Home / Browse projects / Thane, Maharashtra / Mohan Altezza III
Mohan Altezza III
RG-MH-05235 · RERA P51700050807 · Last updated on MahaRERA portal: 14 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 2 cases
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Mohan Altezza III is a Residential / Group Housing project by MOHAN LIFESPACES LLP in Thane, Maharashtra, registered with MahaRERA as P51700050807 on 3 May 2023. Possession is promised by 31 Dec 2027. 110 of the 180 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameMohan Altezza III
- TypeResidential / Group Housing
- Location
- Wayle Nagar
- Khadakpada
- Gandhare
- Kalyan
- Thane
- 421301
- Pincode421301
- RERA no.P51700050807
- ReraGenie IDRG-MH-05235
Builder
- NameMOHAN LIFESPACES LLP
- Entity typePartnership
- GSTIN27AASFM8768R1ZS
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersMAMTA AMAR BHATIA, DEEPAK GOBIND MANCHANDYA, DHIRAJ HARI BHATIA, GEETU JEETENDER LALCHANDANI, KUMAR GOBINDRAM VIDHANI, LAKHI RAVI SHRINGI, MANISH PARSRAM BAHRANI, RAJESH CHANDIRAM KISHINSINGHANI, SUNIL MOHANDAS HARCHANDANI, AJIT RAMESHLAL GANDHI, HITESH NARI RAMCHANDANI, CHIRAG MANOHAR MANCHANDYA
- Other registrations23 more →
- Completed17 of 24
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects22 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 May 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed140 files
Current status
Figures as on 14 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing D | NA | 37 | 33 | 180 | 0 | 180 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 85%.
Wing D: 66% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Progress on shared amenities15
As on 14 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 95% |
| Street Lighting | Yes | 95% |
| Community Buildings | Yes | 95% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 25% |
| Electrical meter room, sub-station, receiving station | Yes | 25% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed2
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership9
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Rajesh Gupta | Mumbai City | Mumbai City |
| Ramaben Savaliya | Gandhare | Thane |
| Kiranben Talaviya | Gandhare | Thane |
| Vimalbhai Savaliya | Gandhare | Thane |
| Vinubhai Talaviya | Gandhare | Thane |
| Bhanubhai Talaviya | Gandhare | Thane |
| Ramji Savaliya | Gandhare | Thane |
| Arvind Kapote | Gandhare | Thane |
| Bachhuram Karbari | Gandhare | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing D | NA | Rs 85.00 cr | Rs 80.00 cr |
| - | NA | Rs 10.00 cr | Rs 9.50 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Decon Consultants |
| Engineer | Vinayak Chopdekar & Associates |
| Engineer | Rajesh Hiwale |
| Chartered Accountant | CA Vijay Sahita |
| Chartered Accountant | R. A. Rajani & Co |
| Partner | Role in project |
|---|---|
| MOHAN LIFESPACES LLP | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 2165/2021 | Bombay High Court | Ongoing |
| 2165/2021 | Bombay High Court | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Mar 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Mar 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Mar 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed140
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 140 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 MOHAN ALTEZZA III.pdf | 14 May 2026 |
| Withdrawal Update Form 2File: FORM 2 MOHAN ALTEZZA III.pdf | 14 May 2026 |
| Withdrawal Update Form 3File: FORM 3 MOHAN ALTEZZA III.pdf | 14 May 2026 |
| Withdrawal Update Form 1File: Form 1 Altezza III Q3 25-26.pdf | 4 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 Altezza III Q3 25-26.pdf | 4 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Altezza III Q3 25-26.pdf | 4 Feb 2026 |
| Withdrawal Update Form 1File: Form-1_ Mohan Altezza III.pdf | 25 Oct 2025 |
| Withdrawal Update Form 1File: Form-1_ Mohan Altezza III.pdf | 25 Oct 2025 |
| Withdrawal Update Form 2File: Form-2 _ Mohan Altezza III.pdf | 25 Oct 2025 |
| Withdrawal Update Form 2File: Form-2 _ Mohan Altezza III.pdf | 25 Oct 2025 |
| Withdrawal Update Form 3File: Signed Form 3 Altezza III.pdf | 25 Oct 2025 |
| Withdrawal Update Form 3File: Signed Form 3 Altezza III.pdf | 25 Oct 2025 |
| Form 5 (FY 2023-2024)File: Form 5.pdf | 1 Oct 2025 |
| Form 5 (FY 2024-2025)File: Mohan Altezza III.pdf | 30 Sep 2025 |
| Form 1File: Form 1.pdf | 14 Jul 2025 |
| Form 2File: Form 2.pdf | 14 Jul 2025 |
| Form 3File: Form 3.pdf | 14 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Inv Disclosure.pdf | 14 Jul 2025 |
| Form 1File: Form 1.pdf | 14 Jul 2025 |
| Form 2File: Form 2.pdf | 14 Jul 2025 |
| Form 3File: Form 3.pdf | 14 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Inv Disclosure.pdf | 14 Jul 2025 |
| Form 1File: Form 1.pdf | 14 Jul 2025 |
| Form 2File: Form 2.pdf | 14 Jul 2025 |
| Form 3File: Form 3.pdf | 14 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory disc.pdf | 14 Jul 2025 |
| Form 1File: Form 1.pdf | 14 Jul 2025 |
| Form 2File: Form 2.pdf | 14 Jul 2025 |
| Form 3File: Form 3.pdf | 14 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Inv Disclosure.pdf | 14 Jul 2025 |
| Form 1File: Form 1.pdf | 14 Jul 2025 |
| Form 2File: Form 2.pdf | 14 Jul 2025 |
| Form 3File: Form 3.pdf | 14 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Inv Disclosure.pdf | 14 Jul 2025 |
| Form 1File: Form-1_Mohan Altezza III.pdf | 14 Jul 2025 |
| Form 2File: Form-2_Mohan Altezza III.pdf | 14 Jul 2025 |
| Form 3File: Signed Form 3.pdf | 14 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Inv Disclosure.pdf | 14 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Altezza III.pdf | 12 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Altezza III.pdf | 12 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Altezza III.pdf | 12 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Altezza III Final for Uploading.pdf | 10 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Altezza III Final for Uploading.pdf | 10 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Altezza III Final for Uploading.pdf | 10 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 For Uploading.pdf | 3 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 For Uploading.pdf | 3 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 For Uploading.pdf | 3 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Mohan Altezza III.pdf | 26 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Mohan Altezza III.pdf | 26 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Mohan Altezza III.pdf | 26 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mohan Altezza_III- Form-3.pdf | 23 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mohan Altezza_III- Form-3.pdf | 23 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mohan Altezza_III- Form-3.pdf | 23 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mohan Altezza_III- Form-1.pdf | 22 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mohan Altezza_III- Form-2.pdf | 22 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mohan Altezza_III- Form-1.pdf | 22 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mohan Altezza_III- Form-2.pdf | 22 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mohan Altezza_III- Form-1.pdf | 22 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mohan Altezza_III- Form-2.pdf | 22 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Mohan Altezza III.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Mohan Altezza III.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Mohan Altezza III.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Mohan Altezza III.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Artch Cert Altezza III.pdf | 4 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert altezza III.pdf | 4 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA Cert -Altezza III.pdf | 4 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Altezza III.pdf | 4 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Altezza III Accepted.pdf | 6 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Altezza III.pdf | 26 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-Altezza III.pdf | 26 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert-Altezza III.pdf | 15 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert-Altezza III.pdf | 15 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Altezza 3.pdf | 15 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Altezza III Form 3.pdf | 5 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Altezza III Form 1.pdf | 26 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Altezza III Form 2.pdf | 26 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Altezza III Form 3.pdf | 26 Aug 2023 |
| Other - LegalFile: 7.pdf | 18 Apr 2023 |
| Other - LegalFile: 8.pdf | 18 Apr 2023 |
| Other - LegalFile: 9.pdf | 18 Apr 2023 |
Promoter's earlier projects22
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Mohan SkyvilleP51700003607 | Khadakpada, Thane | 10 | Aug 2017 | Completed | Jun 2023Registered original: Jun 2019 | Late, Apr 2024 |
| Mohan Greenwoods | Badlapur | 627 | - | Completed | Apr 2017 | Apr 2017 |
| Mohan Galleria | Ambernath | 49 | - | Completed | Mar 2017 | Mar 2017 |
| Mohan Highlands | Badlapur | 541 | - | Completed | Jan 2017 | Jan 2017 |
| Mohan Suburbia School | Ambernath | 1 | - | Completed | Dec 2016 | Dec 2016 |
| Mohan Suburbia Salisbury Phase II | Ambernath | 626 | - | Completed | Dec 2016 | Dec 2016 |
| Mohan Palms III | Badlapur | 619 | - | Completed | Dec 2016 | Dec 2016 |
| Mohan Suburbia Oxford Phase I | Ambernath | 617 | - | Completed | Dec 2014 | Dec 2014 |
| Mohan Plaza II | Wayle Nagar khadakpada Kalyan West | 24 | - | Completed | Dec 2013 | Dec 2013 |
| Mohan Palms I/II | Badlapur | 766 | - | Completed | Dec 2013 | Dec 2013 |
| Mohan Valley | Ganeshwadi Badlapur West | 425 | - | Completed | Dec 2011 | Dec 2011 |
| Mohan Srishti | Kachore Patri Pull Kalyan East | 300 | - | Completed | Dec 2010 | Dec 2010 |
| Mohan Pride | Wayle Nagar khadakpada Kalyan West | 440 | - | Completed | Dec 2009 | Dec 2009 |
| Mohan Plaza | Wayle Nagar khadakpada Kalyan West | 60 | - | Completed | Dec 2009 | Dec 2009 |
| Mohan Heights | Bhiwandi Murbad Road Khadakpada Kalyan West | 270 | - | Completed | Dec 2007 | Dec 2007 |
| Mohan Paradise | Wayle Nagar khadakpada Kalyan West | 250 | - | Completed | Dec 2006 | Dec 2006 |
| Mohan Jyot | Shiv Mandir Road Ambernath East | 125 | - | Completed | Dec 2006 | Dec 2006 |
| Mohan Puram | Near Dr. Gautam Jatale Hospital Kansai Section Ambernath East | 450 | - | Completed | Dec 2005 | Dec 2005 |
| Mohan Regency | Adarwadi Kalyan West | 450 | - | Completed | Dec 2003 | Dec 2003 |
| Mohan Park | Godrej Hills Road Khadakpada Kalyan West | 330 | - | Completed | Dec 2002 | Dec 2002 |
| Mohan Garden | Rameshwadi Badlapur Gaon Road Badlapur West | 150 | - | Completed | Dec 2002 | Dec 2002 |
| Manav Park | Rameshwadi Badlapur Gaon Road Badlapur West | 465 | - | Completed | Dec 2000 | Dec 2000 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 23 other registrations, which the RERA portal never shows together
- All 140 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Mohan Altezza III on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Khadakpada7,600+ in Thane
PODDAR RIVIERA PHASE - I
Poddar Housing and Development Limited
Sinhagad by Bhagwati Haware - Wing - B
Bhagwati Haware Properties Supertech
Pratapgad by Bhagwati Haware - Wing - C
Bhagwati Haware Properties Supertech
Rajgad by Bhagwati Haware - Wing - D
Bhagwati Haware Properties Supertech
PODDAR RIVIERA PHASE - III
Poddar Housing and Development Limited
THARWANI PARKGLEN PHASE I
THARWANI REALTORS
See every Thane project, with the district possession charts
Builder: MOHAN LIFESPACES LLP
MOHAN LIFESPACES LLP has 24 registrations on MahaRERA, including Mohan Areca and Mohan Suburbia IV. Its filings disclose 22 earlier MahaRERA projects: declares 21 of 22 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Mohan Altezza III is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Mohan Altezza III?
The registered promoter entity is MOHAN LIFESPACES LLP, a partnership as per the filing. Its GSTIN 27AASFM8768R1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Mohan Altezza III?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Mohan Altezza III?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Mohan Altezza III?
The professionals named in the filing: Architect: Decon Consultants; Engineer: Vinayak Chopdekar & Associates; Engineer: Rajesh Hiwale; Chartered Accountant: CA Vijay Sahita; Chartered Accountant: R. A. Rajani & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Mohan Altezza III?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback