ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / MONARQUE BY VTP LUXE PHASE 2

Registered Litigation declared Residential / Group Housing project

MONARQUE BY VTP LUXE PHASE 2

By MEXUS REAL ESTATE DEVELOPERS LLP

RG-MH-31106 · RERA P52100079440 · Last updated on MahaRERA portal: 17 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 2 complaints at MahaRERA
  • Rs 250.00 crore secured on the land, in favour of Tata Capital Housing Finance Limited

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 0%
110 of 144Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

MONARQUE BY VTP LUXE PHASE 2 is a Residential / Group Housing project by MEXUS REAL ESTATE DEVELOPERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100079440 on 6 Mar 2025. Possession is promised by 31 Dec 2029. 34 of the 144 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameMONARQUE BY VTP LUXE PHASE 2
  • TypeResidential / Group Housing
  • Location
    • Hinjewadi
    • Hinjavadi (CT)
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • RERA no.P52100079440
  • ReraGenie IDRG-MH-31106

Builder

  • NameMEXUS REAL ESTATE DEVELOPERS LLP
  • Entity typePartnership
  • Authorised SignatoriesAYUSH ARUN JHANWAR, SUMIT RAMESH DIWANE
  • Other registrations3 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Mar 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed68 files

Current status

24%34 of 144 units booked
3.7%Work done, per cost certificate

Figures as on 17 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower-2NA40351440144

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Tower-2: 9% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed302

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots302
Closed/Covered151
Open Space151

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,649 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofTata Capital Housing Finance Limited
Secured amountRs 250.00 crore
CERSAI search filedYes
Declared on10 Mar 2026
LandownerVillageDistrict
Ashdan Township Ventures Private LimitedBanerPune

Approvals and building plan

Sanctioning authorityPUNE METROPOLITAN REGIONAL DEVELOPMENT AUTHORITY
Permissible FSI27619.37
Proposed, not sanctioned25,619 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Office No. 1, Plot No. 55/56/57/58, Lalwani Plaza, A Wing, Sakore Nagar, Pune.411014, Maharashtra
Estimated costRs 102.11 cr
Cost incurredRs 3.82 cr
Work done3.74%
BuildingWingEstimatedIncurred
Tower-2NARs 91.90 crRs 3.82 cr
-NARs 10.21 cr-

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVk:a architecture
ArchitectANA Consortium Pvt Ltd
EngineerGA Bhilare Consultants Pvt Ltd
EngineerSHITAL KADAM
EngineerVinay Abhyankar
Chartered AccountantSAC & Co LLP
Chartered AccountantPushpak Bogati
Chartered AccountantPriyanka Chordiya & Associates
PartnerRole in project
MEXUS REAL ESTATE DEVELOPERS LLP-

Litigation declared1

CaseCourtStatus
16/2025DIVISIONAL COMMISSIONERClosed

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12602282MEXUS REAL ESTATE DEVELOPERS LLPALISHAN UBID KHAN18/04/2026
CC12602283MEXUS REAL ESTATE DEVELOPERS LLPMRS PRADNYA RAVINDRA KAWARE18/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form No-2A- Monarque Phase-2.pdf17 Jun 2026
Withdrawal Update Form 1File: FORM-1 MONARQUE PHASE 2.pdf15 Apr 2026
Withdrawal Update Form 2File: FORM 2 MONARQUE PHASE 2.pdf15 Apr 2026
Withdrawal Update Form 3File: FORM 3 MONARQUE PHASE 2.pdf15 Apr 2026
Withdrawal Update Form 1File: RERA FORM-1 MONARQUE PHASE 2.pdf16 Jan 2026
Withdrawal Update Form 2File: RERA- FORM 2 MONARQUE Phase 2.pdf16 Jan 2026
Withdrawal Update Form 3File: Form 3 VTP Monarque Phase 2_compressed.pdf16 Jan 2026
Withdrawal Update Form 1File: FORM-1 MONARQUE PHASE 2.pdf16 Oct 2025
Withdrawal Update Form 2File: FORM 2 MONARQUE PHASE 2.pdf16 Oct 2025
Withdrawal Update Form 3File: form 3 Vtp Monarque phase 2 10-02-2024 sign_11zon.pdf16 Oct 2025
Form 5 (FY 2024-2025)File: FORM 5- MONARUQE PHASE 2.pdf18 Sep 2025
Form 1File: Form 1 Monarque ph 2.pdf22 May 2025
Form 2File: Form 2 Monarque Phse 2.pdf22 May 2025
Form 3File: Form 3 VTP Monarque Phase 2 F 31032025.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: MONARQUE PH2 31032025.pdf22 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1- MONARQUE PHASE 2.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Monarque ph 2.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 VTP Monarque Phase 2.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Monarque Phse 2.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: MONARQUE PH2 31032025.pdf4 Apr 2025
Other - LegalFile: organized (56)_organized.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Vtp Monarque phase 2 10-02-2024 sign_11zon.pdf11 Feb 2025
Other - TechnicalFile: 2 Other - Technical (38).pdf11 Feb 2025
Other - TechnicalFile: 3 Other - Technical (19).pdf11 Feb 2025
Other - TechnicalFile: 4 Other - Technical (14).pdf11 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: Merged PDF- VTP.pdf11 Feb 2025
Layout approvalFile: Master Layout - VTP Monarque Phase II.pdf14 Jan 2025
Building plan approvalFile: Master Layout - VTP Monarque Phase II.pdf14 Jan 2025
Building plan approvalFile: 2 Building Plan Approval _ NA Order for plotted development (37).pdf14 Jan 2025
Building plan approvalFile: 3 Building Plan Approval _ NA Order for plotted development (30).pdf14 Jan 2025
Building plan approvalFile: 4 Building Plan Approval _ NA Order for plotted development (23).pdf14 Jan 2025
Building plan approvalFile: 5 Building Plan Approval _ NA Order for plotted development (22).pdf14 Jan 2025
Building plan approvalFile: 6 Building Plan Approval _ NA Order for plotted development (19).pdf14 Jan 2025
Building plan approvalFile: 7 Building Plan Approval _ NA Order for plotted development (17).pdf14 Jan 2025
Building plan approvalFile: 8 Building Plan Approval _ NA Order for plotted development (14).pdf14 Jan 2025
PAN CardFile: 1 PAN Card (64).pdf14 Jan 2025
Copy of the legal title reportFile: 1 Copy of the legal title report (69).pdf14 Jan 2025
Details of encumbrances concerned to FinanceFile: legal vtp final.pdf14 Jan 2025
Details of encumbrances concerned to FinanceFile: ENC WRT FINANCE.pdf14 Jan 2025
Copy of Layout Approval (in case of layout)File: Master Layout - VTP Monarque Phase II.pdf14 Jan 2025
Proforma of Allotment letterFile: 1 Proforma of Allotment letter (61).pdf14 Jan 2025
Declaration in FORM BFile: FORM B- MEXUS 11022025 (1)_rotated.pdf14 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development (48).pdf14 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 3 Building Plan Approval _ NA Order for plotted development (30).pdf14 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 8 Building Plan Approval _ NA Order for plotted development (14).pdf14 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 7 Building Plan Approval _ NA Order for plotted development (17).pdf14 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan Approval _ NA Order for plotted development (19).pdf14 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 5 Building Plan Approval _ NA Order for plotted development (22).pdf14 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 4 Building Plan Approval _ NA Order for plotted development (23).pdf14 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 2 Building Plan Approval _ NA Order for plotted development (37).pdf14 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Master Layout - VTP Monarque Phase II.pdf14 Jan 2025
Other - LegalFile: 5 Other - Legal (10).pdf14 Jan 2025
Other - LegalFile: 3 Other - Legal (18).pdf14 Jan 2025
Other - LegalFile: 2 Other - Legal (20).pdf14 Jan 2025
Other - LegalFile: 1 Other - Legal (33).pdf14 Jan 2025
Other - LegalFile: 4 Other - Legal.pdf14 Jan 2025
Declaration about Commencement CertificateFile: format d- vtp final.pdf14 Jan 2025
CERSAI detailsFile: organized (51).pdf14 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A (9).pdf14 Jan 2025
Deviation Report with respect to Allotment letterFile: DEVIATION WRT ALLOTEMENT LETTER (2).pdf14 Jan 2025
Details of encumbrances concerned to LegalFile: ENC WRT FINANCE.pdf14 Jan 2025
Details of encumbrances concerned to LegalFile: legal vtp final.pdf14 Jan 2025
Other - FinanceFile: land declaration (1).pdf14 Jan 2025
Other - TechnicalFile: 1 Other - Technical (95).pdf14 Jan 2025
Deviation Report with respect to model copy of AgreementFile: organized (53).pdf14 Jan 2025
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (97).pdf14 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: organized (52).pdf14 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B- Bank Declaration (1).pdf14 Jan 2025

How this compares with Pune

24%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MONARQUE BY VTP LUXE PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hinjewadi13,700+ in Pune

Builder: MEXUS REAL ESTATE DEVELOPERS LLP

MEXUS REAL ESTATE DEVELOPERS LLP has 4 registrations on MahaRERA, including MONARQUE BY VTP LUXE PHASE 1 and VTP VOLARE. Its filings disclose 1 earlier MahaRERA project, none completed yet. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MONARQUE BY VTP LUXE PHASE 2 is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MONARQUE BY VTP LUXE PHASE 2?

The registered promoter entity is MEXUS REAL ESTATE DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MONARQUE BY VTP LUXE PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MONARQUE BY VTP LUXE PHASE 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MONARQUE BY VTP LUXE PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MONARQUE BY VTP LUXE PHASE 2?

The professionals named in the filing: Architect: Vk:a architecture; Architect: ANA Consortium Pvt Ltd; Engineer: GA Bhilare Consultants Pvt Ltd; Engineer: SHITAL KADAM; Engineer: Vinay Abhyankar; Chartered Accountant: SAC & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MONARQUE BY VTP LUXE PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MONARQUE BY VTP LUXE PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MONARQUE BY VTP LUXE PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.