Home / Browse projects / Thane, Maharashtra / Mohandeep
Mohandeep
By Magestic premises private limited
RG-MH-32112 · RERA PM1330002500575 · Last updated on MahaRERA portal: 27 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 12 months
- 1 extension taken
- Allotment letter deviates from the model form
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Mohandeep is a Mixed project by Magestic premises private limited in Thane, Maharashtra, registered with MahaRERA as PM1330002500575 on 14 Aug 2025. Possession is promised by 15 Jun 2028. The completion date has moved by 12 months from the original filing. 2 of the 33 units on this registration are recorded sold or booked, and 1 of 9 construction stages are filed complete.
At a glance
Project
- NameMohandeep
- TypeMixed
- Location
- VILLAGE PANCHPAKADI
- Thane (M Corp.)
- Thane
- 400602
- Pincode400602
- MapView location on Google Maps (as filed on RERA)
- RERA no.PM1330002500575
- ReraGenie IDRG-MH-32112
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Aug 2025
- Promised completion15 Jun 2028
- Revised completionRevised to 15 Jun 2028 (originally 15 Jun 2027)
- Buildings1 building record
- Documents filed21 files
Current status
Figures as on 27 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BLISS VIEW | NA | 15 | 14 | 22 | 11 | 33 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 9 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
BLISS VIEW: 11% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | No | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | 0% |
| Storm Water Drains | No | 0% |
| Landscaping & Tree Planting | No | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | 0% |
| Solid Waste Management And Disposal | No | 0% |
| Water conservation /Rain water harvesting | No | 0% |
| Energy managemcnt | No | 0% |
| Fire protection and fire safety requirements | No | 0% |
| Electrical meter room, sub-station, receiving station | No | 0% |
| Aggregate area of recreational Open Space | No | 0% |
| Open Parking | No | 0% |
Parking filed30
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Mohandeep Cooperarive Housing Society Ltd | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BLISS VIEW | NA | Rs 17.00 cr | Rs 1.46 cr |
| - | NA | Rs 1.50 cr | Rs 1.28 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Saakaar Architects |
| Engineer | ratan kharatmol |
| Engineer | Saurab Kadam |
| Engineer | Harsh Mehta |
| Chartered Accountant | kalpesh H Agarwal & Co |
| Chartered Accountant | Raj jain & Associates |
| Partner | Role in project |
|---|---|
| Magestic premises private limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportNot on the file
A lawyer's report on who owns the land and what is registered against it.
- Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 May 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 May 2025 - Commencement CertificateNot on the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
- Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 15 Jun 2028
Documents filed21
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A FY 25-26.pdf | 27 Apr 2026 |
| Withdrawal Update Form 1File: Architect Certifcate Mar 26.pdf | 18 Apr 2026 |
| Withdrawal Update Form 2File: Engineer Certificate form 2 Mar 26.pdf | 18 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 March 26.pdf | 18 Apr 2026 |
| Form 5 (FY 2025-2026)File: Form 5 Mohandeep FY 25-26.pdf | 18 Apr 2026 |
| Withdrawal Update Form 1File: Architect Certifcate Dec 5.pdf | 23 Jan 2026 |
| Withdrawal Update Form 1File: Architect Certifcate Dec 5.pdf | 23 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate form 2 Dec 25.pdf | 23 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate form 2 Dec 25.pdf | 23 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Dec 25.pdf | 23 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Dec 25.pdf | 23 Jan 2026 |
| Withdrawal Update Form 1File: Architect Certifcate Sep 25.pdf | 25 Oct 2025 |
| Withdrawal Update Form 1File: Architect Certifcate Sep 25.pdf | 25 Oct 2025 |
| Withdrawal Update Form 2File: Engineer Certificate form 2 Sep 25.pdf | 25 Oct 2025 |
| Withdrawal Update Form 2File: Engineer Certificate form 2 Sep 25.pdf | 25 Oct 2025 |
| Withdrawal Update Form 3File: MPPL- FORM 3 Revised.pdf | 25 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Sep 25.pdf | 25 Oct 2025 |
| Layout approvalFile: No Layout Plan.pdf | 19 May 2025 |
| Declaration and undertaking (Annexure A)File: Annexure A.pdf | 19 May 2025 |
| Building plan approval or NA orderFile: CC dated 090525.pdf | 19 May 2025 |
| Building plan approvalFile: MOHANDEEP SOCIETY - SANCTIONED PLAN.pdf | 14 May 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 21 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Mohandeep on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VILLAGE PANCHPAKADI7,600+ in Thane
Filed coordinates, straight-line distance. 380 registered projects within 2 km.
Stellar
Trimity Realty LLP
SAMRIN HERITAGE
SAMRIN INFRA PRIVATE LIMITED
L&T Realty Vayam Tower 3
ELANTE PROPERTIES PRIVATE LIMITED, J S K E
L&T Realty Vayam Tower 4
ELANTE PROPERTIES PRIVATE LIMITED, J S K E
Codename LIT Tower A
Camrose Realtors Private Limited
Codename LIT Tower B
Camrose Realtors Private Limited
See every Thane project, with the district possession charts
Builder: Magestic premises private limited
MAGESTIC PREMISES PRIVATE LIMITED has 2 registrations on MahaRERA, including OASIS ROYALE and Mohandeep. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Mohandeep is delayed beyond 15 Jun 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Mohandeep?
The registered promoter entity is Magestic premises private limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Mohandeep?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Mohandeep?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Mohandeep?
The professionals named in the filing: Architect: Saakaar Architects; Engineer: ratan kharatmol; Engineer: Saurab Kadam; Engineer: Harsh Mehta; Chartered Accountant: kalpesh H Agarwal & Co; Chartered Accountant: Raj jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Mohandeep?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback