Home / Browse projects / Thane, Maharashtra / MM VALLEY A-1

Completed No litigation declared Residential / Group Housing project

MM VALLEY A-1

By ALFA ENTERPRISES

RG-MH-04571 · RERA P51700024240 · Last updated on MahaRERA portal: 4 Oct 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Internal walls, 99%
20 of 184Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 189 documents Report an error

MM VALLEY A-1 is a Residential / Group Housing project by ALFA ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700024240 on 29 Jan 2020. The registration is recorded completed; possession was promised by 30 Dec 2025. 164 of the 184 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMM VALLEY A-1
  • TypeResidential / Group Housing
  • Location
    • SONKHAR
    • KAUSA-MUMBRA-THANE
    • Thane (M Corp.)
    • Thane
    • 400612
  • Pincode400612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700024240
  • ReraGenie IDRG-MH-04571

Builder

  • NameALFA ENTERPRISES
  • Entity typePartnership
  • PartnersMOHAMMED MUSTAFA MOHAMMED MASROOR SHAIKH, MOHAMMED MASROOR MOHAMMED IDRIS SHAIKH
  • Other registrations3 more →
  • Completed3 of 4

Key dates

this monthRegisteredJan 2020PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Jan 2020
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed189 files

Current status

89%164 of 184 units booked
98.5%Work done, per cost certificate

Figures as on 4 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A-1 MM VALLEY PREMIUMNA272716816184

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 99%.

A-1 MM VALLEY PREMIUM: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises48%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.86%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.45%

Progress on shared amenities15

As on 4 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes85%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes33%
Storm Water DrainsYes55%
Landscaping & Tree PlantingYes60%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed7

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots7
Closed/Covered7

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,864 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Sep 2024

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI15207.54
Proposed, not sanctioned9,115 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGala No 14, Kanakia Zillion, D 514, Lal Bahadur Shastri Marg, Next to Bus Depot, Ambedkar Nagar, Kur
Estimated costRs 29.45 cr
Cost incurredRs 29.02 cr
Work done98.54%
BuildingWingEstimatedIncurred
A-1 MM VALLEY PREMIUMNARs 27.45 crRs 27.28 cr
-NARs 2.00 crRs 1.74 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJOSHI DESHAWARE & ASSOCIATES
EngineerVALUE PROJECT MANAGEMENT CONSULTANTS
Chartered AccountantSHASHANK R JAIN
Chartered AccountantW S USMANI & CO
PartnerRole in project
ALFA ENTERPRISES-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000197039Amjad Aziz MeherbakshM/s.Alfa Enterprises21/05/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Oct 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed189

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 189 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5 A1 24-25.pdf4 Oct 2025
Occupational CertificateFile: Technical Query Reply- A.pdf27 Sep 2025
Occupational CertificateFile: Plan 1.pdf27 Sep 2025
Occupational CertificateFile: Balance Full OC.pdf27 Sep 2025
Occupational CertificateFile: OC -GR + 1st .pdf27 Sep 2025
Occupational CertificateFile: CC - of A1.pdf27 Sep 2025
Building plan approvalFile: Plan_03-07-2023 - Copy (1)-0001_120dpi_75%.pdf23 Sep 2025
Building plan approvalFile: Plan 2.pdf23 Sep 2025
Building plan approvalFile: Plan 3.pdf23 Sep 2025
Building plan approvalFile: Plan 4 .pdf23 Sep 2025
Building plan approvalFile: Plan 5.pdf23 Sep 2025
Building plan approvalFile: Plan 6 .pdf23 Sep 2025
Building plan approvalFile: Plan 7.pdf23 Sep 2025
Building plan approvalFile: Plan 8 .pdf23 Sep 2025
Building plan approvalFile: Plan 9.pdf23 Sep 2025
Building plan approvalFile: Plan 10 .pdf23 Sep 2025
Building plan approvalFile: Plan 11.pdf23 Sep 2025
Occupational CertificateFile: Mail from Officer.pdf23 Sep 2025
Form 2A (FY 2024-2025)File: A-1 Final Quality Assurance Cert.-12.06.25.pdf23 Jul 2025
Form 1File: FORM 1.pdf19 Jul 2025
Form 2File: FORM 2.pdf19 Jul 2025
Form 3File: FORM 3.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JOSHI DESHAWARE 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 A1 31032025_compressed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 A1 31032025.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: MM Valley A1.pdf19 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 -Final 23-24.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A-1 Architect Certificate signed.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31122024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 31122024 signed.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: A-1 Sold Unsold - 311224 signed.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A-1 Architect Certificate signed.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of A1 30092024.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A1 Engineer Certificate 30062024.pdf23 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30062024.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 A1 30062024.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: A-1-Form-2A-Quality Assurance Cert FY 23-24.pdf5 Jun 2024
Declaration about Commencement CertificateFile: Declaration A-1.pdf29 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 A1 31032024.pdf29 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A1 31032024.pdf29 Apr 2024
Disclosure of sold/ booked inventoryFile: A-1 sold unsold flats.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 A1 31032024_merged_compressed.pdf29 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC-030723-A-1.pdf25 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 -Final.pdf3 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A-1 Architect cert 31122023.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A-2 Eng Certificate.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: list of sold unsold of A-1.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 A1 31122023_Uploaded.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 30092023.PDF14 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 30092023_compressed.pdf14 Oct 2023
Disclosure of sold/ booked inventoryFile: A-1-List of sold unsold with sign 30092023compressed.pdf14 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 A1 signed - 300923_compressed.pdf14 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate 11082023.pdf9 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate signed.pdf4 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 with signed_compressed.pdf4 Sep 2023
Disclosure of sold/ booked inventoryFile: A-1 List of sold unsold.pdf17 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate with signed.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer's Certificate 30062023_compressed.pdf20 Jul 2023
Disclosure of sold/ booked inventoryFile: List of sold unsold with sign_compressed.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 MM Group A1 30062023_compressed.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 17042023_compressed.pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 17042023.PDF17 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer's Certificate_compressed.pdf17 Jul 2023
Disclosure of sold/ booked inventoryFile: Soldunsold Inventory 17042023_compressed.pdf17 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 A1 170423 with sign_compressed.pdf17 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A A1Quality Assurance Cert 310323_compressed.pdf26 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 300323.pdf25 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer's Certificate A1 30032023_compressed.pdf25 May 2023
Disclosure of sold/ booked inventoryFile: A-1 List of sold unsold upto 300323_compressed.pdf25 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30032023 A1_compressed.pdf25 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Cert 140323.pdf18 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 14032023_compressed.pdf18 May 2023
Disclosure of sold/ booked inventoryFile: A-1-Sold unsold 14032023 with sign_compressed.pdf18 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 14032023 A1_compressed-1-6.pdf18 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 14032023 A1_compressed-7-12.pdf18 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate 08022023 compressed.pdf26 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer's Certificate 080223 compressed.pdf24 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect's Certificate-28-02-23.pdf4 Apr 2023

How this compares with Thane

89%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MM VALLEY A-1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KAUSA-MUMBRA-THANE7,600+ in Thane

2 kmMM VALLEY A-1Completed 2Lapsed / revoked 1Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: ALFA ENTERPRISES

ALFA ENTERPRISES has 4 registrations on MahaRERA, including M M VALLEY C1 and M M VALEY A2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if MM VALLEY A-1 is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MM VALLEY A-1?

The registered promoter entity is ALFA ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MM VALLEY A-1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MM VALLEY A-1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MM VALLEY A-1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MM VALLEY A-1?

The professionals named in the filing: Architect: JOSHI DESHAWARE & ASSOCIATES; Engineer: VALUE PROJECT MANAGEMENT CONSULTANTS; Chartered Accountant: SHASHANK R JAIN; Chartered Accountant: W S USMANI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MM VALLEY A-1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MM VALLEY A-1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MM VALLEY A-1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.