Home / Browse projects / Pune, Maharashtra / Mokate Kalanidhi
Mokate Kalanidhi
By SHARADA ALLIANCE PROMOTERS & BUILDERS
RG-MH-70770 · RERA P52100053442 · Last updated on MahaRERA portal: 4 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 4 months
- 1 extension taken
- Rs 30.00 crore secured on the land, in favour of SMFG India Home Finance Company Ltd
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Mokate Kalanidhi is a Residential / Group Housing project by SHARADA ALLIANCE PROMOTERS & BUILDERS in Pune, Maharashtra, registered with MahaRERA as P52100053442 on 1 Nov 2023. Possession is promised by 30 Apr 2029. The completion date has moved by 4 months from the original filing. 3 of the 121 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameMokate Kalanidhi
- TypeResidential / Group Housing
- Location
- D. P. Road
- Kothrud
- Haveli
- Pune
- 411038
- Pincode411038
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100053442
- ReraGenie IDRG-MH-70770
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on1 Nov 2023
- Promised completion30 Apr 2029
- Revised completionRevised to 30 Apr 2029 (originally 31 Dec 2028)
- Buildings2 building records
- Documents filed154 files
Current status
Figures as on 4 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Commercial | NA | 11 | 11 | 0 | 23 | 23 |
| Residential | NA | 18 | 18 | 98 | 0 | 98 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 4 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 50%.
Commercial32%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Residential32%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 4 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed362
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Commercial | 76 | 13 | 89 |
| Residential | 273 | 0 | 273 |
Land and ownership28
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Dattatraya Raghunath Mokate | Kothrud | Pune |
| Vanita Dattatraya Mokate | Kothrud | Pune |
| Nita Sachin Mokate | Kothrud | Pune |
| Jayashri Kiran More | Kothrud | Pune |
| Shubhangi Dattatraya Gole | Kothrud | Pune |
| Aasha Sagar Nikate | Kothrud | Pune |
| Ashok Raghunath Mokate | Kothrud | Pune |
| Aarti Ashok Mokate | Kothrud | Pune |
| Atharv Ashok Mokate | Kothrud | Pune |
| Shobha Dilip Kindare | Kothrud | Pune |
| Kalpana Bandu Sanas | Kothrud | Pune |
| Alpana Rohidas Pilane | Kothrud | Pune |
| Kalpana Shrikant Mokate | Kothrud | Pune |
| Nilesh Shrikant Mokate | Kothrud | Pune |
| Reshma Nilesh Mokate | Kothrud | Pune |
| Yogesh Shrikant Mokate | Kothrud | Pune |
| Madhuri Yogesh Mokate | Kothrud | Pune |
| Arun Balbhim Mokate | Kothrud | Pune |
| Sangita Arun Mokate | Kothrud | Pune |
| Savita Arun Mokate | Kothrud | Pune |
| Eklavya Arun Mokate | Kothrud | Pune |
| Sarvashri Sagar Dagade | Kothrud | Pune |
| Chandrakant Balbhim Mokate | Kothrud | Pune |
| Rashmi Chandrakant Mokate | Kothrud | Pune |
| Pruthviraj Chandrakant Mokate | Kothrud | Pune |
| Ankita Pruthviraj Mokate | Kothrud | Pune |
| Gayatri Omkar Bhosale | Kothrud | Pune |
| Sheela Murlidhar Barate | Kothrud | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Residential | NA | Rs 45.36 cr | Rs 19.83 cr |
| Commercial | NA | Rs 19.44 cr | Rs 8.50 cr |
| - | NA | Rs 8.82 cr | Rs 3.82 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ankur Associates & Architects Kulkarni |
| Engineer | Sandip Naise |
| Chartered Accountant | P B SHAH |
| Chartered Accountant | Rushabh Jain |
| Partner | Role in project |
|---|---|
| SHARADA ALLIANCE PROMOTERS & BUILDERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterNA
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12600492 | Ram Gawali | SHARADA ALLIANCE PROMOTERS & BUILDERS | 20/07/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Sep 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Jul 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Aug 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Aug 2026Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Apr 2029
Documents filed154
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 154 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2023-2024)File: Form 2A - 2024 Kalanidhi.pdf | 4 Sep 2026 |
| Form 2A (FY 2024-2025)File: Form 2A - 2025 Kalanidhi.pdf | 4 Sep 2026 |
| Form 2A (FY 2025-2026)File: Form 2A - 2026 Kalanidhi.pdf | 4 Sep 2026 |
| Form 5 (FY 2023-2024)File: Form 5 Kalanidhi 23-24.pdf | 4 Sep 2026 |
| Form 1File: Form 1 Kalanidhi July 2024.pdf | 3 Sep 2026 |
| Form 2File: Form 2 July 24.pdf | 3 Sep 2026 |
| Form 3File: RERA FROM 3 DT 05-07-2024.pdf | 3 Sep 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf | 3 Sep 2026 |
| Commencement certificateFile: C C -1075-2026.pdf | 7 Aug 2026 |
| Building plan approvalFile: HPSC0336_compressed.pdf | 7 Aug 2026 |
| Building plan approvalFile: HPSC0337_compressed.pdf | 7 Aug 2026 |
| Building plan approvalFile: HPSC0338_compressed.pdf | 7 Aug 2026 |
| Building plan approvalFile: HPSC0339_compressed.pdf | 7 Aug 2026 |
| Building plan approvalFile: HPSC0340_compressed.pdf | 7 Aug 2026 |
| Building plan approvalFile: HPSC0341_compressed.pdf | 7 Aug 2026 |
| Building plan approvalFile: HPSC0342_compressed.pdf | 7 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 July 2026.pdf | 7 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 July 2026.pdf | 7 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 July 2026.pdf | 7 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 April 2026 Kalanidhi.pdf | 27 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 April 2026 Kalanidhi.pdf | 27 Jul 2026 |
| Withdrawal Update Form 3File: Form 3_compressed (2).pdf | 27 Jul 2026 |
| Commencement certificateFile: CC NO 3415 DT 04-12-2025.pdf | 25 Jul 2026 |
| Building plan approvalFile: HPSC0096.pdf | 25 Jul 2026 |
| Building plan approvalFile: HPSC0097.pdf | 25 Jul 2026 |
| Building plan approvalFile: Sheet 3.pdf | 25 Jul 2026 |
| Building plan approvalFile: Sheet 4.pdf | 25 Jul 2026 |
| Building plan approvalFile: Sheet 5.pdf | 25 Jul 2026 |
| Building plan approvalFile: HPSC0101.pdf | 25 Jul 2026 |
| Building plan approvalFile: Sheet 7.pdf | 25 Jul 2026 |
| Layout approvalFile: Plan 1.pdf | 25 Jul 2026 |
| Layout approvalFile: Plan 2.pdf | 25 Jul 2026 |
| Layout approvalFile: Paln 3.pdf | 25 Jul 2026 |
| Form 1File: FORM 1 .pdf | 25 Jul 2026 |
| Form 2File: Form 2 Kalanidhi Jan 2024.pdf | 25 Jul 2026 |
| Form 3File: Form 3 .pdf | 25 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold inventory.pdf | 25 Jul 2026 |
| Form 1File: Form 1 Kalanidhi July 2024.pdf | 25 Jul 2026 |
| Form 2File: Form 2 July 24.pdf | 25 Jul 2026 |
| Form 3File: RERA FORM 5 DT 05-07-2024_compressed.pdf | 25 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf | 25 Jul 2026 |
| Form 1File: Form 1 Kalanidh October 2024.pdf | 25 Jul 2026 |
| Form 2File: Form 2 Kalanidhi.pdf | 25 Jul 2026 |
| Form 3File: Form 3 Kalanidhi.pdf | 25 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf | 25 Jul 2026 |
| Form 1File: Form 1 kalanidhi.pdf | 25 Jul 2026 |
| Form 2File: Form 2 Kalanidhi Jan 25.pdf | 25 Jul 2026 |
| Form 3File: Form 3 Jan 25.pdf | 25 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf | 25 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 kalanidhi.pdf | 25 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 July 2025 Kalanidhi.pdf | 25 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 October 2025 Kalanidhi.pdf | 25 Jul 2026 |
| Withdrawal Update Form 1File: FORM 1 KALANIDHI JAN 26.pdf | 25 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Kalanidhi Jan 25.pdf | 25 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 July 2025 Kalanidhi.pdf | 25 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 October 2025 Kalanidhi.pdf | 25 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Kalanidhi Jan 26.pdf | 25 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 Jan 25.pdf | 25 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 July 2025.pdf | 25 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 October 2025.pdf | 25 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 Kalanidhi Jan 26.pdf | 25 Jul 2026 |
| Form 1File: Form 1 Kalanidhi April 2025.pdf | 24 Jul 2026 |
| Form 2File: Form 2 Kalanidhi April 25.pdf | 24 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Book Inventory April 2025.pdf | 24 Jul 2026 |
| Form 3File: Form 3 Kalanidhi April 2025_compressed (1).pdf | 24 Jul 2026 |
| Form 5 (FY 2024-2025)File: Kalanidhi Form 5 for 24-25.pdf | 6 Jul 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 July 2025 Kalanidhi.pdf | 24 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHARADA ALLIANCE PROMOTERS AND BUILDERS FORM 3 15-07-2025_compressed.pdf | 24 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 July 2025 Kalanidhi.pdf | 24 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Kalanidhi April 2025.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Kalanidhi April 2025_compressed.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Kalanidhi April 25.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Book Inventory April 2025.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 kalanidhi.pdf | 22 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jan 25_compressed (1).pdf | 22 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Kalanidhi Jan 25.pdf | 22 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Kalanidh October 2024.pdf | 8 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Kalanidhi.pdf | 8 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Kalanidhi.pdf | 8 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA FORM 5 DT 05-07-2024_compressed.pdf | 22 Jul 2024 |
Promoter's earlier projects8
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| PARITOSH II | BALEWADI | 149 | Completed | Mar 2022 | Mar 2022 |
| MEGHSPARSH II | AMBEGAON | 48 | Completed | Aug 2018 | Late, Sep 2018 |
| PARITOSH I | BALEWADI | 131 | Completed | Dec 2016 | Late, Mar 2017 |
| STEP ONE | KOTHRUD | 15 | Completed | Apr 2015 | Nov 2014 |
| SPANDAN D12 D13 | WARJE | 70 | Completed | May 2014 | Late, Jul 2014 |
| MEGHSPARSH I | AMBEGAON | 172 | Completed | Mar 2014 | Apr 2013 |
| SPANDAN | WARJE | 27 | Completed | Mar 2013 | Late, Apr 2013 |
| SPANDAN RESIDENCY | WARJE | 28 | Completed | Feb 2013 | Jan 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 154 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Mokate Kalanidhi on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kothrud13,700+ in Pune
Filed coordinates, straight-line distance. 301 registered projects within 2 km.
Pratik Nagar Palladio Kothrud Central
Vilas Javdekar Infinitee Developers Pvt. L
NEW FRIENDS
MAJESTIQUE DUROPOLIS PRIVATE LIMITED
SARVATRA CO-OP HSG SOCIETY LTD
Suryakant Kakade
Kshitij Residency
Yash Buildcon
MAYUK
MAYUR CORPORATION
Pune Baner Project-Tower 4 and 5
Goel Ganga Ventures India Private Limited
Builder: SHARADA ALLIANCE PROMOTERS & BUILDERS
SHARADA ALLIANCE PROMOTERS & BUILDERS has 2 registrations on MahaRERA, including SHARADA PRIDE and Mokate Kalanidhi. Its filings disclose 11 earlier MahaRERA projects: declares 5 of 11 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Mokate Kalanidhi is delayed beyond 30 Apr 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Mokate Kalanidhi?
The registered promoter entity is SHARADA ALLIANCE PROMOTERS & BUILDERS, a partnership as per the filing. Its GSTIN 27ABYFS1367F1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Mokate Kalanidhi?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Mokate Kalanidhi?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Mokate Kalanidhi?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Mokate Kalanidhi?
The professionals named in the filing: Architect: Ankur Associates & Architects Kulkarni; Engineer: Sandip Naise; Chartered Accountant: P B SHAH; Chartered Accountant: Rushabh Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Mokate Kalanidhi?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback