METRO PRIDE

By Gaurivinayak Builders and Developers Pvt Ltd

RG-MH-78243 · RERA P51700052871 · Last updated on MahaRERA portal: 5 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 11 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 19%
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

METRO PRIDE is a Others project by Gaurivinayak Builders and Developers Pvt Ltd in Thane, Maharashtra, registered with MahaRERA as P51700052871 on 5 Oct 2023. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NameMETRO PRIDE
  • TypeOthers
  • Location
    • KACHORE GAON
    • KALYAN
    • KACHORE
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700052871
  • ReraGenie IDRG-MH-78243

Builder

  • NameGaurivinayak Builders and Developers Pvt Ltd
  • Entity typeCompany
  • Managing DirectorSANJAY ANANTA GAIKWAD
  • Other registrations11 more →
  • Completed2 of 12
  • No longer live6 lapsed, de-registered or revoked
  • Declared earlier projects9 →

Key dates

this monthRegisteredOct 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Oct 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KASHISH SKYLARKNA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 19%.

KASHISH SKYLARK: 20% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)1%
Podiums (if any)0%
Plinth1%
Stilt Floor100%
Slabs of Super Structure19%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed212

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots212
Open Space212

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,360 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
BABIBAI D BHOIRKACHOREThane
DEVANAND A GAIKWADTisgaonThane
MM DREAMZ (LLP)Thane (M Corp.)Thane

Approvals and building plan

Permissible FSI9269.58
Proposed, not sanctioned9,270 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPOONA LINK ROAD KALYAN E

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTUSHAR DILIP TENDOLKAR
EngineerRajesh thakre & associates
Chartered AccountantGayakwad & Arracken
PartnerRole in project
Gauri Vinayak Builder and Developers Pvt Ltd-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form-2a.pdf5 Jun 2026
Form 2A (FY 2024-2025)File: form 2A metro pride.pdf5 Jun 2026
Form 1File: Form-1.pdf9 May 2026
Form 2File: Form-2.pdf9 May 2026
Form 3File: FORM 03 METRO PRIDE MARCH 2026.pdf9 May 2026
Disclosure of Sold and Booked InventoryFile: METRO PRIDE SOLD UNSOLD DISCLOUSERED MARCH 2026.pdf9 May 2026
Form 1File: Form 1.pdf28 Jan 2026
Form 2File: Form 2.pdf28 Jan 2026
Form 3File: RERA FORM NO 3.pdf28 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOUSER _ METRO PRIDE.pdf28 Jan 2026
Form 1File: metro Pride form-1.pdf19 Dec 2025
Form 2File: Form2 metro Pride.pdf19 Dec 2025
Form 3File: GAURIVINAYAK BUILDERS METRO PRIDE FORM 3 30-06-2025.pdf19 Dec 2025
Disclosure of Sold and Booked InventoryFile: GAURIVINAYAK BUILDERS METRO PRIDE SOLD UNSOLD 30-06-2025.pdf19 Dec 2025
Form 1File: FORM-1 SEP-25.pdf19 Dec 2025
Form 2File: FORM-2 SEP-25.pdf19 Dec 2025
Form 3File: GAURIVINAYAK BUILDERS METRO PRIDE FORM 3 30-09-2025.pdf19 Dec 2025
Disclosure of Sold and Booked InventoryFile: GAURIVINAYAK BUILDERS METRO PRIDE SOLD UNSOLD 30-09-2025.pdf19 Dec 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: GAURIVINAYAK METRO PRIDE FORM-5 23-05-2025.pdf26 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GAURIVINAYAK METRO PRIDE FORM 3 31-03-2025.pdf13 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -01 METRO PRIDE.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 metro pride.pdf30 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A metro pride.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GAURIVINAYAK FORM-1 METRO PRIDE 31-12-2024.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-02 METRO PRIDE.pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GAURIVINAYK METRO PRIDE 31-12-2024.pdf25 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: GAURIVINAYAK BUILDERS AND DEVOLOPERPS PVT LTD ANNEXURE F FORM 5.pdf10 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: METRO PRIDE FORM 1 SEPT END 2024.pdf26 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: METRO PRIDE 30-09-2024 GAURIVINAYAK.pdf26 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: METRO PRIDE FORM 2 SEPT END 2024.pdf26 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 2024.pdf17 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 metro.pdf17 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GAURIVINAYAK METRO PRIDE.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf6 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf6 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf6 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mar 24 GAURIVINAYAK METRO PRIDE.pdf6 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK AC.pdf9 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2023.pdf21 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 DEC 2023.pdf21 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GAURIVINAYAK BULDERS DEVELOPERS PVT LTD METRO PRIDE.pdf21 Feb 2024
Deviation Report with respect to model copy of AgreementFile: MM DREAMZ LLP.pdf2 Dec 2023
Proforma of Agreement for saleFile: MMDREAMZ Rera Agreement.pdf23 Oct 2023
Layout approvalFile: Plan Copy (2) (1).pdf19 Oct 2023
Building plan approvalFile: Plan Copy (1).pdf19 Oct 2023
Copy of the legal title reportFile: Title Report (1) (1).pdf19 Oct 2023
Copy of Layout Approval (in case of layout)File: Plan Copy (2) (1).pdf19 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan Copy (1).pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KASHISH skylark 3.pdf25 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK AC DECL.pdf24 May 2023
Proforma of Agreement for saleFile: DRAFT AGG NW GAURIVINAYAK PVT LTD.pdf13 Mar 2023
Deviation Report with respect to model copy of AgreementFile: deveation aggrement.pdf13 Mar 2023
Declaration about Commencement CertificateFile: DECL CC SKY.pdf23 Feb 2023
Copy of the legal title reportFile: legal sky.pdf20 Feb 2023
Details of encumbrances concerned to FinanceFile: No encum Finance new.pdf19 Jan 2023
Details of encumbrances concerned to LegalFile: No encum Finance new.pdf19 Jan 2023
CERSAI detailsFile: CERSAI new.pdf19 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Order No 39 sanjay.pdf19 Jan 2023
Layout approvalFile: LAYOUT.pdf11 Jan 2023
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf11 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gauri Vinayak.pdf11 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Order No 39.pdf7 Jan 2023
Proforma of Allotment letterFile: SKY LARK ALLOTMENT new.pdf7 Jan 2023
Building plan approvalFile: plan sky.pdf3 Jan 2023
Details of encumbrances concerned to FinanceFile: No encum Finance.pdf3 Jan 2023
Details of encumbrances concerned to LegalFile: No encum Finance.pdf3 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: plan sky.pdf3 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: TASHILDAR CC.pdf3 Jan 2023
Declaration in FORM BFile: Form B Affidavit cum Declaration.pdf3 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Dilip Tambday.pdf3 Jan 2023
Deviation Report with respect to Allotment letterFile: deveation allotment.pdf3 Jan 2023
PAN CardFile: 1 PAN Card (1).pdf2 Jan 2023
Details of encumbrances concerned to FinanceFile: no encumberance legal skylark.pdf2 Jan 2023
Details of encumbrances concerned to LegalFile: no encumberance legal skylark.pdf2 Jan 2023

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise1 not delivered by the promised date4 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
VIGHNAHARTA CO-OP HSG.SOCIETYp51700055012Survey no 11 Hissa no 1, poona link road, Kalyan E, Tisgaon, Kalyan, Thane, 421306, MAHARASHTRA--Certificate SignedDec 2028Not due yet
ASHTAVINAYAK PARK CO-OP.HSG SOCIETY LTDp51700053952Survey no 8 Hissa no 5B, Tisgaon, Kalyan E, Tisgaon, Kalyan, Thane, 421306, MAHARASHTRA--Certificate SignedDec 2028Not due yet
METRO PRIDEp51700052871Gut No 2, KACHORE GAON, KALYAN, KACHORE, Kalyan, Thane, 421301, MAHARASHTRA--Certificate SignedDec 2027Not due yet
SHUBHAM MONOLITH D WINGp51700049500Survey no 30 Hissa no 15A, Survey no 31/1,2, and 19, kalyan E, KALYAN , Tisgaon, Kalyan, Thane, 421306, MAHARASHTRA--Certificate SignedDec 2026Not due yet
SHUBHAM MONOLITHP51700022647TISGAON, Thane-Oct 2019Certificate SignedMay 2024Not delivered
KASHISH GALAXY PHASE 1,2AT MALUJE KACHORE GAT NO 2 4 7 5 NARAYAN NAGAR KALYAN E316-CompletedDec 2016Dec 2016
MITALI HEIGHTSSURVEY NO 29 HISSA NO 43 16 17117-CompletedNov 2015Nov 2015
SHUBHAM COMPLEX -2AT MAUJE TISGAON SURVEY NO 30 HISSA NO 12 13 GAVLI NAGAR KALYAN E76-CompletedMar 2015Mar 2015
SOHAN TOWERSURVEY NO 31 HISSA NO 12 GAVALI NAGAR TISGAON KALYAN E94-CompletedJun 2014Jun 2014

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep METRO PRIDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KALYAN7,600+ in Thane

2 kmMETRO PRIDECompleted 32Lapsed / revoked 29Other 53Dot size: filed unitsN

Filed coordinates, straight-line distance. 114 registered projects within 2 km.

Builder: Gaurivinayak Builders and Developers Pvt Ltd

Gaurivinayak Builders and Developers Pvt Ltd has 12 registrations on MahaRERA, including BISTURIBAI TOWER and EKNATH ENCLAVE. Its filings disclose 9 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if METRO PRIDE is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of METRO PRIDE?

The registered promoter entity is Gaurivinayak Builders and Developers Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in METRO PRIDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for METRO PRIDE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at METRO PRIDE?

The professionals named in the filing: Architect: TUSHAR DILIP TENDOLKAR; Engineer: Rajesh thakre & associates; Chartered Accountant: Gayakwad & Arracken. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in METRO PRIDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About METRO PRIDE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save METRO PRIDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.