Home / Browse projects / Pune, Maharashtra / MIHIR AMARA PHASE II

Registered No litigation declared Residential / Group Housing project

MIHIR AMARA PHASE II

By Mihir Homes Realty

RG-MH-43241 · RERA P52100050458 · Last updated on MahaRERA portal: 17 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
12 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 90%
13 of 172Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

MIHIR AMARA PHASE II is a Residential / Group Housing project by Mihir Homes Realty in Pune, Maharashtra, registered with MahaRERA as P52100050458 on 17 Apr 2023. Possession is promised by 31 Dec 2026. 159 of the 172 units on this registration are recorded sold or booked, and 12 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMIHIR AMARA PHASE II
  • TypeResidential / Group Housing
  • Location
    • Pune Mumbai Highway
    • Wakad
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • RERA no.P52100050458
  • ReraGenie IDRG-MH-43241

Builder

  • NameMihir Homes Realty
  • Entity typePartnership
  • PartnersMahendra Fakirchand Sabadra, Amit Suganchand Sancheti, Sharmila Mahendra Sabadra, Kiran Amit Sancheti, Mihir Mahendra Sabadra, Vedant Mahendra Sabadra
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Apr 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed79 files

Current status

92%159 of 172 units booked
90.0%Work done, per cost certificate

Figures as on 17 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building - A1NA262496096
Building - A2NA211976076

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 90%.

Building - A188%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Building - A288%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 17 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes50%
Street LightingYes25%
Community BuildingsYes50%
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntYes70%
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes50%
Open ParkingYes0%

Parking filed172

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots172
Closed/Covered172
BuildingClosed/CoveredTotal
Building - A19696
Building - A27676

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,004 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Mihir ProjectsPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri-Chinchwad Municipal Corporation
Permissible FSI37054.0
Proposed, not sanctioned17,774 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBhandarkar Road, Pune
Estimated costRs 70.00 cr
Cost incurredRs 63.00 cr
Work done90.0%
BuildingWingEstimatedIncurred
Building - A1NARs 34.00 crRs 31.50 cr
Building - A2NARs 34.00 crRs 31.50 cr
-NARs 2.00 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAmit Bhat Architects
EngineerSatish Marathe Consulting Engineers
EngineerSuraaj Kathale
Chartered AccountantAshish Rathi & Co.
PartnerRole in project
Mihir Homes Realty-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12603150Mihir Homes RealtyHarsh Harsukhkumar Vegada27/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Phase 2 Form 1 Jun25.pdf17 Jun 2026
Withdrawal Update Form 1File: Phase 2 Form 1 Sep25.pdf17 Jun 2026
Withdrawal Update Form 1File: Phase 2 Form 1 Dec25.pdf17 Jun 2026
Withdrawal Update Form 1File: Phase 2 Form 1 Mar26.pdf17 Jun 2026
Withdrawal Update Form 2File: Phase 2 Form 2 Jun25.pdf17 Jun 2026
Withdrawal Update Form 2File: Phase 2 Form 2 Sep25.pdf17 Jun 2026
Withdrawal Update Form 2File: Phase 2 Form 2 Dec25.pdf17 Jun 2026
Withdrawal Update Form 2File: Phase 2 Form 2 Mar26.pdf17 Jun 2026
Withdrawal Update Form 3File: Form-3- MIHIR AMARA PHASE 2 June 25.pdf17 Jun 2026
Withdrawal Update Form 3File: Form-3- MIHIR AMARA PHASE 2 June 25.pdf17 Jun 2026
Withdrawal Update Form 3File: Form-3- MIHIR AMARA PHASE 2 Dec 25.pdf17 Jun 2026
Withdrawal Update Form 3File: ARCO- Form 3 MIHIR AMARA PHASE 2.pdf17 Jun 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Jun 23.pdf22 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sep 23.pdf22 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dec 23.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jun 23.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sep 23.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Dec 23.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jun 23.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sep 23.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dec 23.pdf22 Feb 2024
Building plan approvalFile: A9RB4BD 1.pdf21 Sep 2023
Building plan approvalFile: A9RB4BD 1.pdf21 Sep 2023
Building plan approvalFile: A9RB4BD 2.pdf21 Sep 2023
Building plan approvalFile: A9RB4BD 3.pdf21 Sep 2023
Building plan approvalFile: A9RB4BD 4.pdf21 Sep 2023
Building plan approvalFile: A9RB4BD 5.pdf21 Sep 2023
Building plan approvalFile: A9RB4BD 6.pdf21 Sep 2023
Building plan approvalFile: A9RB4BD 7.pdf21 Sep 2023
Building plan approvalFile: A9RB4BD 8.pdf21 Sep 2023
Building plan approvalFile: A9RB4BD 9.pdf21 Sep 2023
Building plan approvalFile: A9RB4BD 10.pdf21 Sep 2023
Building plan approvalFile: A9RB4BD 11.pdf21 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: A9RB4BD 1.pdf21 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: A9RB4BD 1.pdf21 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: A9RB4BD 2.pdf21 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: A9RB4BD 3.pdf21 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: A9RB4BD 4.pdf21 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: A9RB4BD 5.pdf21 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: A9RB4BD 6.pdf21 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: A9RB4BD 7.pdf21 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: A9RB4BD 8.pdf21 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: A9RB4BD 9.pdf21 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: A9RB4BD 10.pdf21 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: A9RB4BD 11.pdf21 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: lgl 1-merged-compressed.pdf21 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf9 Mar 2023
Declaration about Commencement CertificateFile: Format D.pdf9 Mar 2023
Declaration in FORM BFile: Form B.pdf9 Mar 2023
Building plan approvalFile: Ground Floor Plan.pdf3 Mar 2023
Building plan approvalFile: Podium 1 Floor Plan.pdf3 Mar 2023
Building plan approvalFile: Podium 2 Floor Plan.pdf3 Mar 2023
Building plan approvalFile: IOD Plan_compressed.pdf3 Mar 2023
Building plan approvalFile: 0_Building Plan.pdf3 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD Plan_compressed.pdf3 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 0_Building Plan.pdf3 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Ground Floor Plan.pdf3 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Podium 1 Floor Plan.pdf3 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Podium 2 Floor Plan.pdf3 Mar 2023
Copy of the legal title reportFile: 0_fINAL RERA TITLE SEARCH REPORT.pdf24 Feb 2023
Copy of the legal title reportFile: 0_Title Search 03022023 new_compressed.pdf24 Feb 2023
Details of encumbrances concerned to FinanceFile: 0_financial encumberance.pdf23 Feb 2023
Details of encumbrances concerned to LegalFile: 0_financial encumberance.pdf23 Feb 2023
CERSAI detailsFile: CERSAI_Search_Report_new.pdf16 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Amit Sancheti.pdf16 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Kiran Sancheti.pdf16 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Shubham Sancheti.pdf16 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Sabadra Family_compressed.pdf16 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: MIHIR Bank account.pdf16 Feb 2023
Layout approvalFile: Layout.pdf28 Nov 2022
PAN CardFile: PAN Card.pdf28 Nov 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.pdf28 Nov 2022
Details of encumbrances concerned to LegalFile: Encumbrance Certificate.pdf28 Nov 2022
Copy of Layout Approval (in case of layout)File: Layout.pdf28 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf28 Nov 2022
Proforma of Allotment letterFile: Allotment Letter.pdf28 Nov 2022
Proforma of Agreement for saleFile: Sample Agreement.pdf28 Nov 2022
Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment Letter.pdf28 Nov 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report - Agreement.pdf28 Nov 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
Wakad Business BayP52100021744Behind Tip Top International Hotel, PuneJul 2019CompletedDec 2023Dec 2023

How this compares with Pune

92%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MIHIR AMARA PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wakad13,700+ in Pune

Builder: Mihir Homes Realty

Mihir Homes Realty has 1 registration on MahaRERA, including MIHIR AMARA PHASE II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MIHIR AMARA PHASE II is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MIHIR AMARA PHASE II?

The registered promoter entity is Mihir Homes Realty, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MIHIR AMARA PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MIHIR AMARA PHASE II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MIHIR AMARA PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MIHIR AMARA PHASE II?

The professionals named in the filing: Architect: Amit Bhat Architects; Engineer: Satish Marathe Consulting Engineers; Engineer: Suraaj Kathale; Chartered Accountant: Ashish Rathi & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MIHIR AMARA PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MIHIR AMARA PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MIHIR AMARA PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.