Location
    • Akemi Business School Road
    • Wakad
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100004227
  • ReraGenie IDRG-MH-20501

Builder

  • NameGreenlife Constructions
  • Entity typePartnership
  • PartnersChintan H Dhamsania, Akshay R Faldu, Hasmukhlal P Dhamsania

Key dates

this monthRegisteredAug 2017First promiseDec 2022Revised toMay 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Aug 2017
  • Promised completion31 May 2023
  • Revised completionRevised to 31 May 2023 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed75 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Mont Vert SonnetNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 97%.

Mont Vert Sonnet: 87% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Sanitary Fittings within the flats / premises93%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks77%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.94%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.94%

Progress on shared amenities15

As on 3 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes20%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes60%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed80

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots80
Closed/Covered80

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,141 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Yuvraj Eknath SandbhorPune (M Corp.)Pune

Approvals and building plan

Permissible FSI6276.19
Proposed, not sanctioned2,252 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPashan Baner Link Road Pune 411021

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSiddharth Harishchandrakar
ArchitectAB Architects
EngineerJW Consultant
PartnerRole in project
Greenlife Constructions-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100013175Dec 2022 → May 2023

Reason as filed by the promoterThe validity of current registration is up to 30/12/2022. However, due to prolonged monsoon the peripheral work including excavation for under ground water tank, grey water treatment plant and drainage lines got delayed. For the same reason, the water proofing of top terrace, external painting and installation of windows got delayed by at least 3 months. At present 2 months are requires for completing all physical work and there after 2 months will be required for getting completion certificate. Hence we are requesting extension up to 31-05-2023 under section 6. Our efforts are on to complete

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Nov 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Apr 2023

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Sonnet signed.pdf3 Jun 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 RERA Sonnet.pdf31 May 2023
Certificates of CA (Form 3)File: Form 3 M V Sonnet Mar 23 Qtr.pdf25 May 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: FILE ACK society formation Sonnet.pdf13 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 M V Sonnet Mar 23.pdf8 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 M V Sonnet Mar 23.pdf8 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A M V Sonnet Mar 23.pdf8 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory M V Sonnet Mar 23.pdf8 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: MontVert 108 Sonnet Completion.pdf5 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Sonnet declaration society formation.pdf20 Mar 2023
Certificates of CA (Form 3)File: Form 3 Sonnet March 2022.pdf25 Feb 2023
Certificates of CA (Form 3)File: Form 3 Sonnet June 2022.pdf25 Feb 2023
Certificates of CA (Form 3)File: Form 3 M V Sonnet Mar 19.pdf25 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 M V Sonnet Mar 21.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 M V Sonnet Mar 19.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 M V Sonnet June 20.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 M V Sonnet Mar 22.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 M V Sonnet Mar 19.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 M V Sonnet Aug 20.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 M V Sonnet Mar 21.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 M V Sonnet Mar 22.pdf16 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 M V Sonnet FY 18-19.pdf6 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 M V Sonnet FY 19-20.pdf6 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 M V Sonnet FY 20-21.pdf6 Feb 2023
Declaration about Commencement CertificateFile: Declaration About Commencement.pdf10 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A M V Sonnet.pdf10 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory M V Sonnet Dec 2022 qtr.pdf10 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SONNET FORM 5.pdf10 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory M V Sonnet Mar 22.pdf23 Apr 2022
Building plan approvalFile: elevation.pdf29 Nov 2021
Building plan approvalFile: upper floors.pdf29 Nov 2021
Building plan approvalFile: section.pdf29 Nov 2021
Building plan approvalFile: layout 1 to 7.pdf29 Nov 2021
Building plan approvalFile: ground 1 to 9.pdf29 Nov 2021
Building plan approvalFile: 11th floor refuge floors.pdf29 Nov 2021
Building Plan Approval (IOD)File: elevation.pdf29 Nov 2021
Building Plan Approval (IOD)File: upper floors.pdf29 Nov 2021
Building Plan Approval (IOD)File: section.pdf29 Nov 2021
Building Plan Approval (IOD)File: layout 1 to 7.pdf29 Nov 2021
Building Plan Approval (IOD)File: ground 1 to 9.pdf29 Nov 2021
Building Plan Approval (IOD)File: 11th floor refuge floors.pdf29 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: Sonnet CC oct 2021.pdf29 Nov 2021
Disclosure of sold/ booked inventoryFile: Inventory Report M V Sonnet.pdf14 Jul 2021
Building plan approvalFile: ilovepdf_merged(1)_compressed.pdf6 Jan 2021
Building Plan Approval (IOD)File: ilovepdf_merged(1)_compressed.pdf6 Jan 2021
Commencement Certificates / NA Order for plotted developmentFile: DOC006.PDF6 Jan 2021
Details of encumbrancesFile: Greenlife Piramal CF declaration.pdf4 Feb 2019
Certificates of CA (Form 5)File: M V Sonnet_Scan Form RERA.pdf30 Sep 2018
Proforma of Allotment letterFile: LR Sonnet RERA agg version 2 feb 16 2018.pdf16 Feb 2018
Proforma of Allotment letterFile: RERA allotment format.pdf13 Feb 2018
Proforma of Allotment letterFile: LR Sonnet RERA final Agg 1.pdf13 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 M V Sonnet Feb 2018.pdf7 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 M V Sonnet.pdf31 Jul 2017
Certificates of CA (Form 3)File: Sonnet Form 3.PDF31 Jul 2017
Building plan approvalFile: Sonnet Sanctioned Plans 4_resize.pdf29 Jul 2017
Building plan approvalFile: Sonnet Sanctioned Plans 5_resize.pdf29 Jul 2017
Building plan approvalFile: Sonnet Sanctioned Plans 1_resize.pdf29 Jul 2017
Building plan approvalFile: Sonnet Sanctioned Plans 2_resize.pdf29 Jul 2017
Building plan approvalFile: Sonnet Sanctioned Plans 3_resize.pdf29 Jul 2017
Layout approvalFile: Sonnet Sanctioned Plans 1_resize.pdf29 Jul 2017
PAN CardFile: Greenlife Construction Pan Card.pdf29 Jul 2017
Copy of the legal title reportFile: Sonnet Title search report.pdf29 Jul 2017
Details of encumbrancesFile: Sonnet Declaration.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Sonnet Sanctioned Plans 1_resize.pdf29 Jul 2017
Building Plan Approval (IOD)File: Sonnet Sanctioned Plans 1_resize.pdf29 Jul 2017
Building Plan Approval (IOD)File: Sonnet Sanctioned Plans 2_resize.pdf29 Jul 2017
Building Plan Approval (IOD)File: Sonnet Sanctioned Plans 3_resize.pdf29 Jul 2017
Building Plan Approval (IOD)File: Sonnet Sanctioned Plans 4_resize.pdf29 Jul 2017
Building Plan Approval (IOD)File: Sonnet Sanctioned Plans 5_resize.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Sonnet Commencement certificate.pdf29 Jul 2017
Declaration in FORM BFile: Sonnet Form B.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 M V Sonnet LR.pdf29 Jul 2017
Proforma of Allotment letterFile: Sonnet Declaration Agreement.pdf29 Jul 2017
OtherFile: Sonnet Proposed Plan for revision 1.pdf29 Jul 2017
OtherFile: Sonnet Proposed Plan for revision 2.pdf29 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 5 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mont Vert Sonnet on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wakad13,700+ in Pune

2 kmMont Vert SonnetCompleted 162Lapsed / revoked 119Other 152Dot size: filed unitsN

Filed coordinates, straight-line distance. 433 registered projects within 2 km.

Builder: Greenlife Constructions

Greenlife Constructions has 1 registration on MahaRERA, including Mont Vert Sonnet. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Mont Vert Sonnet is delayed beyond 31 May 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mont Vert Sonnet?

The registered promoter entity is Greenlife Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mont Vert Sonnet?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mont Vert Sonnet?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mont Vert Sonnet?

The professionals named in the filing: Architect: Siddharth Harishchandrakar; Architect: AB Architects; Engineer: JW Consultant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mont Vert Sonnet?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mont Vert Sonnet. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mont Vert Sonnet to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.