Mohan Tribeca

By MOHAN LIFESPACES LLP

RG-MH-30558 · RERA P51700031172 · Last updated on MahaRERA portal: 1 Oct 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 23 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
17 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 80%
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

Mohan Tribeca is a Commercial project by MOHAN LIFESPACES LLP in Thane, Maharashtra, registered with MahaRERA as P51700031172 on 11 Oct 2021. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameMohan Tribeca
  • TypeCommercial
  • Location
    • Vasant Valley Road
    • Khadakpada
    • Gandhare
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700031172
  • ReraGenie IDRG-MH-30558

Builder

  • NameMOHAN LIFESPACES LLP
  • Entity typePartnership
  • GSTIN27AASFM8768R1ZS
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersMAMTA AMAR BHATIA, DEEPAK GOBIND MANCHANDYA, DHIRAJ HARI BHATIA, GEETU JEETENDER LALCHANDANI, KUMAR GOBINDRAM VIDHANI, LAKHI RAVI SHRINGI, MANISH PARSRAM BAHRANI, RAJESH CHANDIRAM KISHINSINGHANI, SUNIL MOHANDAS HARCHANDANI, AJIT RAMESHLAL GANDHI, HITESH NARI RAMCHANDANI, CHIRAG MANOHAR MANCHANDYA
  • Other registrations23 more →
  • Completed17 of 24
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects22 →

Key dates

this monthRegisteredOct 2021PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Oct 2021
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed63 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA120000
Wing BNA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 1 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 80%.

Wing A80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Wing B89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities16

As on 1 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
ParkingYes0%

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
Wing A11
Wing B11

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,239 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Rajesh GuptaGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Bachuram KarbhariKalyanThane

Approvals and building plan

Sanctioning authorityKalyan Dombivli Municipal Corporation
Permissible FSI5239.3
Proposed, not sanctioned4,239 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKalyan

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDe-Con Consultants
EngineerVinayak Chopdekar & Associates
Chartered AccountantKV BHAT
Chartered AccountantROOP RAJANI
PartnerRole in project
MOHAN LIFESPACES LLP-

Litigation declared2

CaseCourtStatus
2165/2021Bombay High CourtPre admission
46/2015Kalyan Senior DivisionDismissed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Oct 2024

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2021-2022)File: Form 5.pdf1 Oct 2025
Form 5 (FY 2022-2023)File: Form 5.pdf1 Oct 2025
Form 5 (FY 2023-2024)File: Form 5.pdf1 Oct 2025
Form 5 (FY 2024-2025)File: Mohan Tribecca.pdf30 Sep 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Tribeca.pdf10 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Tribeca.pdf10 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Tribeca.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_Mohan Tribeca.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_Mohan Tribeca.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3- Mohan Tribeca signed.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_Mohan Tribeca.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_Mohan Tribeca.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3- Mohan Tribeca signed.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_Mohan Tribeca.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3- Mohan Tribeca signed.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_Mohan Tribeca.pdf23 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Clarification Letter-Mohan Tribeca-.pdf28 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Triebca OC.pdf21 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Triebca OC.pdf21 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf21 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Triebca OC.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Mohan Tribeca.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Mohan Tribeca.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Mohan Tribeca.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Tribeca.pdf4 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Tribeca.pdf4 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA Cert- Tribeca.pdf4 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Tribecca.pdf4 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Accepted.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate-Tribeca.pdf26 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate-Tribeca.pdf26 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Tribecca.pdf15 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert- Tribecca.pdf15 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Tribecca.pdf15 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Mohan Tribeca.pdf30 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QA Cert Tribecca ( March 22 ).pdf14 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QA Cert Tribecca ( March 23 ).pdf14 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Tribecca.pdf18 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Tribecca.pdf18 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf18 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Tribeca.pdf3 Nov 2022
Building plan approvalFile: Revised Building Plan.pdf18 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: Revised Building Plan.pdf18 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf18 Jun 2022
Copy of the legal title reportFile: Title.pdf5 Oct 2021
Copy of the legal title reportFile: 7-12a.pdf5 Oct 2021
Copy of the legal title reportFile: 7-12b_opt.pdf5 Oct 2021
Copy of the legal title reportFile: 7-12c.pdf5 Oct 2021
Proforma of Allotment letterFile: Allotment letter_Mohan Tribeca.pdf5 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf29 Sep 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf29 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf29 Sep 2021
Proforma of Allotment letterFile: Mohan_Tribeca_Sale Agreement_Final Agreement.pdf29 Sep 2021
Layout approvalFile: Layout Plan_opt.pdf28 Sep 2021
Building plan approvalFile: Mohan Tribeca.pdf28 Sep 2021
Copy of Layout Approval (in case of layout)File: Layout Plan_opt.pdf28 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Mohan Tribeca.pdf28 Sep 2021
Declaration about Commencement CertificateFile: Commencement Declaration.pdf28 Sep 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold Disclosure.pdf28 Sep 2021
PAN CardFile: PAN.pdf25 Aug 2021
Details of encumbrancesFile: Ecumbrances Declaration.pdf25 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: Mohan Altezza_Commencement Certificate.pdf25 Aug 2021
Declaration in FORM BFile: from B_Mohan.pdf25 Aug 2021

Promoter's earlier projects22

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

21 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Mohan SkyvilleP51700003607Khadakpada, Thane10Aug 2017CompletedJun 2023Registered original: Jun 2019Late, Apr 2024
Mohan GreenwoodsBadlapur627-CompletedApr 2017Apr 2017
Mohan GalleriaAmbernath49-CompletedMar 2017Mar 2017
Mohan HighlandsBadlapur541-CompletedJan 2017Jan 2017
Mohan Suburbia SchoolAmbernath1-CompletedDec 2016Dec 2016
Mohan Suburbia Salisbury Phase IIAmbernath626-CompletedDec 2016Dec 2016
Mohan Palms IIIBadlapur619-CompletedDec 2016Dec 2016
Mohan Suburbia Oxford Phase IAmbernath617-CompletedDec 2014Dec 2014
Mohan Plaza IIWayle Nagar khadakpada Kalyan West24-CompletedDec 2013Dec 2013
Mohan Palms I/IIBadlapur766-CompletedDec 2013Dec 2013
Mohan ValleyGaneshwadi Badlapur West425-CompletedDec 2011Dec 2011
Mohan SrishtiKachore Patri Pull Kalyan East300-CompletedDec 2010Dec 2010
Mohan PrideWayle Nagar khadakpada Kalyan West440-CompletedDec 2009Dec 2009
Mohan PlazaWayle Nagar khadakpada Kalyan West60-CompletedDec 2009Dec 2009
Mohan HeightsBhiwandi Murbad Road Khadakpada Kalyan West270-CompletedDec 2007Dec 2007
Mohan ParadiseWayle Nagar khadakpada Kalyan West250-CompletedDec 2006Dec 2006
Mohan JyotShiv Mandir Road Ambernath East125-CompletedDec 2006Dec 2006
Mohan PuramNear Dr. Gautam Jatale Hospital Kansai Section Ambernath East450-CompletedDec 2005Dec 2005
Mohan RegencyAdarwadi Kalyan West450-CompletedDec 2003Dec 2003
Mohan ParkGodrej Hills Road Khadakpada Kalyan West330-CompletedDec 2002Dec 2002
Mohan GardenRameshwadi Badlapur Gaon Road Badlapur West150-CompletedDec 2002Dec 2002
Manav ParkRameshwadi Badlapur Gaon Road Badlapur West465-CompletedDec 2000Dec 2000

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mohan Tribeca on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Khadakpada7,600+ in Thane

2 kmMohan TribecaCompleted 75Lapsed / revoked 42Other 117Dot size: filed unitsN

Filed coordinates, straight-line distance. 234 registered projects within 2 km.

Builder: MOHAN LIFESPACES LLP

MOHAN LIFESPACES LLP has 24 registrations on MahaRERA, including Mohan Areca and Mohan Suburbia IV. Its filings disclose 22 earlier MahaRERA projects: declares 21 of 22 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Mohan Tribeca is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mohan Tribeca?

The registered promoter entity is MOHAN LIFESPACES LLP, a partnership as per the filing. Its GSTIN 27AASFM8768R1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mohan Tribeca?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mohan Tribeca?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mohan Tribeca?

The professionals named in the filing: Architect: De-Con Consultants; Engineer: Vinayak Chopdekar & Associates; Chartered Accountant: KV BHAT; Chartered Accountant: ROOP RAJANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mohan Tribeca?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mohan Tribeca. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mohan Tribeca to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.