Completed No litigation declared Residential / Group Housing project

Mohan Suburbia IIB

By MOHAN LIFESPACES LLP

RG-MH-33983 · RERA P51700010658 · Last updated on MahaRERA portal: 20 Jan 2020

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2019Possession promisedregistration recorded completed
100 of 110Construction stages doneacross 10 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 26 documents Report an error

Mohan Suburbia IIB is a Residential / Group Housing project by MOHAN LIFESPACES LLP in Thane, Maharashtra, registered with MahaRERA as P51700010658 on 31 Aug 2017. The registration is recorded completed; possession was promised by 31 Mar 2019. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMohan Suburbia IIB
  • TypeResidential / Group Housing
  • Location
    • Ambernath
    • Ambarnath(M Cl)
    • Ambarnath
    • Thane
    • 421501
  • Pincode421501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700010658
  • ReraGenie IDRG-MH-33983

Builder

  • NameMOHAN LIFESPACES LLP
  • Entity typePartnership
  • GSTIN27AASFM8768R1ZS
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersMAMTA AMAR BHATIA, DEEPAK GOBIND MANCHANDYA, DHIRAJ HARI BHATIA, GEETU JEETENDER LALCHANDANI, KUMAR GOBINDRAM VIDHANI, LAKHI RAVI SHRINGI, MANISH PARSRAM BAHRANI, RAJESH CHANDIRAM KISHINSINGHANI, SUNIL MOHANDAS HARCHANDANI, AJIT RAMESHLAL GANDHI, HITESH NARI RAMCHANDANI, CHIRAG MANOHAR MANCHANDYA
  • Other registrations23 more →
  • Completed17 of 24
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects22 →

Key dates

this monthRegisteredAug 2017First promiseMar 2018Revised toMar 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Aug 2017
  • Promised completion31 Mar 2019
  • Revised completionRevised to 31 Mar 2019 (originally 31 Mar 2018)
  • Buildings10 building records
  • Documents filed26 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
K2 WingNA90000
L2 WingNA90000
M2 WingNA90000
N2 WingNA90000
O2 WingNA90000
P2 WingNA100000
Q2 WingNA100000
R2 WingNA100000
S2 WingNA100000
T2 WingNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building10

As on 20 Jan 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

100 of 110 construction stages are filed complete across 10 buildings. The stage furthest along is Podiums (if any), at 0%.

K2 Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
L2 Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
M2 Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
N2 Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
O2 Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
P2 Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Q2 Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
R2 Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
S2 Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
T2 Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities44

As on 20 Jan 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
GazeboYes100%
Table TennisYes100%
Landscape GardenYes100%
Net CaféYes100%
Acupressure TrackYes100%
Mini TheaterYes100%
Badminton CourtYes100%
Squash CourtYes100%
Children’s Play AreaYes100%
Tennis CourtYes100%
Music RoomYes100%
Solar PowerYes100%
Aerobics / Meditation RoomYes100%
AC LibraryYes100%
Swimming PoolYes100%
GymnasiumYes100%
Indoor GamesYes100%
Cricket PitchYes100%
Jacuzzi, Steam & SaunaYes100%
Banquet HallYes100%
Jogging TrackYes100%
Club HouseYes100%
MultiCuisine CafeYes100%
AmphitheatreYes100%
Painting RoomYes100%
Basketball CourtYes100%
Skating RingYes100%
Creche RoomYes100%
Bus facilityYes100%

Parking filed108

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots108
Closed/Covered108
BuildingClosed/CoveredTotal
K2 Wing1010
L2 Wing1010
M2 Wing1010
N2 Wing1919
O2 Wing1414
P2 Wing99
Q2 Wing99
R2 Wing99
S2 Wing99
T2 Wing99

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,918 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI12241.75
Proposed, not sanctioned12,242 sq m
Buildings approved10
Buildings sanctioned10

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUlhasnagar

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectThorat & Mathew Associates
EngineerVinayak Chopdekar & Associates
PartnerRole in project
MOHAN LIFESPACES LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700000760Mar 2018 → Mar 2019

Reason as filed by the promoterWe have applied for Completion Certificate vide letter dated 04/04/2016 with Ambernath Municipal Council for our project Mohan Suburbia Phase IIB comprising of Building No K2 to T2 but due to certain technical difficulties Ambernath Municipal Council has not yet issued the same. We have annexed copy of Inward application for completion certificate dated 04/04/2016 and our Architect's Letter dated 09/04/2018 in Form 4 as prescribed under RERA rules. We have already submitted letter dated 09/04/2018 in Form 4 in the month of April 2018 with your learned authority. We are continuously following u

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000055450Surendra PrasadMohan Lifespaces LLP01/08/2018

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Jan 2020

Documents filed26

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 4)File: Mohan Suburbia Completion 1.pdf20 Jan 2020
Certificates of Architect (Form 4)File: Mohan Suburbia Completion 2.pdf20 Jan 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf18 Jan 2020
Certificates of CA (Form 5)File: Suburbia IIB.pdf30 Sep 2019
Certificates of CA (Form 5)File: Suburbia IIB.pdf23 Oct 2018
Certificates of Architect (Form 4)File: Form 4-1.pdf11 Apr 2018
Certificates of Architect (Form 4)File: Form 4-2.pdf11 Apr 2018
Building plan approvalFile: Type II opt.pdf30 Jul 2017
Building plan approvalFile: Type IV.pdf30 Jul 2017
Building plan approvalFile: Type X.pdf30 Jul 2017
Building plan approvalFile: Type XV.pdf30 Jul 2017
Layout approvalFile: Mohan Suburbia II_opt.pdf30 Jul 2017
PAN CardFile: PAN.pdf30 Jul 2017
Copy of the legal title reportFile: TitleCertificate2807.pdf30 Jul 2017
Details of encumbrancesFile: INDEX II SUBURBIA.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: Mohan Suburbia II_opt.pdf30 Jul 2017
Building Plan Approval (IOD)File: Type II opt.pdf30 Jul 2017
Building Plan Approval (IOD)File: Type IV.pdf30 Jul 2017
Building Plan Approval (IOD)File: Type X.pdf30 Jul 2017
Building Plan Approval (IOD)File: Type XV.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC 020715 Attested.pdf30 Jul 2017
Declaration in FORM BFile: Suburbia IIB Form B.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_opt.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form2_opt.pdf30 Jul 2017
Certificates of CA (Form 3)File: Form 3.pdf30 Jul 2017
Proforma of Allotment letterFile: Allotment and Sale Agreement.pdf30 Jul 2017

Promoter's earlier projects22

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

21 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Mohan SkyvilleP51700003607Khadakpada, Thane10Aug 2017CompletedJun 2023Registered original: Jun 2019Late, Apr 2024
Mohan GreenwoodsBadlapur627-CompletedApr 2017Apr 2017
Mohan GalleriaAmbernath49-CompletedMar 2017Mar 2017
Mohan HighlandsBadlapur541-CompletedJan 2017Jan 2017
Mohan Suburbia SchoolAmbernath1-CompletedDec 2016Dec 2016
Mohan Suburbia Salisbury Phase IIAmbernath626-CompletedDec 2016Dec 2016
Mohan Palms IIIBadlapur619-CompletedDec 2016Dec 2016
Mohan Suburbia Oxford Phase IAmbernath617-CompletedDec 2014Dec 2014
Mohan Plaza IIWayle Nagar khadakpada Kalyan West24-CompletedDec 2013Dec 2013
Mohan Palms I/IIBadlapur766-CompletedDec 2013Dec 2013
Mohan ValleyGaneshwadi Badlapur West425-CompletedDec 2011Dec 2011
Mohan SrishtiKachore Patri Pull Kalyan East300-CompletedDec 2010Dec 2010
Mohan PrideWayle Nagar khadakpada Kalyan West440-CompletedDec 2009Dec 2009
Mohan PlazaWayle Nagar khadakpada Kalyan West60-CompletedDec 2009Dec 2009
Mohan HeightsBhiwandi Murbad Road Khadakpada Kalyan West270-CompletedDec 2007Dec 2007
Mohan ParadiseWayle Nagar khadakpada Kalyan West250-CompletedDec 2006Dec 2006
Mohan JyotShiv Mandir Road Ambernath East125-CompletedDec 2006Dec 2006
Mohan PuramNear Dr. Gautam Jatale Hospital Kansai Section Ambernath East450-CompletedDec 2005Dec 2005
Mohan RegencyAdarwadi Kalyan West450-CompletedDec 2003Dec 2003
Mohan ParkGodrej Hills Road Khadakpada Kalyan West330-CompletedDec 2002Dec 2002
Mohan GardenRameshwadi Badlapur Gaon Road Badlapur West150-CompletedDec 2002Dec 2002
Manav ParkRameshwadi Badlapur Gaon Road Badlapur West465-CompletedDec 2000Dec 2000

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mohan Suburbia IIB on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ambernath7,600+ in Thane

2 kmMohan Suburbia IIBCompleted 35Lapsed / revoked 12Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 77 registered projects within 2 km.

Builder: MOHAN LIFESPACES LLP

MOHAN LIFESPACES LLP has 24 registrations on MahaRERA, including Mohan Areca and Mohan Suburbia IV. Its filings disclose 22 earlier MahaRERA projects: declares 21 of 22 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Mohan Suburbia IIB is delayed beyond 31 Mar 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mohan Suburbia IIB?

The registered promoter entity is MOHAN LIFESPACES LLP, a partnership as per the filing. Its GSTIN 27AASFM8768R1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mohan Suburbia IIB?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Mohan Suburbia IIB?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Mohan Suburbia IIB?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mohan Suburbia IIB?

The professionals named in the filing: Architect: Thorat & Mathew Associates; Engineer: Vinayak Chopdekar & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mohan Suburbia IIB?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mohan Suburbia IIB. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mohan Suburbia IIB to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.