Home / Browse projects / Mumbai Suburban, Maharashtra / Merushikhar
Merushikhar
By Savvy Infrastructure Private Limited
RG-MH-68433 · RERA P51800049155 · Last updated on MahaRERA portal: 1 Dec 2025
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Merushikhar is a Others project by Savvy Infrastructure Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049155 on 1 Feb 2023. The registration is recorded completed; possession was promised by 31 Mar 2026. 79 of the 213 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameMerushikhar
- TypeOthers
- Location
- Parsi Panchayat Road
- Mogra
- Andheri East
- Mogra
- Andheri
- Mumbai Suburban
- 400069
- Pincode400069
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800049155
- ReraGenie IDRG-MH-68433
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on1 Feb 2023
- Promised completion31 Mar 2026
- Revised completionNone
- Buildings2 building records
- Documents filed122 files
Current status
Figures as on 1 Dec 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Wing | NA | 15 | 13 | 105 | 11 | 116 |
| B Wing | NA | 15 | 12 | 87 | 10 | 97 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 1 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 70%.
A Wing55%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 70% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 5% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B Wing55%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 70% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 5% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 1 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed236
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership8
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/s Premier Products | Andheri | Mumbai Suburban |
| M/s.Polymac Industries | Andheri | Mumbai Suburban |
| Divyesh Niranjan Patel | Andheri | Mumbai Suburban |
| Rishikesh Niranjan Patel | Andheri | Mumbai Suburban |
| Bhavana Harivadan Patel | Andheri | Mumbai Suburban |
| Yomesh Harivadan Patel | Andheri | Mumbai Suburban |
| Yogesh Harivadan Patel | Andheri | Mumbai Suburban |
| Seema Patel | Andheri | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Engineer | SK Consultants & Engineers |
| Chartered Accountant | NB Sayed & Associates |
| Partner | Role in project |
|---|---|
| Savvy Infrastructure Private Limited | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000397474 | BRAHMESH SOMABHAI PATEL | SAVVY INFRASTRUCTURE PRIVATE LIMITED | 13/10/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jan 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 May 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed122
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 - Merushikhar as on Sep 2025.pdf | 1 Dec 2025 |
| Form 2File: Form 2 - Merushikhar as on Sep 2025.pdf | 1 Dec 2025 |
| Form 3File: Form 3 - Merushikhar as on Sep 2025.pdf | 1 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Merushikhar as on Sep 2025.pdf | 1 Dec 2025 |
| Form 1File: Form 1 - Merushikhar as on June 2025.pdf | 24 Sep 2025 |
| Form 2File: Form 2 - Merushikhar as on June 2025.pdf | 24 Sep 2025 |
| Form 3File: Form 3 - Merushikhar as on June 2025.pdf | 24 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Merushikhar as on June 2025.pdf | 24 Sep 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Merushikhar as on Sep 2024_Signed_compressed.pdf | 20 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Merushikhar as on Dec 2024_Signed_compressed.pdf | 20 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Merushikhar as on 30-09-2024_Signed_compressed.pdf | 19 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Merushikhar as on 31-12-2024_Signed_compressed.pdf | 19 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bhavana Q2 2024-2025.pdf | 17 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Polymac Q2 2024-2025.pdf | 17 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Yogesh Q2 2024-2025.pdf | 17 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Yomesh Q2 2024-2025.pdf | 17 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bhavana Q3 2024-2025.pdf | 17 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Polymac Q3 2024-2025.pdf | 17 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Yogesh Q3 2024-2025.pdf | 17 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Yomesh Q3 2024-2025.pdf | 17 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 17 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 34 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf | 17 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 17 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Yomesh Form 3.pdf | 10 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bhavana Form 3.pdf | 10 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Yogesh Form 3.pdf | 10 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Polymac form 3-2.pdf | 10 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Divyesh Form 3-2.pdf | 10 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Premier Products .pdf | 10 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rishikesh Q2 Form 3.pdf | 10 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Merushikhar as on June 2024.pdf | 3 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Merushikhar as on Sep 2024.pdf | 3 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Merushikhar for FY 2023-24.pdf | 3 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Merudhikhar as on 30-06-2024 final_compressed.pdf | 14 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Merushikhar as on June 2024.pdf | 27 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: vvvvvvvvvvvvvvvv.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Polymac Industries.pdf | 17 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Divyesh Patel.pdf | 17 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rishikesh.pdf | 17 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Premier Products.pdf | 17 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Yogesh Patel.pdf | 17 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bhavana Patel.pdf | 17 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Yomesh Patel.pdf | 17 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Circular 29.pdf | 22 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Sajal Kumar.pdf | 21 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 (FY 2022-23) - Merushikhar.pdf | 21 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Merushikhar as on 25-03-2024 (SIGNED).pdf | 18 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Merushikhar as on 25-03-2024 (SIGNED).pdf | 18 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Merushikhar as on 25-03-2024 (SIGNED).pdf | 18 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Merushikhar as on Dec 2023.pdf | 14 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Merushikhar as on 25-03-2024.pdf | 14 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Merushikhar -as on 31-12-2023.pdf | 14 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Merushikhar -as on 25-03-2024.pdf | 14 May 2024 |
| Building plan approvalFile: 1-4_compressed.pdf | 4 May 2024 |
| Building plan approvalFile: 5-9_compressed.pdf | 4 May 2024 |
| Layout approvalFile: Page 1.pdf | 4 May 2024 |
| Copy of Layout Approval (in case of layout)File: Page 1.pdf | 4 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 1-4_compressed.pdf | 4 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 5-9_compressed.pdf | 4 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Merushikhar for FY 2022-23.pdf | 25 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: b.pdf | 20 Apr 2024 |
| Declaration about Commencement CertificateFile: Format D.pdf | 16 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 16 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC - Merushikhar.pdf | 8 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Merushikhar as on June 2023.pdf | 12 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Merushikhar as on March 2023.pdf | 12 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Merushikhar as on Sep 2023.pdf | 12 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Merushikhar as on 4th Oct 2023.pdf | 12 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Merushikhar as on March 2023.pdf | 12 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Merushikhar as on Sep 2023.pdf | 12 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Merushikhar as on 04-10-2023.pdf | 12 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Merushikhar as on September 2023.pdf | 18 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Merushikhar as on 30-09-2023.pdf | 1 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Merushikhar as on 30-09-2023.pdf | 1 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bhavana Patel.pdf | 1 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Divyesh Patel.pdf | 1 Nov 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 122 filed documents as one ZIP, foldered, with a manifest
Keep Merushikhar on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mogra, Andheri East6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 297 registered projects within 2 km.
Nityanand Nagar Vibhag IV Cooperative Housing
BAJAJ INTERNATIONAL REALTY PRIVATE LIMITED
FORTUNE ELITE
SAFFRON SPACES LIMITED
NICCO RESIDENCY
NEELKAMAL REALTY & CONSTRUCTION LLP
Parleshwar Aangan
Panom Developers LLP
ATHARV AARADHYAM
Atharv Infra LLP
Krishna Milan Heights
Milan Interbuilt Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: Savvy Infrastructure Private Limited
Savvy Infrastructure Private Limited has 2 registrations on MahaRERA, including Merushikhar and Merushikhar Sindhu Baug Towers. Its filings disclose 1 earlier MahaRERA project, none completed yet. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Merushikhar is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Merushikhar?
The registered promoter entity is Savvy Infrastructure Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Merushikhar?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Merushikhar?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Merushikhar?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Merushikhar?
The professionals named in the filing: Engineer: SK Consultants & Engineers; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Merushikhar?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback