Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MITRAKUNJ is a Residential / Group Housing project by Kishor Sancheti in Pune, Maharashtra, registered with MahaRERA as P52100049348 on 7 Feb 2023. The registration is recorded completed; possession was promised by 31 Dec 2024.
At a glance
Project
- NameMITRAKUNJ
- TypeResidential / Group Housing
- Location
- Mitra Mandal Co-op Housing Society Ltd
- Parvati
- Haveli
- Pune
- 411009
- Pincode411009
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100049348
- ReraGenie IDRG-MH-82908
Builder
- NameKishor Sancheti
- Entity typeIndividual
- GSTIN27ADHPS2286A1ZK
- DirectorKishor Sancheti
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on7 Feb 2023
- Promised completion31 Dec 2024
- Revised completionNone
- Buildings1 building record
- Documents filed93 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MITRAKUNJ | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 11 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
MITRAKUNJ: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 11 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed56
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Kishor Bansilal Sancheti | Pune (M Corp.) | Pune |
| Anita Kishor Sancheti | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Prakash Kanhekar |
| Engineer | Mr.Balasaheb J. Bhalsing |
| Engineer | Balasaheb Bhalsing |
| Chartered Accountant | A S Padhye |
| Chartered Accountant | A.S. Padhye & Associates |
| Chartered Accountant | V.C.VENKATRAMAN & CO |
| Partner | Role in project |
|---|---|
| Kishor B Sancheti | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Feb 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Oct 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 8 Oct 2024
Documents filed93
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 11 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 1.pdf | 11 Oct 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 11 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 1.pdf | 11 Oct 2024 |
| Building plan approvalFile: Plan_compressed.pdf | 8 Oct 2024 |
| Building plan approvalFile: 2-2_compressed.pdf | 8 Oct 2024 |
| Building plan approvalFile: Plan_compressed.pdf | 8 Oct 2024 |
| Building plan approvalFile: 2-2_compressed.pdf | 8 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3.pdf | 8 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 092024.pdf | 8 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate Mitrakunj.pdf | 8 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate0.pdf | 8 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan_compressed.pdf | 8 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2-2_compressed.pdf | 8 Oct 2024 |
| Other - TechnicalFile: Form 4.pdf | 8 Oct 2024 |
| Other - LegalFile: Form 4.pdf | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 092024.pdf | 8 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3.pdf | 8 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 8 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate0.pdf | 8 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan_compressed.pdf | 8 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2-2_compressed.pdf | 8 Oct 2024 |
| Other - LegalFile: Form 4.pdf | 8 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate Mitrakunj.pdf | 8 Oct 2024 |
| Other - TechnicalFile: Form 4.pdf | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Certificate june24.pdf | 22 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer's Certificate June2024.pdf | 22 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY june2024.pdf | 22 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 JUNE2024.pdf | 22 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A23-24.pdf | 5 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 CA 23-2024.pdf | 5 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A23-24.pdf | 13 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 CA 23-2024.pdf | 13 Apr 2024 |
| Other - FinanceFile: Form 5 CA 23-2024.pdf | 13 Apr 2024 |
| Other - TechnicalFile: FORM-2A23-24.pdf | 13 Apr 2024 |
| Building plan approvalFile: Plan Copy 1.pdf | 22 Mar 2024 |
| Building plan approvalFile: Plan Copy 2 (2).pdf | 22 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Copy 1.pdf | 22 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Copy 2 (2).pdf | 22 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate2.pdf | 22 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Certificate march24.pdf | 22 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 engineer March24.pdf | 22 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 engineer March24.pdf | 22 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY march2024.pdf | 22 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March2024.pdf | 22 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Archetect Certificate Dec end.pdf | 27 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 engineer Dec end.pdf | 27 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY Dec end.pdf | 27 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Dec end.pdf | 27 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 CA.pdf | 11 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: March.pdf | 4 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: June.pdf | 4 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Septmber.pdf | 4 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 CA.pdf | 30 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Archetect Certificate March end.pdf | 23 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Archetect Certificate june end.pdf | 23 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Archetect Certificate Sep End.pdf | 23 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 engineer March end.pdf | 23 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 engineer June end.pdf | 23 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 engineer Sep end.pdf | 23 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Engineer Certificate.pdf | 23 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY.pdf | 23 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY June end.pdf | 23 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY Sep End.pdf | 23 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 CA.pdf | 23 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Certificate New.pdf | 9 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer's Certificate New.pdf | 9 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Engineers Certificate.pdf | 9 Nov 2023 |
| Proforma of Agreement for saleFile: Mitrakunj Agreement Draft.pdf | 15 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report - Model.pdf | 15 Mar 2023 |
| Other - TechnicalFile: Proposed Plan.pdf | 15 Mar 2023 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 2 Feb 2023 |
| Proforma of Agreement for saleFile: Model Agreement RERA.pdf | 2 Feb 2023 |
| Deviation Report with respect to model copy of AgreementFile: no deviation.pdf | 2 Feb 2023 |
| Other - LegalFile: Property Card Malmattapatrak New 2022 Mitramandal.pdf | 17 Jan 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.pdf | 9 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA (1).pdf | 4 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 31 Dec 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf | 19 Dec 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Mount N Glory | S.No 58 Hissa No 2 2 1A 2 2 1A 1B Near Eon Software Park Kharadi Tal Haveli Pune 411014 | 372 | Completed | Mar 2012 | Mar 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 93 filed documents as one ZIP, foldered, with a manifest
Keep MITRAKUNJ on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Parvati13,700+ in Pune
Filed coordinates, straight-line distance. 242 registered projects within 2 km.
Sai Towers
CITY ETHERNAL LLP
ARCO SKYLIFE
ARCO ENGINEERS
Shrirang Park
NBC PROJECTS
NYATI EMBLEM
NYATI CONSTRUCTION PRIVATE LIMITED
SHALIMAR
SONIGARA VENTURES
SUMEDHA
SHREE RAM BUILDERS & PROMOTERS
Builder: Kishor Sancheti
Kishor Sancheti has 1 registration on MahaRERA, including MITRAKUNJ. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if MITRAKUNJ is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MITRAKUNJ?
The registered promoter entity is Kishor Sancheti, an individual as per the filing. Its GSTIN 27ADHPS2286A1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MITRAKUNJ?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MITRAKUNJ?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MITRAKUNJ?
The professionals named in the filing: Architect: Prakash Kanhekar; Engineer: Mr.Balasaheb J. Bhalsing; Engineer: Balasaheb Bhalsing; Chartered Accountant: A S Padhye; Chartered Accountant: A.S. Padhye & Associates; Chartered Accountant: V.C.VENKATRAMAN & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MITRAKUNJ?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback