Home / Browse projects / Mumbai Suburban, Maharashtra / Modispaces Ganges

Completed No litigation declared Residential / Group Housing project

Modispaces Ganges

By Modispaces Real Estate Pvt Ltd

RG-MH-51658 · RERA P51800046473 · Last updated on MahaRERA portal: 15 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Internal walls, 95%
20 of 60Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

Modispaces Ganges is a Residential / Group Housing project by Modispaces Real Estate Pvt Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046473 on 4 Aug 2022. The registration is recorded completed; possession was promised by 30 Jun 2025. 40 of the 60 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameModispaces Ganges
  • TypeResidential / Group Housing
  • Location
    • Svp Road
    • Borivali West
    • Borivali
    • Mumbai Suburban
    • 400103
  • Pincode400103
  • RERA no.P51800046473
  • ReraGenie IDRG-MH-51658

Builder

  • NameModispaces Real Estate Pvt Ltd
  • Entity typeCompany
  • CINU45200MH2006PTC159318
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • ChairpersonGhanshyam Sagarmal Modi
  • DirectorsKeshav Sunilkumar Modi, Anand Premkumar Modi, Vinit Shyamsunder Modi
  • Other registrations8 more →
  • Completed7 of 9
  • Declared earlier projects8 →

Key dates

this monthRegisteredAug 2022PromisedJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Aug 2022
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed76 files

Current status

67%40 of 60 units booked
100.0%Work done, per cost certificate

Figures as on 15 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Modispaces GangesNA222160060

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

Modispaces Ganges: 85% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 15 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes60%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed102

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots102
Closed/Covered102

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,924 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Sep 2025
LandownerVillageDistrict
THE SBI EMPLOYEES MANDAPESHWAR CHSLBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI6232.98
Proposed, not sanctioned4,210 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNalanda Dance Research Center 10th Road JVPD Vile Parle West
Estimated costRs 2,438.00 cr
Cost incurredRs 2,438.00 cr
Work done100.0%
BuildingWingEstimatedIncurred
Modispaces GangesNARs 2,438.00 crRs 2,438.00 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectChogle & Associates
EngineerSura & Associates
Chartered AccountantSwaroop Jain & Co
Chartered AccountantAMAN A JAIN & ASSOCIATES
PartnerRole in project
Modispaces Real Estate Pvt Ltd-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Dec 2023 Ganges Form1.pdf15 Jun 2026
Withdrawal Update Form 2File: Engineer Form 2 Ganges(kalpataru) Mar25 - 18-11-2025 (1).pdf15 Jun 2026
Withdrawal Update Form 3File: Form 3 FINAL_Ganges.pdf15 Jun 2026
Occupational CertificateFile: 2459297_OC_signed.pdf15 Jun 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Ganges March 24.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Ganges Sept 24.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Ganges Dec 24.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Ganges_March 2024.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Ganges_june 2024.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Ganges_Sept 2024.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Ganges_Dec 2024.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 Ganges(kalpataru) March 2024- Signed.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 Ganges(kalpataru) Sept 2024 - 06-03-2025 (1) (1).pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Ganges Dec 24.pdf2 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 CA _Ganges April 23 -March 2024.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Ganges_Dec 2024 Revised.pdf21 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory_31-12-24.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Ganges Dec 24.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_angesDec24.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Ganges Dec 24.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: March 2023_ganges Form1.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: June 2023_Ganges Form1.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sept 2023 Ganges Form1.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 2023 Ganges Form1.pdf2 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory_30-06-23.pdf2 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory_30-09-23.pdf2 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory_31-12-23.pdf2 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Further CC(08-09-2023)_Ganges.pdf9 Sep 2023
Building plan approvalFile: KALPATARU AMENDED WRITE UP LETTER (28-08-2023)_Ganges.pdf30 Aug 2023
Layout approvalFile: Plan 1_Ganges.pdf30 Aug 2023
Layout approvalFile: Plan 2_Ganges-compressed.pdf30 Aug 2023
Layout approvalFile: Plan 3_Ganges-compressed.pdf30 Aug 2023
Layout approvalFile: Plan 4_Ganges.pdf30 Aug 2023
Layout approvalFile: Plan 5_Ganges.pdf30 Aug 2023
Layout approvalFile: Plan 6_Ganges.pdf30 Aug 2023
Layout approvalFile: Plan 7_Ganges.pdf30 Aug 2023
Copy of Layout Approval (in case of layout)File: Plan 1_Ganges.pdf30 Aug 2023
Copy of Layout Approval (in case of layout)File: Plan 2_Ganges-compressed.pdf30 Aug 2023
Copy of Layout Approval (in case of layout)File: Plan 3_Ganges-compressed.pdf30 Aug 2023
Copy of Layout Approval (in case of layout)File: Plan 4_Ganges.pdf30 Aug 2023
Copy of Layout Approval (in case of layout)File: Plan 5_Ganges.pdf30 Aug 2023
Copy of Layout Approval (in case of layout)File: Plan 6_Ganges.pdf30 Aug 2023
Copy of Layout Approval (in case of layout)File: Plan 7_Ganges.pdf30 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: KALPATARU AMENDED WRITE UP LETTER (28-08-2023)_Ganges.pdf30 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: Further CC (15-11-2022)_Ganges.pdf30 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Ganges.pdf8 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Ganges.pdf8 Feb 2023
Proforma of Allotment letterFile: Allotment Letter- RERA.pdf30 Aug 2022
Proforma of Allotment letterFile: Final Agr for Sale _RERA_Ganges.pdf30 Aug 2022
Deviation Report with respect to Allotment letterFile: Deviation report on Allotment Letter (17-08-22)_Ganges.pdf30 Aug 2022
Deviation Report with respect to model copy of AgreementFile: Deviation report on Agreement For Sale (30-08-22)_Ganges.pdf30 Aug 2022
Proforma of Allotment letterFile: Agreement for Sale _Modispaces Ganges.pdf28 Jul 2022
Proforma of Allotment letterFile: Allotment Letter _Modispaces Ganges.pdf28 Jul 2022
Deviation Report with respect to Allotment letterFile: Deviation report on Allotment letter _Modispaces Ganges.pdf28 Jul 2022
Deviation Report with respect to model copy of AgreementFile: Deviation report on Agreement for sale _Modispaces Ganges.pdf28 Jul 2022
Details of encumbrances concerned to FinanceFile: No Encumbrances_Ganges.pdf18 Jul 2022
Details of encumbrances concerned to LegalFile: No Encumbrances_Ganges.pdf18 Jul 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Rera Bank Account Details (18-07-22)_ Modispaces Ganges (1).pdf18 Jul 2022
Layout approvalFile: IOD Plans (29-12-2021)_Ganges_00001.pdf14 Jul 2022
Layout approvalFile: IOD Plans (29-12-2021)_Ganges_00002.pdf14 Jul 2022
Layout approvalFile: IOD Plans (29-12-2021)_Ganges_00003.pdf14 Jul 2022
Layout approvalFile: IOD Plans (29-12-2021)_Ganges_00004.pdf14 Jul 2022
Copy of Layout Approval (in case of layout)File: IOD Plans (29-12-2021)_Ganges_00001.pdf14 Jul 2022
Copy of Layout Approval (in case of layout)File: IOD Plans (29-12-2021)_Ganges_00002.pdf14 Jul 2022
Copy of Layout Approval (in case of layout)File: IOD Plans (29-12-2021)_Ganges_00003.pdf14 Jul 2022
Copy of Layout Approval (in case of layout)File: IOD Plans (29-12-2021)_Ganges_00004.pdf14 Jul 2022
Building plan approvalFile: IOD Remark (29-12-2021)_Ganges.pdf8 Jul 2022
PAN CardFile: PAN CARD _COMPANY _modispaces.pdf8 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD Remark (29-12-2021)_Ganges.pdf8 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: First CC (29-06-22)_Ganges.pdf8 Jul 2022
Declaration about Commencement CertificateFile: CC Declaration_Ganges.pdf8 Jul 2022
Declaration in FORM BFile: Form B (15-06-22)_Ganges.pdf8 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Ganges .pdf8 Jul 2022
CERSAI detailsFile: CERSAI_Ganges.pdf8 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FINAL_Ganges.pdf8 Jul 2022
Copy of the legal title reportFile: Title Report (20-5-22)_Ganges.pdf7 Jul 2022

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

7 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Modispaces AmazonShimpoli Road Borivali W Mumbai32CompletedDec 2019Nov 2018
Modispaces TashkentSVP Road Borivali W Mumbai79CompletedDec 2018Late, Jan 2019
Modispaces DoyleLourdes Colony Orlem Malad W Mumbai 40006420CompletedDec 2018Apr 2018
Modispaces OysterSai Baba Park Evershine Nagar Off Link Road Malad W Mumbai 40006416CompletedDec 2017Oct 2017
Modispaces IndusKastur Park Off Shimpoli Road Borivali W Mumbai27CompletedOct 2017Feb 2017
Modispaces MontrealSai Baba Park Evershine Nagar Off Link Road Malad W Mumbai 40006444CompletedJul 2016Sep 2015
Modispaces Pearly ShellJunction of Shankar Lane Kandivali W and Tank Lane Orlem Malad W Mumbai38CompletedJun 2016Apr 2016
Modispaces AnkurSai Baba Park Evershine Nagar Off Link Road Malad W Mumbai 40006436CompletedJul 2015Dec 2014

How this compares with Mumbai Suburban

67%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Modispaces Ganges on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali West6,700+ in Mumbai Suburban

Builder: Modispaces Real Estate Pvt Ltd

Modispaces Real Estate Pvt Ltd has 9 registrations on MahaRERA, including Modispaces Oyster and Modispaces Doyle. Its filings disclose 8 earlier MahaRERA projects: declares 7 of 8 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Modispaces Ganges is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Modispaces Ganges?

The registered promoter entity is Modispaces Real Estate Pvt Ltd, a company as per the filing. Its CIN U45200MH2006PTC159318 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Modispaces Ganges?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Modispaces Ganges?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Modispaces Ganges?

The professionals named in the filing: Architect: Chogle & Associates; Engineer: Sura & Associates; Chartered Accountant: Swaroop Jain & Co; Chartered Accountant: AMAN A JAIN & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Modispaces Ganges?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Modispaces Ganges. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Modispaces Ganges to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.