Home / Browse projects / Nashik, Maharashtra / MITHILA at Aaryavarta

Registration lapsed No litigation declared Others project

MITHILA at Aaryavarta

By LINKER SHELTER PRIVATE LIMITED

RG-MH-13750 · RERA P51600031023 · Last updated on MahaRERA portal: 15 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 35 documents Report an error

MITHILA at Aaryavarta is a Others project by LINKER SHELTER PRIVATE LIMITED in Nashik, Maharashtra, registered with MahaRERA as P51600031023 on 1 Oct 2021. Possession was promised by 30 Jun 2026 and is now 4 months past that date.

At a glance

Project

  • NameMITHILA at Aaryavarta
  • TypeOthers
  • Location
    • Near Ranapratap Chowk
    • Mahalemala near CIDCO
    • Nashik (M Corp.)
    • Nashik
    • 422009
  • Pincode422009
  • RERA no.P51600031023
  • ReraGenie IDRG-MH-13750

Builder

  • NameLINKER SHELTER PRIVATE LIMITED
  • Entity typeCompany
  • DirectorPushkar Apte
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

4 months past promisethis monthRegisteredOct 2021PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Oct 2021
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed35 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building -2BNA130000
Building -3NA140000
Building -4NA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 15 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.

Building -2B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building -30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building -40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities17

As on 15 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
SWIMMING POOLYes0%
Club HouseYes0%

Parking filed386

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots386
Closed/Covered356
Open Space30
BuildingClosed/CoveredOpen SpaceTotal
Building -2B103040
Building -31060106
Building -42400240

Land and ownership13

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area16,824 sq m
Land owned byThe promoter, with other names on the file
Named landowners13
LandownerVillageDistrict
Uttamrao Nabhaji MahaleNashik (M Corp.)Nashik
Namdeorao Nabhaji MahaleNashik (M Corp.)Nashik
Rajendra Uttamrao MahaleNashik (M Corp.)Nashik
Ravindra Uttamrao MahaleNashik (M Corp.)Nashik
Rahul Uttamrao MahaleNashik (M Corp.)Nashik
Sandeep Uttamrao MahaleNashik (M Corp.)Nashik
Sahebrao Uttamrao MahaleNashik (M Corp.)Nashik
Amol Namedeorao MahaleNashik (M Corp.)Nashik
Deepak Wamanrao MahaleNashik (M Corp.)Nashik
Yogesh Wamanrao MahaleNashik (M Corp.)Nashik
Prakash Wamanrao MahaleNashik (M Corp.)Nashik
Anusuya Namdeorao MahaleNashik (M Corp.)Nashik
Hirabai Wamanrao MahaleNashik (M Corp.)Nashik

Approvals and building plan

Permissible FSI39695.49
Proposed, not sanctioned39,595 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBhujbal Farm Road Nashik

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Sambhaji D Patil
EngineerS W Mone & Associates
Chartered AccountantGosavi yardi & Company
PartnerRole in project
LINKER SHELTER PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed35

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Mithila Aaryavarta-Dec'24-uploaded.pdf15 Jan 2025
Disclosure of sold/ booked inventoryFile: Mithila.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Mithila 23-24-uploaded.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Mithila Aaryavarta-Sept'24-uploaded.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Mithila at Aryavarta Nashik September 2024-uploaded.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: Inventory Report-Mithila at Aryavarata-Mar'24-uploaded.pdf4 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory- Mithila at Aaryavarta-June'24-uploaded.pdf4 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Mithila Aaryavarta-Mar'24.pdf4 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Mithila at Aryavarta-Dec'23.pdf30 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Mithila at Aryavarta-Dec'23-uploaded.pdf24 Jan 2024
Disclosure of sold/ booked inventoryFile: 3 Mitihila at Aaryavarta -Inventory Report-Dec'23-uploaded.pdf5 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FOrm 5 -Mithila at Aryavarta -FY 22-23.pdf27 Oct 2023
Disclosure of sold/ booked inventoryFile: Inventory data-Mithila RERA-compressed-Sept'23-uploaded.pdf3 Oct 2023
Disclosure of sold/ booked inventoryFile: Inventory Report-MITHILA AT AARYAVARTA-June'23-uploaded.pdf27 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: MIthila-Form 5-31Mar2022.pdf16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MITHILA at Aryavarta RERA FORM1-Mar 22-compressed-uploaded.pdf13 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12 MITHILA AARYAVARTA -Form 1-Dec 22-compressed-uploaded.pdf13 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Mithila Nashik Form 2-Dec-2021.pdf13 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Mithila Nashik Form 2-Mar-2022.pdf13 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Mithila Nashik Form 2- June-2022.pdf13 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Mithila Nashik Form 2- Sept -2022.pdf13 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Mithila Nashik Form 2-Dec-2022.pdf13 Feb 2023
Layout approvalFile: scan1106.pdf21 Sep 2021
Building plan approvalFile: scan1106.pdf21 Sep 2021
Copy of Layout Approval (in case of layout)File: scan1106.pdf21 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: scan1106.pdf21 Sep 2021
Declaration about Commencement CertificateFile: Format D Declaration about commencement.pdf21 Sep 2021
Declaration in FORM BFile: FORM B Promoter linker Mithila at Aryawarta.pdf21 Sep 2021
Proforma of Allotment letterFile: Allotment Letter-Aaryawarta_compressed.pdf21 Sep 2021
Proforma of Allotment letterFile: 1 Aaryawart PhII Standard RERA Agreement to sell draft Build 3 4Revised4 on 21 09 2021 com21 Sep 2021
PAN CardFile: PAN Card-linker.pdf20 Sep 2021
Details of encumbrancesFile: Encumbrance Certifiacte.pdf20 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf20 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mithila Form 3.pdf20 Sep 2021
Copy of the legal title reportFile: Mithila New title Report Format compressed.pdf5 Apr 2021

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is among them

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MITHILA at Aaryavarta on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mahalemala near CIDCO4,100+ in Nashik

Builder: LINKER SHELTER PRIVATE LIMITED

LINKER SHELTER PRIVATE LIMITED has 2 registrations on MahaRERA, including AARYAVARTA SECTOR 4 - B TO H and MITHILA at Aaryavarta. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What does it mean that MITHILA at Aaryavarta shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if MITHILA at Aaryavarta is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MITHILA at Aaryavarta?

The registered promoter entity is LINKER SHELTER PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MITHILA at Aaryavarta?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MITHILA at Aaryavarta?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MITHILA at Aaryavarta?

The professionals named in the filing: Architect: Ar Sambhaji D Patil; Engineer: S W Mone & Associates; Chartered Accountant: Gosavi yardi & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MITHILA at Aaryavarta?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MITHILA at Aaryavarta. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MITHILA at Aaryavarta to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.