ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / MODIREALTY ACACIA

Registered No litigation declared Residential / Group Housing project

MODIREALTY ACACIA

By MODIREALTY DEVELOPERS PVT LTD

RG-MH-17772 · RERA P51800056150 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 90%
103 of 135Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

MODIREALTY ACACIA is a Residential / Group Housing project by MODIREALTY DEVELOPERS PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800056150 on 16 May 2024. Possession is promised by 31 Mar 2028. 32 of the 135 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameMODIREALTY ACACIA
  • TypeResidential / Group Housing
  • Location
    • Shailendra Nagar
    • Dahisar East
    • Dahisar
    • Borivali
    • Mumbai Suburban
    • 400068
  • Pincode400068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800056150
  • ReraGenie IDRG-MH-17772

Builder

  • NameMODIREALTY DEVELOPERS PVT LTD
  • Entity typeCompany
  • CINU70109MH2020PTC350147
  • GSTIN27AAOCM0584E1ZB
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsKESHAV Sunil MODI, GAUTAM Sunil MODI
  • Other registrations5 more →
  • Completed3 of 6
  • Declared earlier projects3 →

Key dates

this monthRegisteredMay 2024PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 May 2024
  • Promised completion31 Mar 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed100 files

Current status

24%32 of 135 units booked
39.4%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Modirealty AcaciaNA21201350135

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

Modirealty Acacia: 66% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed119

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots119
Closed/Covered119

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,033 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Jul 2025
LandownerVillageDistrict
Gulmarg Tarang CHS. LTD.DahisarMumbai Suburban

Approvals and building plan

Sanctioning authorityMaharashtra Housing and Area Development Authority
Permissible FSI8705.03
Proposed, not sanctioned8,705 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch30, Navyug SOC, Krishna Kunj VL Mehta Road, Juhu, opposite Sunflower Hospital, Vile Parle West, Mumb
Estimated costRs 53.57 cr
Cost incurredRs 21.11 cr
Work done39.4%
BuildingWingEstimatedIncurred
Modirealty AcaciaNARs 49.55 crRs 19.52 cr
-NARs 4.02 crRs 1.58 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShilp Associates
ArchitectRAY CONSULTANTS
ArchitectCNS CONSULTANTS
EngineerRupesh Chowdary
EngineerUnisteps Consulting Pvt Ltd
Chartered AccountantBagadia &Co
Chartered AccountantNehali & Co.
Chartered AccountantK.C.Jain Kala & Co.
PartnerRole in project
MODIREALTY DEVELOPERS PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Jan 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement certificateFile: 12395_ccrevalidation_signed.pdf24 Apr 2026
Withdrawal Update Form 1File: Signed_Form 1_Acacia_March 2026.pdf24 Apr 2026
Withdrawal Update Form 2File: Signed_Form 2_Acacia_March 2026.pdf24 Apr 2026
Withdrawal Update Form 3File: Signed_Form 3_Acacia_March 2026_org.pdf24 Apr 2026
Withdrawal Update Form 1File: Signed_Form 1_Acacia_March 2026.pdf23 Apr 2026
Withdrawal Update Form 2File: Signed_Form 2_Acacia_March 2026.pdf23 Apr 2026
Withdrawal Update Form 3File: Signed_Form 3_Acacia_March 2026_org.pdf23 Apr 2026
Withdrawal Update Form 1File: Signed_Form 1_Dec 25_Acacia.pdf14 Feb 2026
Withdrawal Update Form 2File: Signed_Form 2_Dec 25_Acacia.pdf14 Feb 2026
Withdrawal Update Form 3File: Signed_Form 3_Dec 25_Acacia_com.pdf14 Feb 2026
Withdrawal Update Form 1File: Signed_Form 1_Sept 25_Acacia.pdf9 Feb 2026
Withdrawal Update Form 2File: Signed_Form 2_Sept 25_Acacia.pdf9 Feb 2026
Withdrawal Update Form 3File: Updated - Signed_Form 3_Sept 25_Acacia.pdf9 Feb 2026
Building plan approvalFile: 23rd May 2025 Amended IOA Plan_SN9.pdf16 Jan 2026
Withdrawal Update Form 1File: Form 1 - Acacia.pdf12 Aug 2025
Withdrawal Update Form 2File: Form 2_ACACIA_June 2025.pdf12 Aug 2025
Withdrawal Update Form 3File: Form 3_June 2025_Signed.pdf12 Aug 2025
Layout approvalFile: 23rd May 25_Amended IOA Certificate.pdf11 Aug 2025
Building plan approvalFile: 1_Amended IOA Plan.pdf11 Aug 2025
Building plan approvalFile: 2_Amended IOA Plan.pdf11 Aug 2025
Building plan approvalFile: 3_Amended IOA Plan.pdf11 Aug 2025
Building plan approvalFile: 4_Amended IOA Plan.pdf11 Aug 2025
Building plan approvalFile: 5_Amended IOA Plan.pdf11 Aug 2025
Building plan approvalFile: 6_Amended IOA Plan.pdf11 Aug 2025
Building plan approvalFile: 7_Amended IOA Plan.pdf11 Aug 2025
Building plan approvalFile: 8_Amended IOA Plan.pdf11 Aug 2025
Building plan approvalFile: 9_Amended IOA Plan.pdf11 Aug 2025
Form 1File: Form 1_Acacia_Dec 24.pdf6 Aug 2025
Form 2File: Form 2_Acacia_Dec 24.pdf6 Aug 2025
Form 3File: Form 3_Acacia_Dec 24.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: 31-12-2024 Disclosure of Sold and Unsold inventory - Acaica.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: 30-09-2024 Disclosure of Sold and Unsold inventory - Acaica.pdf6 Aug 2025
Form 1File: Form 1_Acacai_Sept 24.pdf6 Aug 2025
Form 2File: Form 2_Acacai_Sept 24 1.pdf6 Aug 2025
Form 3File: Form 3_Acacia_Sept 24.pdf6 Aug 2025
Form 1File: FORM 1_ACACIA_JUNE 2024.pdf6 Aug 2025
Form 2File: FORM 2_ACACIA_JUNE 2024.pdf6 Aug 2025
Form 3File: FORM 3_ACACIA_JUNE 2024.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: 30-06-2024 Disclosure of Sold and Unsold inventory - Acaica.pdf6 Aug 2025
Form 1File: FORM 1_ACACIA_MARCH 2025.pdf30 Jul 2025
Form 2File: FORM 2_ACACIA_MARCH 2025.pdf30 Jul 2025
Form 3File: FORM 3_ACACIA_MARCH 2025.pdf30 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Secured Unsecured - Acacia.pdf30 Jul 2025
Withdrawal Update Form 1File: FORM 1_ACACIA_MARCH 2025.pdf30 Jul 2025
Withdrawal Update Form 2File: FORM 2_ACACIA_MARCH 2025.pdf30 Jul 2025
Withdrawal Update Form 3File: FORM 3_ACACIA_MARCH 2025.pdf30 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ACACIA_MARCH 2025.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ACACIA_MARCH 2025.pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ACACIA_MARCH 2025.pdf6 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Acacia_Dec 24.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Acacia_Dec 24.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Acacia_Dec 24.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Acacai_Sept 24.pdf13 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Acacia_Sept 24.pdf13 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Acacai_Sept 24 1.pdf13 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ACACIA_JUNE 2024.pdf26 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ACACIA_JUNE 2024.pdf26 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ACACIA_JUNE 2024.pdf26 Jul 2024
Other - LegalFile: 1 - Additional Declaration.pdf1 Jun 2024
Other - LegalFile: 2 - Additional Declaratuon.pdf1 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Letter For AFS 1.pdf9 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Letter For AFS 2.pdf9 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Letter For AFS 3.pdf9 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Letter For AFS 4.pdf9 May 2024
Deviation Report with respect to model copy of AgreementFile: Sale Agreement draft - Acacia.pdf9 May 2024
Proforma of Agreement for saleFile: Sale Agreement draft - Acacia.pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-ACACIA-MAR 24 - FINAL.pdf20 Apr 2024
Declaration in FORM BFile: FORM B DEVELOPER.pdf15 Mar 2024
Declaration in FORM BFile: DECLARATION CUM UNDERTAKING.pdf15 Mar 2024
Copy of the legal title reportFile: Revised Final Title.pdf7 Mar 2024
Copy of the legal title reportFile: Flow of Title Certificate.pdf7 Mar 2024
Copy of the legal title reportFile: Search report - Acacia.pdf7 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1 - ACACIA.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 - ACACIA.pdf29 Feb 2024
CERSAI detailsFile: Cersai Declaration.pdf29 Feb 2024
Proforma of Allotment letterFile: Allotment Letter draft - Acacia.pdf29 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Details.pdf29 Feb 2024
Deviation Report with respect to Allotment letterFile: No deviation letter - AL.pdf29 Feb 2024
Details of encumbrances concerned to FinanceFile: Declaration for Financial Encumbrances.pdf28 Feb 2024
Details of encumbrances concerned to FinanceFile: Declaration for legal Encumbrances.pdf28 Feb 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Modirealty VatvrikshP51800047278Goregaon West, Mumbai Suburban99Oct 2022CompletedSep 2026Apr 2025
MODIREALTY WISTERIAP51800034890KANDIVALI WEST, Mumbai Suburban107Apr 2022CompletedMar 2026Feb 2025
MODIREALTY KALPVRIKSHLallubhai Park Andheri west Mumbai 40005811-CompletedMar 2025Oct 2023

How this compares with Mumbai Suburban

24%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MODIREALTY ACACIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dahisar East6,700+ in Mumbai Suburban

2 kmMODIREALTY ACACIACompleted 103Lapsed / revoked 68Other 159Dot size: filed unitsN

Filed coordinates, straight-line distance. 330 registered projects within 2 km.

Builder: MODIREALTY DEVELOPERS PVT LTD

MODIREALTY DEVELOPERS PVT LTD has 6 registrations on MahaRERA, including MODIREALTY KALPVRIKSH and MODIREALTY WISTERIA. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if MODIREALTY ACACIA is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MODIREALTY ACACIA?

The registered promoter entity is MODIREALTY DEVELOPERS PVT LTD, a company as per the filing. Its CIN U70109MH2020PTC350147 and GSTIN 27AAOCM0584E1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MODIREALTY ACACIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MODIREALTY ACACIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MODIREALTY ACACIA?

The professionals named in the filing: Architect: Shilp Associates; Architect: RAY CONSULTANTS; Architect: CNS CONSULTANTS; Engineer: Rupesh Chowdary; Engineer: Unisteps Consulting Pvt Ltd; Chartered Accountant: Bagadia &Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MODIREALTY ACACIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MODIREALTY ACACIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MODIREALTY ACACIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.