Red flags
- Possession 1 months past the filed date
- Completion date moved by 9 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Mohan Residency is a Others project by Abhijeet C Dayma in Nashik, Maharashtra, registered with MahaRERA as P51600052380 on 21 Aug 2023. Possession was promised by 14 Sep 2026 and is now 1 months past that date. The completion date has moved by 9 months from the original filing. 28 of the 68 units on this registration are recorded sold or booked, and 9 of 9 construction stages are filed complete.
At a glance
Project
- NameMohan Residency
- TypeOthers
- Location
- Artillery Center Road
- New Mhasoba Mandir
- Nashik
- Deolali (CB)
- Nashik
- 422101
- Pincode422101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600052380
- ReraGenie IDRG-MH-58591
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on21 Aug 2023
- Promised completion14 Sep 2026
- Revised completionRevised to 14 Sep 2026 (originally 31 Dec 2025)
- Buildings1 building record
- Documents filed82 files
Current status
Figures as on 19 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Mohan Residency | NA | 5 | 5 | 60 | 8 | 68 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 19 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 9 construction stages are filed complete.
Mohan Residency: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 19 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed228
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership4
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Bhikchand Kevalchand Dhadiwal | Nashik Road | Nashik |
| Asha Mohanlal Dhadiwal | Nashik (M Corp.) | Nashik |
| Punamkumar Mohanlal Dhadiwal | Nashik Road | Nashik |
| Bhupesh Mohanlal Dhadiwal | Nashik Road | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Mohan Residency | NA | Rs 7.50 cr | Rs 7.50 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar Jaywant Pawar |
| Engineer | Er Milind Rathi |
| Engineer | Abhijeet C Dayma |
| Chartered Accountant | CA Vipul V. Bhandari |
| Chartered Accountant | RSPH & Associates |
| Chartered Accountant | Prakash N Sabadra |
| Chartered Accountant | Pratik D Jain |
| Partner | Role in project |
|---|---|
| Dayma Builders and Developers | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1. I have obtained full occupancy certificate from Nashik Municipal Corporation dated 19/01/2026. 2. I have to apply for Application for Correction and then need to go for Completion Update. Therefore, we are applying for Extension in Project Completion date till 14/09/2026. 3. The photos of present status of project are enclosed herewith.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Jun 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Jun 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed82
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Building plan approvalFile: Plan 1-Mohan Residency.pdf | 19 Jun 2026 |
| Building plan approvalFile: Plan 2-Mohan Residency.pdf | 19 Jun 2026 |
| Form 2A (FY 2023-2024)File: Form 2A- March 2024.pdf | 19 Jun 2026 |
| Form 2A (FY 2025-2026)File: Form 2A March 26 - Mohan residency.pdf | 19 Jun 2026 |
| Withdrawal Update Form 1File: AR.pdf | 15 Jun 2026 |
| Withdrawal Update Form 2File: ER.pdf | 15 Jun 2026 |
| Withdrawal Update Form 3File: CA.pdf | 15 Jun 2026 |
| Withdrawal Update Form 1File: AR - Mohan Dec 25 .pdf | 25 Feb 2026 |
| Withdrawal Update Form 2File: ER Dec 25.pdf | 25 Feb 2026 |
| Withdrawal Update Form 3File: CA Dec 25 .pdf | 25 Feb 2026 |
| Withdrawal Update Form 1File: AR.pdf | 5 Jan 2026 |
| Withdrawal Update Form 2File: ER .pdf | 5 Jan 2026 |
| Withdrawal Update Form 3File: CA final.pdf | 5 Jan 2026 |
| Form 2A (FY 2024-2025)File: Form 2- March 25 - Mohan residency - .pdf | 3 Jan 2026 |
| Form 5 (FY 2024-2025)File: RERA audit report -Mohan residency final.pdf | 29 Dec 2025 |
| Form 1File: AR - june 25.pdf | 19 Sep 2025 |
| Form 2File: ER june 25.pdf | 19 Sep 2025 |
| Form 3File: CA june 25.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Dislosure - Mohan residency - june 25.pdf | 19 Sep 2025 |
| Form 1File: Mohan - AR June 24_compressed.pdf | 1 Aug 2025 |
| Form 2File: Mohan - ER June 24_compressed.pdf | 1 Aug 2025 |
| Form 3File: CA june 24.pdf | 1 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - June 24_compressed.pdf | 1 Aug 2025 |
| Form 1File: Mohan - AR Sep 24_compressed.pdf | 1 Aug 2025 |
| Form 2File: Mohan - ER Sep 24_compressed.pdf | 1 Aug 2025 |
| Form 3File: CA sept 24.pdf | 1 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - Sep 24_compressed.pdf | 1 Aug 2025 |
| Form 1File: Mohan - AR Dec 24_compressed.pdf | 1 Aug 2025 |
| Form 2File: Mohan - ER -Dec 24_compressed.pdf | 1 Aug 2025 |
| Form 3File: CA Dec 24 (1)_compressed.pdf | 1 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - Dec 24_compressed.pdf | 1 Aug 2025 |
| Form 1File: Mohan - AR March 25_compressed.pdf | 1 Aug 2025 |
| Form 2File: Mohan - ER March 25_compressed.pdf | 1 Aug 2025 |
| Form 3File: CA march 25.pdf | 1 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 25_compressed.pdf | 1 Aug 2025 |
| Form 1File: 1-Architect Certificate- Sept 23_compressed.pdf | 1 Aug 2025 |
| Form 2File: 1-Engineer Certificate-Sept-23_compressed.pdf | 1 Aug 2025 |
| Form 3File: 1-CA Certificate-Sept-23.pdf | 1 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Mohan Dis - sep 23_compressed.pdf | 1 Aug 2025 |
| Form 1File: 2-Architect Certificate- Dec- 23_compressed.pdf | 1 Aug 2025 |
| Form 2File: 2-Engineer Certificate-Dec-23_compressed.pdf | 1 Aug 2025 |
| Form 3File: 2-CA Certificate-Dec-23.pdf | 1 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Mohan Dis - Dec 23_compressed.pdf | 1 Aug 2025 |
| Form 5 (FY 2023-2024)File: RERA AUDIT REPORT - 2023-24 Final.pdf | 1 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1-Architect Certificate- Sept 23_compressed.pdf | 18 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2-Architect Certificate- Dec- 23_compressed.pdf | 18 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3-Architect Certificate- March- 24_compressed.pdf | 18 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1-Engineer Certificate-Sept-23_compressed.pdf | 18 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2-Engineer Certificate-Dec-23_compressed.pdf | 18 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3- Engineer Certificate-March-24_compressed.pdf | 18 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1-CA Certificate-Sept-23.pdf | 18 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2-CA Certificate-Dec-23.pdf | 18 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3-CA Certificate-March-24.pdf | 18 May 2024 |
| Copy of the legal title reportFile: Title Report_1 (3 files merged).pdf | 5 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Copy of CA Certificate with UDIN_1 (8 files merged).pdf | 5 Jul 2023 |
| Layout approvalFile: Building Plan 01.pdf | 20 Jun 2023 |
| Layout approvalFile: Building Plan 02.pdf | 20 Jun 2023 |
| Layout approvalFile: Building Plan 03.pdf | 20 Jun 2023 |
| Building plan approvalFile: Building Plan 01.pdf | 20 Jun 2023 |
| Building plan approvalFile: Building Plan 02.pdf | 20 Jun 2023 |
| Building plan approvalFile: Building Plan 03.pdf | 20 Jun 2023 |
| PAN CardFile: Abhijeet PAN.pdf | 20 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: EC - Finance.pdf | 20 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: EC - Legal.pdf | 20 Jun 2023 |
| Details of encumbrances concerned to LegalFile: EC - Finance.pdf | 20 Jun 2023 |
| Details of encumbrances concerned to LegalFile: EC - Legal.pdf | 20 Jun 2023 |
| Copy of Layout Approval (in case of layout)File: Building Plan 01.pdf | 20 Jun 2023 |
| Copy of Layout Approval (in case of layout)File: Building Plan 02.pdf | 20 Jun 2023 |
| Copy of Layout Approval (in case of layout)File: Building Plan 03.pdf | 20 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 01.pdf | 20 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 02.pdf | 20 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 03.pdf | 20 Jun 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 20 Jun 2023 |
| Declaration about Commencement CertificateFile: Form D.pdf | 20 Jun 2023 |
| Declaration in FORM BFile: Form B of Developers.pdf | 20 Jun 2023 |
| CERSAI detailsFile: CERSAI details.pdf | 20 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Other Real Estate.pdf | 20 Jun 2023 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 20 Jun 2023 |
| Proforma of Agreement for saleFile: Rera AOS Draft Mohan Residency.pdf | 20 Jun 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank.pdf | 20 Jun 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Shailaja HeightsP51600048806 | Adke Nagar 2, Nashik | 24 | Jan 2023 | Ongoing | Dec 2024 | Not delivered |
| Siddhivinayak ApartmentP51600033523 | Deolali Shiwar, Nashik, Nashik | - | Feb 2022 | Ongoing | Dec 2023 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 82 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Mohan Residency on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near New Mhasoba Mandir, Nashik4,100+ in Nashik
Filed coordinates, straight-line distance. 68 registered projects within 2 km.
The Exchange
Viraj Estates Pvt. Ltd. & Others
HARI SANSKRUTI PHASE II
KBC GLOBAL LIMITED
ARRPAN HOUSING
A C JAIN BUILDERS AND DEVELOPERS LLP
Shilpa Madhuvan
Shilpa Estate
STAR PLUS B
DEEPAK KALYANJI CHANDE
SKY ONE
OM SAI OM BUILDERS
See every Nashik project, with the district possession charts
Builder: Abhijeet C Dayma
Abhijeet C Dayma has 3 registrations on MahaRERA, including Siddhivinayak Apartment and Shailaja Heights. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if Mohan Residency is delayed beyond 14 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Mohan Residency?
The registered promoter entity is Abhijeet C Dayma, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Mohan Residency?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Mohan Residency?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Mohan Residency?
The professionals named in the filing: Architect: Ar Jaywant Pawar; Engineer: Er Milind Rathi; Engineer: Abhijeet C Dayma; Chartered Accountant: CA Vipul V. Bhandari; Chartered Accountant: RSPH & Associates; Chartered Accountant: Prakash N Sabadra. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Mohan Residency?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback