Home / Browse projects / Mumbai Suburban, Maharashtra / MINT
MINT
RG-MH-06135 · RERA P51800053816 · Last updated on MahaRERA portal: 24 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 5 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MINT is a Commercial project by TULSIANI SUMER ASSOCIATES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800053816 on 1 Dec 2023. Possession is promised by 25 Nov 2026. The completion date has moved by 5 months from the original filing. 22 of the 121 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameMINT
- TypeCommercial
- Location
- SIR MATHURADAS VASANJI ROAD
- SAHAR PLAZA COMPLEX NEXT TO KOHINOOR CONTINENTAL HOTEL
- Kondivita
- Andheri
- Mumbai Suburban
- 400059
- Pincode400059
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800053816
- ReraGenie IDRG-MH-06135
Builder
- NameTULSIANI SUMER ASSOCIATES
- Entity typePartnership
- PartnersMANAKCHAND HAJARIMAL LOONKAR, RAMESH SUMERMAL SHAH, MAHENDRA MANAKCHAND LOONKAR, RAMESH CHANDUMAL TULSIANI, RAGHUVIR SADASHIV KUWELKER, SHRIPAD MUKUND KUVELKER, RANAI MAHENDRA LOONKAR, TULSIANI BUILDER AND TEXTILES PVT LTD REPRESENTED THROUGH RAGHUVIR KUWELKER
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on1 Dec 2023
- Promised completion25 Nov 2026
- Revised completionRevised to 25 Nov 2026 (originally 30 Jun 2026)
- Buildings1 building record
- Documents filed101 files
Current status
Figures as on 24 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING NO 3 WING A | NA | 14 | 10 | 0 | 121 | 121 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 0%.
BUILDING NO 3 WING A: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 24 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed371
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING NO 3 WING A | NA | Rs 196.02 cr | Rs 125.32 cr |
| - | NA | Rs 20.00 cr | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | BREGEES RUSI ITALIA RUSI ITALIA |
| Engineer | KENI & D'SOUZA COUNSULTING CIVIL ENGINEERS RAGHUVIR KENI |
| Engineer | JAYESH D MEHTA DAULATRAI MEHTA |
| Chartered Accountant | NAIK DANAIT & ASSOCIATES |
| Chartered Accountant | S V V & CO |
| Chartered Accountant | Nehali Dhaval Doshi |
| Partner | Role in project |
|---|---|
| TULSIANI SUMER ASSOCIATES | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterOC Recived
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 25 Nov 2026
Documents filed101
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: Form 2A Quality Assurance 31-03-2025.pdf | 24 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A Quality Assurance 31-03-2026.pdf | 24 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 (1).pdf | 16 Jul 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 16 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 (1).pdf | 16 Jul 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 27 Apr 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 27 Apr 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 27 Apr 2026 |
| Withdrawal Update Form 1File: Form1.pdf | 27 Feb 2026 |
| Withdrawal Update Form 2File: Form2.pdf | 27 Feb 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 27 Feb 2026 |
| Withdrawal Update Form 1File: Tsa ReraForm1 Qtr ending.pdf | 15 Dec 2025 |
| Withdrawal Update Form 2File: Tsa ReraForm2 Qtr.pdf | 15 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 Tulsiani Sumer Associates (1).pdf | 15 Dec 2025 |
| Withdrawal Update Form 1File: new form 1.pdf | 21 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf | 21 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 Tulsiani Sumer Associates (1).pdf | 21 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form 5.pdf | 1 Oct 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect.pdf | 14 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA.pdf | 14 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer.pdf | 14 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 13 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 13 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 16 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 16 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 16 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 17 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf | 9 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2.pdf | 9 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3.pdf | 9 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate TSA.pdf | 16 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineers Certificate TSA.pdf | 16 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate TSA.pdf | 16 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate DEC 23.pdf | 15 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate DEC 23.pdf | 15 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate DEC 23.pdf | 15 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: CTS declaration for RERA.pdf | 20 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: No Encumberance - Finance.pdf | 20 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: No Encumberance - Legal.pdf | 20 Nov 2023 |
| Details of encumbrances concerned to LegalFile: CTS declaration for RERA.pdf | 20 Nov 2023 |
| Details of encumbrances concerned to LegalFile: No Encumberance - Finance.pdf | 20 Nov 2023 |
| Details of encumbrances concerned to LegalFile: No Encumberance - Legal.pdf | 20 Nov 2023 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 20 Nov 2023 |
| CERSAI detailsFile: Declaration cersai.pdf | 20 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Form3_17112023.pdf | 20 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Diclosure of Interest - Ranai.pdf | 20 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - Mahendra.pdf | 20 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - Manakchand.pdf | 20 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - Ramesh Shah.pdf | 20 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - RCT.pdf | 20 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - RSK.pdf | 20 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - SMK.pdf | 20 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - TBTL.pdf | 20 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: latest CC.pdf | 3 Nov 2023 |
| Declaration about Commencement CertificateFile: Declaration about CC (Format - D).pdf | 1 Aug 2023 |
| Layout approvalFile: Plan with marking.pdf | 31 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: Plan with marking.pdf | 31 Jul 2023 |
| Declaration in FORM BFile: Form-B Revised.pdf | 31 Jul 2023 |
| CERSAI detailsFile: CTS declaration for RERA.pdf | 28 Jul 2023 |
| Other - LegalFile: CTS declaration for RERA.pdf | 28 Jul 2023 |
| Other - FinanceFile: CTS declaration for RERA.pdf | 28 Jul 2023 |
| Other - TechnicalFile: CTS declaration for RERA.pdf | 28 Jul 2023 |
| Copy of the legal title reportFile: Title Certificate as per RERA format Final 12-07-2023.pdf | 12 Jul 2023 |
| Other - LegalFile: Disclaimer.pdf | 12 Jul 2023 |
| Declaration about Commencement CertificateFile: Declaration about CC (Format - D).pdf | 11 Jul 2023 |
| Proforma of Agreement for saleFile: Agreement for Sale.pdf | 11 Jul 2023 |
| Proforma of Allotment letterFile: Draft Allotment Letter.pdf | 11 Jul 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment letter.pdf | 11 Jul 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report- Agreement for Sale-1.pdf | 11 Jul 2023 |
| Building plan approvalFile: ALL_Part7.pdf | 10 Jul 2023 |
| Building plan approvalFile: ALL_Part8.pdf | 10 Jul 2023 |
| Building plan approvalFile: ALL_Part9.pdf | 10 Jul 2023 |
| Building plan approvalFile: ALL_Part10.pdf | 10 Jul 2023 |
| Building plan approvalFile: ALL_Part2.pdf | 10 Jul 2023 |
| Building plan approvalFile: ALL_Part3.pdf | 10 Jul 2023 |
| Building plan approvalFile: ALL_Part4.pdf | 10 Jul 2023 |
| Building plan approvalFile: ALL_Part5.pdf | 10 Jul 2023 |
| Building plan approvalFile: ALL_Part6.pdf | 10 Jul 2023 |
| Layout approvalFile: Approval letter of Layout 1199.pdf | 10 Jul 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 101 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MINT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SAHAR PLAZA COMPLEX NEXT TO KOHINOOR CONTINENTAL HOTEL6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 238 registered projects within 2 km.
SKYLINE BUSINESS WORLD WING C
Skyline Prashasti
NAMAN PREMIER
SHREE NAMAN DEVELOPERS PVT LTD
I STAY TOWER K (STUDIO)
I-STAY HOUSING PRIVATE LIMITED
CHANDAK SARVAM
CHANDAK REALTORS PRIVATE LIMITED
TRILIVE MAROL TOWER B
I-STAY HOUSING PRIVATE LIMITED
TBC Marol Phase 1
AGATE REALTORS AND DEVELOPERS
See every Mumbai Suburban project, with the district possession charts
Builder: TULSIANI SUMER ASSOCIATES
TULSIANI SUMER ASSOCIATES has 1 registration on MahaRERA, including MINT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if MINT is delayed beyond 25 Nov 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MINT?
The registered promoter entity is TULSIANI SUMER ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MINT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MINT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MINT?
The professionals named in the filing: Architect: BREGEES RUSI ITALIA RUSI ITALIA; Engineer: KENI & D'SOUZA COUNSULTING CIVIL ENGINEERS RAGHUVIR KENI; Engineer: JAYESH D MEHTA DAULATRAI MEHTA; Chartered Accountant: NAIK DANAIT & ASSOCIATES; Chartered Accountant: S V V & CO; Chartered Accountant: Nehali Dhaval Doshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MINT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback