ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / MIDTOWN SQUARE - PHASE II

De-registered No litigation declared Mixed project

MIDTOWN SQUARE - PHASE II

By LOTUS EMPIRE

RG-MH-46664 · RERA P51700019425 · Last updated on MahaRERA portal: 27 Jun 2023

Source: official MahaRERA filing

Red flags

  • De-registered
  • Possession 43 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2023Possession promised43 months past this date
0 of 11Construction stages donefurthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 56 documents Report an error

MIDTOWN SQUARE - PHASE II is a Mixed project by LOTUS EMPIRE in Thane, Maharashtra, registered with MahaRERA as P51700019425 on 29 Jan 2019. Possession was promised by 30 Mar 2023 and is now 43 months past that date.

At a glance

Project

  • NameMIDTOWN SQUARE - PHASE II
  • TypeMixed
  • Location
    • MAHARASHTRA
    • OPP ORDNANCE FACTORY
    • Ambarnath(M Cl)
    • Ambarnath
    • Thane
    • 421501
  • Pincode421501
  • RERA no.P51700019425
  • ReraGenie IDRG-MH-46664

Builder

  • NameLOTUS EMPIRE
  • Entity typePartnership
  • PartnersKISHORE NANDLAL VALECHA, AMAR JAWAHARSINGH HEERA, SHANKER PANJUMAL SONEJA, ANIL SHANKER SONEJA, KAMLESH ARJANDAS GALANI, NITIN GURBUX SUNDRANI, SANJAY PRATAPRAY MANUJA, JAIRAMDAS SANTUMAL GURDASANI, NAND RAMCHAND JETHANI, PRAKASH TILUMAL SACHANANDANI, MURLI TILUMAL SACHANANDANI, RAJESH TILUMAL SACHANANDANI and 6 more
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

43 months past promisethis monthRegisteredJan 2019PromisedMar 2023

Key facts

Registration and timeline

  • StatusDe-registered
  • Registered on29 Jan 2019
  • Promised completion30 Mar 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed56 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1/3NA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

A1/3: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed45

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots45
Open Space45

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,300 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6128.92
Proposed, not sanctioned4,062 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, HOTEL EAGLE, ULHASNAGAR - 421003

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAJESH THAKARE AND ASSOCIATES
EngineerKHASNIS AND ASSOCIATES
Chartered AccountantK R MAKHIJA & ASSOCIATES
PartnerRole in project
LOTUS EMPIRE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jan 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jan 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jan 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jan 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed56

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Latest Fom 1.pdf27 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Latest Form 2.pdf27 Jun 2023
Certificates of CA (Form 3)File: Latest Form 3.pdf27 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 30-06-22 (Phase-II).pdf27 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 30-09-22 (Phase-II).pdf27 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 31-12-22 (Phase-II).pdf27 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 31-12-22 (Phase-II).pdf27 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-2 31-03-22 (Phase-II).pdf12 Jan 2023
Certificates of CA (Form 3)File: RERA Phase II FORM 3 31st Mar 22_11zon.pdf2 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RERA Phase II FORM 5 (31-3-2021)_11zon.pdf2 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA Phase II FORM 5 (31-3-2022)_11zon.pdf2 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)-compressed.pdf16 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)-compressed.pdf16 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)-compressed.pdf16 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)-compressed.pdf16 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)-compressed.pdf16 Oct 2021
Certificates of CA (Form 3)File: Form 3 31st Mar 2021.pdf9 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE PHASE II compressed.pdf4 May 2021
Certificates of CA (Form 3)File: Form 3 - (Dec 20) - Phase II_compressed.pdf23 Apr 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Phase II , Form-5.pdf7 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Architect Certificate Phase II_Compress.pdf5 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Architect Certificate Phase II_compress.pdf5 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Architect Certificate Phase II_compress.pdf5 Dec 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE PHASE-2_MAR 2020.pdf1 Dec 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE PHASE-2_JUNE 2020.pdf1 Dec 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE PHASE-2_SEPT 2020.pdf1 Dec 2020
Certificates of CA (Form 3)File: Form-3 alongwith Annexure A_compressed.pdf28 Nov 2020
Certificates of CA (Form 3)File: Form-3 with Annexure A (Mar 20)_COMPRESSED.pdf27 Nov 2020
Certificates of CA (Form 3)File: Final Form-3 Alongwith Annexure A (Jun 20)_compressed.pdf27 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert_PHASE-II_Dec-2019_compressed.pdf23 Oct 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Phase II_Dec-19.pdf23 Oct 2020
Certificates of CA (Form 3)File: Form 3_Phase II_Dec-19_compressed.pdf23 Oct 2020
Certificates of CA (Form 3)File: FORM-3_Phase II_June30,2019_compressed.pdf5 Feb 2020
Certificates of CA (Form 3)File: Form-3_Phase II Sept 30,2019_compressed.pdf5 Feb 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_PHASE II - MAR 2019_compressed.pdf9 Jan 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_PHASE II - JUNE 2019_compressed.pdf9 Jan 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_PHASE II - SEPT 2019_compressed.pdf9 Jan 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_PHASE II - JUNE 2019_compressed.pdf9 Jan 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_PHASE II - SEPT 2019_compressed.pdf9 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on March 31 2019_compressed.pdf24 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on June 30 2019_compressed.pdf24 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on Sept 30 2019 (Phase II)_compressed.pdf24 Dec 2019
Certificates of CA (Form 3)File: Form 3 as on March 31 2019_compressed.pdf24 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM-5 (Phase II)_compressed.pdf24 Dec 2019
Proforma of Allotment letterFile: Allotment Letter.pdf21 Jan 2019
Layout approvalFile: PLAN COPY.pdf19 Jan 2019
Details of encumbrancesFile: NO ENCUMBRANCE CERTIFICATE.pdf19 Jan 2019
Copy of Layout Approval (in case of layout)File: PLAN COPY.pdf19 Jan 2019
Commencement Certificates / NA Order for plotted developmentFile: MIDC APPROVAL.pdf19 Jan 2019
Building plan approvalFile: IOD.pdf18 Jan 2019
PAN CardFile: PAN CARD.pdf18 Jan 2019
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf18 Jan 2019
Building Plan Approval (IOD)File: IOD.pdf18 Jan 2019
Declaration in FORM BFile: Form B_PII-compressed.pdf18 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_PII-ilovepdf-compressed.pdf18 Jan 2019
Certificates of CA (Form 3)File: CA Certificate Form III-ilovepdf-compressed.pdf18 Jan 2019

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MIDTOWN SQUARE - PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OPP ORDNANCE FACTORY7,600+ in Thane

Builder: LOTUS EMPIRE

LOTUS EMPIRE has 2 registrations on MahaRERA, including MIDTOWN SQUARE - PHASE I and MIDTOWN SQUARE - PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that MIDTOWN SQUARE - PHASE II shows as de-registered on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if MIDTOWN SQUARE - PHASE II is delayed beyond 30 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MIDTOWN SQUARE - PHASE II?

The registered promoter entity is LOTUS EMPIRE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MIDTOWN SQUARE - PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MIDTOWN SQUARE - PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MIDTOWN SQUARE - PHASE II?

The professionals named in the filing: Architect: RAJESH THAKARE AND ASSOCIATES; Engineer: KHASNIS AND ASSOCIATES; Chartered Accountant: K R MAKHIJA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MIDTOWN SQUARE - PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MIDTOWN SQUARE - PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MIDTOWN SQUARE - PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.