Mizura Residences by Esbee

By Esbee Greenspaces LLP

RG-MH-88375 · RERA PM1260002502579 · Last updated on MahaRERA portal: 2 Sep 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • Rs 30.00 crore secured on the land, in favour of Aditya Birla Capital Limited
  • Allotment letter deviates from the model form

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2030Possession promisedno revision filed
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 95%
228 of 300Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 24 documents Report an error

Mizura Residences by Esbee is a Mixed project by Esbee Greenspaces LLP in Pune, Maharashtra, registered with MahaRERA as PM1260002502579 on 4 Mar 2026. Possession is promised by 30 Jun 2030. 72 of the 300 units on this registration are recorded sold or booked, and 0 of 33 construction stages are filed complete.

At a glance

Project

  • NameMizura Residences by Esbee
  • TypeMixed
  • Location
    • S.No. 69/A
    • 69B/1
    • 69B/2 and 69/C
    • MANJARI Bk
    • Haveli
    • Pune
    • 412307
  • Pincode412307
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1260002502579
  • ReraGenie IDRG-MH-88375

Builder

  • NameEsbee Greenspaces LLP
  • Entity typeLimited Liability Partnership
  • LLPINACJ-8824
  • GSTIN27AALFE5395B1ZB
  • DirectorsAnuj Rajesh Agarwal, Ankit Rajesh Agarwal

Key dates

this monthRegisteredMar 2026PromisedJun 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Mar 2026
  • Promised completion30 Jun 2030
  • Revised completionNone
  • Buildings3 building records
  • Documents filed24 files

Current status

24%72 of 300 units booked
2.5%Work done, per cost certificate

Figures as on 2 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower ANA31271350135
Tower BNA31271350135
TOWER CNA6323730

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 2 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 95%.

Tower A9%
ActivityProgress
Excavation95%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.-
Tower B9%
ActivityProgress
Excavation95%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.-
TOWER C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.-

Progress on shared amenities15

As on 2 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNo0%
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable

Parking filed540

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots540
Closed/Covered540
BuildingClosed/CoveredTotal
Tower A270270
Tower B214214
TOWER C5656

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area6,672 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital Limited
Secured amountRs 30.00 crore
CERSAI search filedYes
Declared on1 May 2026
LandownerVillageDistrict
Sanjay Ram Takale-Pune

Approvals and building plan

Permissible FSI29589.65
Proposed, not sanctioned29,590 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI BANK LTD, G 10, BOULEWARD TOWER, NEAR SADHU VASWANI CHOW, PUNE 411001
Estimated costRs 92.05 cr
Cost incurredRs 2.31 cr
Work done2.5%
BuildingWingEstimatedIncurred
Tower ANARs 24.55 crRs 61.47 lakh
Tower BNARs 24.55 crRs 61.47 lakh
TOWER CNARs 24.55 crRs 61.47 lakh
-NARs 18.41 crRs 46.10 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSahil Khinvasara
EngineerMayur Akhade
Chartered AccountantPatel and Sharma
PartnerRole in project
Esbee Greenspaces LLP-

Litigation declared1

CaseCourtStatus
4018/2012CJSD PuneOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jun 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2030

Documents filed24

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: 02 Form - 2A Quality Assurance_Mizura.pdf2 Sep 2026
Withdrawal Update Form 1File: Form 1 June 2026 Mizura Residencies.pdf29 Jul 2026
Withdrawal Update Form 1File: Form 1 June 2026 Mizura Residencies.pdf29 Jul 2026
Withdrawal Update Form 2File: Form 2 June 2026 Mizura Residencies.pdf29 Jul 2026
Withdrawal Update Form 2File: Form 2 June 2026 Mizura Residencies.pdf29 Jul 2026
Withdrawal Update Form 3File: Form 3 June 2026 Mizura Residencies.pdf29 Jul 2026
Withdrawal Update Form 3File: Form 3_CA Certificate.pdf29 Jul 2026
Layout approvalFile: 01 Layout Plan_Highlighted.pdf1 Jun 2026
Building plan approvalFile: 02 Ground Floor and Basement.pdf1 Jun 2026
Building plan approvalFile: 02 Tower A and B GF and B.pdf1 Jun 2026
Building plan approvalFile: 03 Wing A and Wing B 1st to 27th Floors.pdf1 Jun 2026
Building plan approvalFile: 04 28th Floor and Terrace plan_.pdf1 Jun 2026
Building plan approvalFile: 05 Wing A and B Section Elevation_.pdf1 Jun 2026
Building plan approvalFile: 06 1st 2nd and 3rd Floor Wing C_.pdf1 Jun 2026
Building plan approvalFile: 07 Elevation_Wing C.pdf1 Jun 2026
Withdrawal Update Form 1File: Form 1_Architect Certificate_QPR4_Mizura.pdf30 May 2026
Withdrawal Update Form 2File: Form 2_Engg Certificate_QPR4_Mizura.pdf30 May 2026
Withdrawal Update Form 3File: Form 3_CA Certificate.pdf30 May 2026
Withdrawal Update Form 1File: Form 1_Architect Certificate_QPR4_Mizura.pdf12 May 2026
Withdrawal Update Form 2File: Form 2_Engg Certificate_QPR4_Mizura.pdf12 May 2026
Withdrawal Update Form 3File: Form 3_C A Certificate_QPR4_Mizura.pdf12 May 2026
Layout approvalFile: Layout.pdf14 Feb 2026
Building plan approvalFile: 2-7 building plan.pdf14 Feb 2026
Declaration and undertaking (Annexure A)File: Annexure A_ Declaration Cum Undertaking.pdf14 Feb 2026

How this compares with Pune

24%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mizura Residences by Esbee on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MANJARI Bk13,700+ in Pune

2 kmMizura Residences by EsbCompleted 13Lapsed / revoked 7Other 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 45 registered projects within 2 km.

Builder: Esbee Greenspaces LLP

Esbee Greenspaces LLP has 1 registration on MahaRERA, including Mizura Residences by Esbee. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Mizura Residences by Esbee is delayed beyond 30 Jun 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mizura Residences by Esbee?

The registered promoter entity is Esbee Greenspaces LLP, a limited liability partnership as per the filing. Its LLPIN ACJ-8824 and GSTIN 27AALFE5395B1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mizura Residences by Esbee?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mizura Residences by Esbee?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mizura Residences by Esbee?

The professionals named in the filing: Architect: Sahil Khinvasara; Engineer: Mayur Akhade; Chartered Accountant: Patel and Sharma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mizura Residences by Esbee?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mizura Residences by Esbee. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mizura Residences by Esbee to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.