ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / MIRAYA TRINITY - ETERNITY

Registered No litigation declared Residential / Group Housing project

MIRAYA TRINITY - ETERNITY

By MEXTECH PROPERTY DEVELOPERS LLP

RG-MH-93025 · RERA P51700080732 · Last updated on MahaRERA portal: 29 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 15%
142 of 178Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

MIRAYA TRINITY - ETERNITY is a Residential / Group Housing project by MEXTECH PROPERTY DEVELOPERS LLP in Thane, Maharashtra, registered with MahaRERA as P51700080732 on 30 Jun 2025. Possession is promised by 15 Dec 2029. 36 of the 178 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameMIRAYA TRINITY - ETERNITY
  • TypeResidential / Group Housing
  • Location
    • Sector No. 4
    • Majiwade
    • Thane (M Corp.)
    • Thane
    • 400601
  • Pincode400601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700080732
  • ReraGenie IDRG-MH-93025

Builder

  • NameMEXTECH PROPERTY DEVELOPERS LLP
  • Entity typeOthers
  • GSTIN27ABSFM3880H1ZO
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Designated PartnersHIREN HANSRAJ CHHEDA CHHEDA, ANIL NAGRAJ MUTHA MUTHA, RAJESH RAVJIBHAI PATEL PATEL
  • Other registrations3 more →

Key dates

this monthRegisteredJun 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on30 Jun 2025
  • Promised completion15 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed68 files

Current status

20%36 of 178 units booked
20.5%Work done, per cost certificate

Figures as on 29 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 5 Miraya EternityNA44381780178

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 15%.

Building No 5 Miraya Eternity: 38% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed504

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots504
Closed/Covered443
Open Space61

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area22,695 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Aug 2025
LandownerVillageDistrict
FERMENTA BIOTECH LIMITEDThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityThane Municipal Corporation (TMC)
Permissible FSI18357.5
Proposed, not sanctioned18,358 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLR SHOP NO 2 3 MINT NEAR HIRANANDANI MEADOWS THANE MAHARASHTRA 400607
Estimated costRs 117.03 cr
Cost incurredRs 24.01 cr
Work done20.51%
BuildingWingEstimatedIncurred
Building No 5 Miraya EternityNARs 106.69 crRs 22.99 cr
-NARs 10.34 crRs 1.02 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSuvarna Ghosh
EngineerVenturx Project Service LLP
Chartered AccountantKARTIK JAYANTILAL PATEL
Chartered AccountantVELANI AND POKAR
PartnerRole in project
MEXTECH PROPERTY DEVELOPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Mar 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Aug 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 15 Dec 2029

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: T5 Form 31032026.pdf29 Apr 2026
Withdrawal Update Form 2File: T5_form 2_March26.pdf29 Apr 2026
Withdrawal Update Form 3File: Form 3 31032026.pdf29 Apr 2026
Withdrawal Update Form 1File: BLDG 05_MIRAYA TRINITY ETERNITY 31_12_25.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 Signed.pdf20 Jan 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 Uploaded.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1 TOWER 05_MIRAYA 30_09_25.pdf20 Oct 2025
Withdrawal Update Form 2File: RERA_Eng Cert_Miraya Trinity Eternity.pdf20 Oct 2025
Withdrawal Update Form 3File: Withdrawal Application Form3 Scanned.pdf20 Oct 2025
Building plan approvalFile: Mextech Layout Plan 1 to 2.pdf1 Sep 2025
Building plan approvalFile: Mextech Layout Plan 3 to 7.pdf1 Sep 2025
Building plan approvalFile: Mextech Layout Plan 8 to 16.pdf1 Sep 2025
Building plan approvalFile: Mextech Layout Plan 17 to 25.pdf1 Sep 2025
Building plan approvalFile: Mextech Layout Plan 26 to 33.pdf1 Sep 2025
Building plan approvalFile: 2.pdf1 Sep 2025
Building plan approvalFile: Layout Plan- 2.pdf1 Sep 2025
Building plan approvalFile: Layout Plan- 3.pdf1 Sep 2025
Building plan approvalFile: Layout Plan- 4.pdf1 Sep 2025
Building plan approvalFile: Revised CC.pdf1 Sep 2025
Building plan approvalFile: Mextech__Commencement Certificate.pdf30 Aug 2025
Form 1File: Self Declaration.pdf20 Jul 2025
Form 2File: Self Declaration.pdf20 Jul 2025
Form 3File: Self Declaration.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Self Declaration.pdf20 Jul 2025
Other - LegalFile: Declaration cum Indemnity - FBL - TMC.pdf23 Jun 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Mextech.pdf23 Jun 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Mextech - Format A_Final.pdf21 Jun 2025
Other - TechnicalFile: Payment Receipt.pdf21 Jun 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B_Fermenta.pdf21 Jun 2025
Other - LegalFile: FBL-Mextech - Lease Deed Between Mextech and MSEDCl TNN2-18357-2024.pdf19 Jun 2025
Other - LegalFile: FBL-Mextech - Deed Of Transfer Between FBL To TMC TNN12-17338-2023 Dated 12122023.pdf19 Jun 2025
Other - LegalFile: 414-1C-1.pdf19 Jun 2025
Other - TechnicalFile: Pomoter declaration on project note and fees.pdf19 Jun 2025
Other - TechnicalFile: Architect - MEXTECH - Declaration Note.pdf19 Jun 2025
Details of encumbrances concerned to FinanceFile: Encumbrance to Finance (2).pdf30 Apr 2025
Details of encumbrances concerned to LegalFile: Encumbrance to Finance (2).pdf30 Apr 2025
Other - TechnicalFile: CC Verifictaion Screen Shot.pdf28 Apr 2025
Details of encumbrances concerned to FinanceFile: final Encumbrance to Finance (1).pdf22 Mar 2025
CERSAI detailsFile: CERSAI Declaration (3).pdf22 Mar 2025
Details of encumbrances concerned to LegalFile: final Encumbrance to Finance (1).pdf22 Mar 2025
Other - TechnicalFile: Order No 50-2024_One Plot One Registration Eternity.pdf22 Mar 2025
Layout approvalFile: Layout of all 4 Towers signed final-1-4 highlighted.pdf21 Mar 2025
Layout approvalFile: Layout of all 4 Towers signed final-4-8.pdf21 Mar 2025
Layout approvalFile: Layout of all 4 Towers signed final-9-20.pdf21 Mar 2025
Layout approvalFile: Layout of all 4 Towers signed final-21-36.pdf21 Mar 2025
Copy of Layout Approval (in case of layout)File: Layout of all 4 Towers signed final-1-4 highlighted.pdf21 Mar 2025
Copy of Layout Approval (in case of layout)File: Layout of all 4 Towers signed final-4-8.pdf21 Mar 2025
Copy of Layout Approval (in case of layout)File: Layout of all 4 Towers signed final-9-20.pdf21 Mar 2025
Copy of Layout Approval (in case of layout)File: Layout of all 4 Towers signed final-21-36.pdf21 Mar 2025
Proforma of Allotment letterFile: MEXTECH - Building No 5 - Allotment.pdf21 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 signed.pdf21 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Query final.pdf21 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 signed.pdf21 Mar 2025
CERSAI detailsFile: CERSAI_Search_Report_200346133222_For_Debtor_Based_Search_21_03_2025_11_53_13_804.pdf21 Mar 2025
Deviation Report with respect to model copy of AgreementFile: Miraya Eternity Deviation Report agreement compressed.pdf21 Mar 2025
Proforma of Agreement for saleFile: Miraya Building No 5 AFS.pdf21 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Anil Mutha - Disclosure of Interest stamped.pdf21 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Hiren Chheda - Disclosure of Interest stamped.pdf21 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Rajesh Patel - Disclosure of Interest stamped.pdf21 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure For SecuredUnsecured Finance Availed For The Project.pdf21 Mar 2025
Building plan approvalFile: CC.pdf20 Mar 2025
PAN CardFile: Mextech Property Developers LLP PAN Card.pdf20 Mar 2025
Copy of the legal title reportFile: Mextech - Title-compressed.pdf20 Mar 2025
Declaration in FORM BFile: Form B Mextech.pdf20 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf20 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: CC.pdf20 Mar 2025
Declaration about Commencement CertificateFile: 22-3-25 Final BUILDING 5 - MIRAYA ETERNITY - Form D CC Decalaration.pdf20 Mar 2025
Deviation Report with respect to Allotment letterFile: Miraya Eternity Deviation Report Allotment.pdf20 Mar 2025

How this compares with Thane

20%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MIRAYA TRINITY - ETERNITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Majiwade7,600+ in Thane

2 kmMIRAYA TRINITY - ETERNITCompleted 168Lapsed / revoked 57Other 142Dot size: filed unitsN

Filed coordinates, straight-line distance. 367 registered projects within 2 km.

Builder: MEXTECH PROPERTY DEVELOPERS LLP

MEXTECH PROPERTY DEVELOPERS LLP has 4 registrations on MahaRERA, including MIRAYA BUSINESS HUB and MIRAYA DIVINE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if MIRAYA TRINITY - ETERNITY is delayed beyond 15 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MIRAYA TRINITY - ETERNITY?

The registered promoter entity is MEXTECH PROPERTY DEVELOPERS LLP, an others as per the filing. Its GSTIN 27ABSFM3880H1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MIRAYA TRINITY - ETERNITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MIRAYA TRINITY - ETERNITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MIRAYA TRINITY - ETERNITY?

The professionals named in the filing: Architect: Suvarna Ghosh; Engineer: Venturx Project Service LLP; Chartered Accountant: KARTIK JAYANTILAL PATEL; Chartered Accountant: VELANI AND POKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MIRAYA TRINITY - ETERNITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MIRAYA TRINITY - ETERNITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MIRAYA TRINITY - ETERNITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.