Registration lapsed No litigation declared Residential / Group Housing project

MIDAS-BHAKTI MEADOWS

By IRENE EDWYN DMELLO

RG-MH-57819 · RERA P51800013457 · Last updated on MahaRERA portal: 25 Jul 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 5 months past the filed date
  • 16 complaints at MahaRERA
  • Completion date moved by 83 months
  • 7 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
May 2026Possession promised5 months past this date
6 of 11Construction stages donefurthest along: Internal walls, 80%
7 of 78Units unsoldnot recorded sold or booked
16Complaints at MahaRERAon this registration
Jump to the 141 documents Report an error

MIDAS-BHAKTI MEADOWS is a Residential / Group Housing project by IRENE EDWYN DMELLO in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800013457 on 7 Oct 2017. Possession was promised by 31 May 2026 and is now 5 months past that date. The completion date has moved by 83 months from the original filing. 71 of the 78 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 16 complaints are on record with the regulator.

At a glance

Project

  • NameMIDAS-BHAKTI MEADOWS
  • TypeResidential / Group Housing
  • Location
    • Chembur
    • Kurla
    • Mumbai Suburban
    • 400089
  • Pincode400089
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800013457
  • ReraGenie IDRG-MH-57819

Builder

  • NameIRENE EDWYN DMELLO
  • Entity typeIndividual
  • GSTIN27ABZPD4177F1Z9

Key dates

5 months past promisethis monthRegisteredOct 2017First promiseJun 2019Revised toMay 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on7 Oct 2017
  • Promised completion31 May 2026
  • Revised completionRevised to 31 May 2026 (originally 30 Jun 2019)
  • Buildings1 building record
  • Documents filed141 files

Current status

91%71 of 78 units booked
95.7%Work done, per cost certificate

Figures as on 25 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MIDAS-BHAKTI MEADOWSNA151378078

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

MIDAS-BHAKTI MEADOWS: 76% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 25 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,358 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Declared on18 Sep 2024
LandownerVillageDistrict
Navin Ramji KothariMulundMumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI9401.0
Proposed, not sanctioned3,815 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMULUND WEST MUMBAI MAHARASHTRA 400080
Estimated costRs 20.19 cr
Cost incurredRs 19.31 cr
Work done95.69%
BuildingWingEstimatedIncurred
MIDAS-BHAKTI MEADOWSNARs 19.18 crRs 19.18 cr
-NARs 1.01 crRs 13.88 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSNS Architects
EngineerSK Consultants & Engineers
EngineerShriprakash Singh
Chartered AccountantVikas Abhang & Associates
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantNB Sayed & Associates
Chartered AccountantPranav Bhaskaran
PartnerRole in project
IRENE EDWYN DMELLO-

Extensions applied for7

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800008465Jun 2019 → Oct 2021

Reason as filed by the promoterHardships in Building Industry. Delay in approvals due to policy decisions. FINANCIAL DIFFICULTIES.

EXT51800009715Jun 2019 → May 2022

Reason as filed by the promoterRespected Sir/Madam, Request to kindly consider accepting the Resolution / Consent for Extension uploaded in November 2020, as Stop-work Notice was issued to us in the same month, now as the lock-down situation still persists and the flat purchasers are not accessible, as they are residing in different far flung areas in Maharashtra and also many are senior citizens, who are in home quarantine. Hope you will positively consider the present difficult conditions faced and issue the Time Extension applied till 31.05.2022 at the earliest. We have uploaded scanned copies of stop-work notice dated 0

EXT51800012989Jun 2019 → Sep 2024

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 55.32% allottees for purpose of extension of RERA registration period of the said project.

EXT51800024675Jun 2019 → Sep 2025

Reason as filed by the promoterAs per Order No. 40 Dated 27/12/2022 we are applying for Extension without majority consents of the allottees

EA30092517990Jun 2019 → Dec 2025

Reason as filed by the promoterWe regret the delay in the completion of the project and in submitting this request. The timeline was impacted by a combination of factors beyond our control, including delays in securing requisite permissions from the concerned authorities, logistical challenges in procurement, financial limitations, and on-ground execution hurdles.

EA31122519184Jun 2019 → Mar 2026

Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, financial constraints, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work.

EA03042620542Jun 2019 → May 2026

Reason as filed by the promoterAt the outset, we sincerely regret the delay in completion of the project as well as the delay in submission of the present request for extension. The delay has occurred due to certain unforeseen and unavoidable circumstances beyond the reasonable control of the Promoter. These include, inter alia, disruptions in procurement of construction materials, financial constraints arising during the course of execution, and site-related challenges which impacted the progress of construction. Collectively, these factors adversely affected the planned construction schedule and resulted in a delay in ach

Complaints filed with MahaRERA16

Case no.ComplainantRespondentFiled
CC006000000001616Bhupendra KapasiIrene Edwyn Dmello31/10/2017
CC006000000090048GUL SHYAMDAS TOTLANINAVINBHAI RAMJI KOTHARI10/07/2019
CC006000000171690KETAN KANAIYALAL MEHTANAVIN RAMJI KOTHARI27/11/2019
CC006000000171764Dinesh Khimji BahuvaNavin Ramjibhai Kothari04/12/2019
CC006000000182085Ramesh Gangabhai Devda and Ganga Ramesh DevdaIrene Edwyn Dmello proprietor of M/s. Midas Builders07/01/2020
CC006000000182090Hirji Kanjibhai Barwadia and Badhi Hirji BarwadiaIrene Edwyn Dmello properitor of M/s. Midas Builder07/01/2020
CC006000000193738Manoj Kishanchand PanjabiIrene Edwyn Dmello Proprietor of M/s. Midas Builders17/08/2020
CC006000000193761Mohit Sunil MakhijaIrene Edwyn Dmello Proprietor of M/s. Midas Builders19/08/2020
CC006000000193762Kanayalal Premchand Makhija Karta of Kanayala P. Makhija Hindu Undivided FamilyIrene Edwyn Dmello Proprietor of M/s. Midas Builder19/08/2020
CC006000000193763Megha Ashish NainaniIrene Edwyn Dmello Proprietor of M/s. Midas Builders19/08/2020
CC006000000198829DASHRAJ E MODAKMIDAS BHAKTI MEADOWS29/10/2021
CC006000000375266Maheshbhai Popatbhai BhuvaN R CORPORATION AND MIDAS BUIDERS14/04/2023
CC12601213Maheshbhai Popatbhai BhuvaIRENE EDWYN DMELLO06/03/2026
CC12601226Maheshbhai Popatbhai BhuvaIRENE EDWYN DMELLO06/03/2026
CC12602849Rajpal Shyamlal SinghIRENE EDWYN DMELLO15/05/2026
CC12602852Rajpal Shyamlal SinghIRENE EDWYN DMELLO15/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Sep 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed141

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 141 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Midas-Bhakti Meadows_Form1_June 2026.pdf25 Jul 2026
Withdrawal Update Form 2File: Midas-Bhakti_Meadows_Form2_Q1_2026-27_25-07-2026_11-56.pdf25 Jul 2026
Withdrawal Update Form 3File: Midas-Bhakti_Meadows_Form3_Q1_2026-27_21-07-2026_13-01_doc1.pdf25 Jul 2026
Withdrawal Update Form 1File: Form 1 - Midas Bhakti Meadows as on March 2026 (Signed).pdf3 Apr 2026
Withdrawal Update Form 2File: Form 2 - Midas Bhakti Meadows as on March 2026 (Signed).pdf3 Apr 2026
Withdrawal Update Form 3File: Form 3 - Midas Bhakti Meadows as on March 2026 (Signed).pdf3 Apr 2026
Withdrawal Update Form 1File: Form 1 - Midas Bhakti Meadows as on Dec 2025.pdf21 Jan 2026
Withdrawal Update Form 2File: Form 2 - Midas Bhakti Meadows as on Dec 2025.pdf21 Jan 2026
Withdrawal Update Form 3File: Form 3 - Midas Bhakti Meadows as on Dec 2025.pdf21 Jan 2026
Withdrawal Update Form 1File: Form 1- Midas Bhakti Meadows as on Sep 2025.pdf10 Oct 2025
Withdrawal Update Form 2File: Form 2 - Midas Bhakti Meadows as on Sep 2025.pdf10 Oct 2025
Withdrawal Update Form 3File: Form 3 - Midas Bhakti Meadows as on Sep 2025.pdf10 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 - Midas Bhakti Meadows For FY 2024-25.pdf4 Oct 2025
Withdrawal Update Form 1File: Form 1- Midas Bhakti Meadows as on June 2025.pdf30 Sep 2025
Withdrawal Update Form 1File: Form 1- Midas Bhakti Meadows as on June 2025.pdf30 Sep 2025
Withdrawal Update Form 2File: Form 2 - Midas Bhakti Meadows as on June 2025.pdf30 Sep 2025
Withdrawal Update Form 2File: Form 2 - Midas Bhakti Meadows as on June 2025.pdf30 Sep 2025
Withdrawal Update Form 3File: Form 3 - Midas Bhakti meadows as june 2025.pdf30 Sep 2025
Withdrawal Update Form 3File: Form 3 - Midas Bhakti meadows as june 2025.pdf30 Sep 2025
Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf30 Sep 2025
Form 1File: Form 1- Midas Bhakti Meadows as on June 2025.pdf18 Jul 2025
Form 2File: Form 2 - Midas Bhakti Meadows as on June 2025.pdf18 Jul 2025
Form 3File: Form 3 - Midas Bhakti Meadows as on June 2025.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Midas Bhakti Meadows as on June 2025.pdf18 Jul 2025
Certificates of CA (Form 3)File: Form 3 - Midas Bhakti Meadows as on March 2025.pdf8 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Midas Bhakti Meadows as on March 2025.pdf8 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Midas Bhakti Meadows as on March 2025.pdf2 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Midas Bhakti Meadows as on December 2024.pdf13 Feb 2025
Layout approvalFile: 202408201640.pdf15 Jan 2025
Building plan approvalFile: Plans.pdf15 Jan 2025
Copy of Layout Approval (in case of layout)File: 202408201640.pdf15 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (Dec 2024).pdf15 Jan 2025
Certificates of CA (Form 3)File: Form 3 (Dec 2024)_11zon (1).pdf15 Jan 2025
Certificates of CA (Form 3)File: Form 3 (Dec 2024)_11zon.pdf15 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 (Dec 2024).pdf15 Jan 2025
Building Plan Approval (IOD)File: Plans.pdf15 Jan 2025
Disclosure of sold/ booked inventoryFile: Circular 29 (Dec 2024).pdf15 Jan 2025
Disclosure of sold/ booked inventoryFile: Circular 29 (Dec 2024)_organized.pdf15 Jan 2025
Declaration about Commencement CertificateFile: Format D.pdf15 Jan 2025
Certificates of CA (Form 3)File: Form 3 - Midas Bhakti Meadows as on December 2024.pdf10 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Midas Bhakti Meadows as on December 2024.pdf10 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Annexure-G1-CC 2024.pdf7 Dec 2024
Disclosure of sold/ booked inventoryFile: f.pdf30 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5- 17-18.pdf29 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A- 2019-20.pdf29 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5- 18-19.pdf29 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5- 19-20.pdf29 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5- 20-21.pdf29 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A- 2020-21 (1).pdf29 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5- 21-22.pdf29 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A- 2021-22.pdf29 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- 2022-23 (2).pdf29 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- 22-23.pdf29 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sept 2024.pdf25 Oct 2024
Certificates of CA (Form 3)File: Form 3_compressed.pdf25 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf25 Oct 2024
Certificates of CA (Form 3)File: Form-3 June 24_compressed (1).pdf18 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 June 24.pdf18 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24_compressed.pdf18 Oct 2024
Certificates of CA (Form 3)File: Form 3- Midas Bhakti Meadows as on 30-09-2024.pdf17 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Midas Bhakti Meadows as on Sept 2024.pdf17 Oct 2024
Declaration in FORM BFile: Form-B.pdf7 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 June 24.pdf7 Oct 2024
Certificates of CA (Form 3)File: Form-3 June 24_compressed.pdf7 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 June 24.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: Circular 29.pdf7 Oct 2024
CERSAI detailsFile: Cersai Declaration.pdf7 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf7 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure-A.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24 (1).pdf7 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Midas Bhakti Meadows as on June 2024.pdf13 Jul 2024
Certificates of CA (Form 3)File: Form 3 - Midas Bhakti Meadows as on June 2024.pdf13 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SNS Form 1 RER.pdf4 Jul 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Midas Bhakti.pdf23 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Midas Bhakti for FY 2022-23.pdf2 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Midas Bhakti as on March 2024.pdf10 Apr 2024
Certificates of CA (Form 3)File: Form 3 - Midas Bhakti as on March 2024.pdf10 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1.pdf4 Apr 2024
Certificates of CA (Form 3)File: Form 3 - Midas Bhakti as on 29-02-2024.pdf1 Apr 2024
Disclosure of sold/ booked inventoryFile: Circular 29 -Midas Bhakti as on Dec 2023.pdf11 Jan 2024

How this compares with Mumbai Suburban

91%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 83 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MIDAS-BHAKTI MEADOWS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chembur6,700+ in Mumbai Suburban

2 kmMIDAS-BHAKTI MEADOWSCompleted 200Lapsed / revoked 156Other 203Dot size: filed unitsN

Filed coordinates, straight-line distance. 559 registered projects within 2 km.

Builder: IRENE EDWYN DMELLO

IRENE EDWYN DMELLO has 1 registration on MahaRERA, including MIDAS-BHAKTI MEADOWS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that MIDAS-BHAKTI MEADOWS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if MIDAS-BHAKTI MEADOWS is delayed beyond 31 May 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MIDAS-BHAKTI MEADOWS?

The registered promoter entity is IRENE EDWYN DMELLO, an individual as per the filing. Its GSTIN 27ABZPD4177F1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MIDAS-BHAKTI MEADOWS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MIDAS-BHAKTI MEADOWS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MIDAS-BHAKTI MEADOWS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MIDAS-BHAKTI MEADOWS?

The professionals named in the filing: Architect: SNS Architects; Engineer: SK Consultants & Engineers; Engineer: Shriprakash Singh; Chartered Accountant: Vikas Abhang & Associates; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MIDAS-BHAKTI MEADOWS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MIDAS-BHAKTI MEADOWS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MIDAS-BHAKTI MEADOWS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.