Home / Browse projects / Pune, Maharashtra / MERAKI LIFE - PHASE I

Registration lapsed No litigation declared Residential / Group Housing project

MERAKI LIFE - PHASE I

By GREENSCAPE REALTY LLP

RG-MH-20793 · RERA P52100006228 · Last updated on MahaRERA portal: 18 Dec 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
5 of 11Construction stages donefurthest along: Internal walls, 95%
1Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

MERAKI LIFE - PHASE I is a Residential / Group Housing project by GREENSCAPE REALTY LLP in Pune, Maharashtra, registered with MahaRERA as P52100006228 on 14 Aug 2017. Possession was promised by 30 Dec 2023 and is now 34 months past that date. The completion date has moved by 24 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMERAKI LIFE - PHASE I
  • TypeResidential / Group Housing
  • Location
    • kune nm
    • Kune N.m.
    • Mawal
    • Pune
    • 410401
  • Pincode410401
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100006228
  • ReraGenie IDRG-MH-20793

Builder

  • NameGREENSCAPE REALTY LLP
  • Entity typePartnership
  • PartnersDIYA SURESHKUMAR WAVIA, SURESH AMBAVI WAVIA
  • Other registrations2 more →
  • No longer live3 lapsed, de-registered or revoked

Key dates

34 months past promisethis monthRegisteredAug 2017First promiseDec 2021Revised toDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on14 Aug 2017
  • Promised completion30 Dec 2023
  • Revised completionRevised to 30 Dec 2023 (originally 30 Dec 2021)
  • Buildings1 building record
  • Documents filed104 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PHASE 1NA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

PHASE 1: 86% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities15

As on 18 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes65%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes90%
Open ParkingYes0%

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Open Space16

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area21,964 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
GANPAT KONDEEBA GOJEKune N.m.Pune
SUNEEL KONDIBA GOJEKune N.m.Pune
HARILAL KONDIBA GOJEKune N.m.Pune
SANJAY SAMPATKUMAR JAINAndheriMumbai Suburban

Approvals and building plan

Permissible FSI17262.89
Proposed, not sanctioned17,263 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPERSEPOLIS PREMISES COHS, PLOT-74, SECTOR-17, VASHI, NAVI MUMBAI-400705

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVASTU DESIGNERS
EngineerSTRUCTURAL CONCEPT DESIGNS PVT LTD
Chartered AccountantKRUPA BALIA
Chartered AccountantKRUPA UDAY BALIA
PartnerRole in project
GREENSCAPE REALTY LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100013955Dec 2021 → Dec 2023

Reason as filed by the promoterWe would like to apply for Time Extension of the Project Meraki life PHASEI. Due to the current COVID 19 pandemic situation we are unable to complete the Project in all respects by 30/12/2022 as mentioned in RERA.

EXT52100011376Dec 2021 → Dec 2022

Reason as filed by the promoterThe said plot is notified under Pune Metropolitan Region Development Authority (PMRDA). The process of obtaining CC clearance certificate as per new CC DP/MBA/KUNENAMA/S.NO.117/1/A/2 AND P. NO. 431/21-22 DT 21/09/2021 is time consuming and the current COVID pandemic scenario.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000279771Hiren NavinChandra GanatraSuresh Ambavi Wavia28/11/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - April To June 2022 Q1.pdf18 Dec 2025
Form 2File: form 2- 30-06-2022.pdf18 Dec 2025
Form 3File: rera form 3 phase 1 june 22.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure jun22.pdf18 Dec 2025
Form 1File: Form 1-Q2.pdf18 Dec 2025
Form 2File: Form 2 30-09-2022.pdf18 Dec 2025
Form 3File: sep 2022 phase 1 rfera form 3.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure .pdf18 Dec 2025
Form 1File: Form 1 -Q3.pdf18 Dec 2025
Form 2File: Form-02 31-12-2022.pdf18 Dec 2025
Form 3File: Form 3 dec 2022 rera.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure .pdf18 Dec 2025
Form 1File: Form 1.pdf18 Dec 2025
Form 2File: from 2 31-03-2023.pdf18 Dec 2025
Form 3File: Form 3 march2023 rera.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure.pdf18 Dec 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Phase I ok_compressed.pdf29 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - 31032022 Phase I-signed.pdf21 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1 .pdf19 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1 .pdf19 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1.pdf19 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1 .pdf19 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1 .pdf19 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1 .pdf19 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1 .pdf19 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1 .pdf19 Apr 2023
Proforma of Agreement for saleFile: Agreement of sale.pdf18 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2A -2019-20.pdf24 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A -2020-21.pdf24 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A -2021-22.pdf24 Feb 2023
Details of encumbrances concerned to FinanceFile: Certificate - Phase I.pdf15 Feb 2023
Details of encumbrances concerned to LegalFile: Certificate - Phase I.pdf15 Feb 2023
Certificates of CA (Form 3)File: form 3 final.pdf15 Feb 2023
Certificates of CA (Form 3)File: final form 3_merged.pdf14 Feb 2023
Certificates of CA (Form 3)File: final form 3_merged.pdf14 Feb 2023
Certificates of CA (Form 3)File: final form 3_merged.pdf14 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - 31032022 Phase I.pdf14 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf24 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf24 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf24 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf24 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf24 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf24 Jan 2023
Certificates of CA (Form 3)File: final form 3.pdf24 Jan 2023
Certificates of CA (Form 3)File: final form 3.pdf24 Jan 2023
Certificates of CA (Form 3)File: final form 3.pdf24 Jan 2023
Certificates of CA (Form 3)File: final form 3.pdf24 Jan 2023
Certificates of CA (Form 3)File: form 3 june 18_.pdf4 Jan 2023
Certificates of CA (Form 3)File: form 3_merged.pdf4 Jan 2023
Certificates of CA (Form 3)File: form 3_merged.pdf4 Jan 2023
Certificates of CA (Form 3)File: FORM 3_merged.pdf4 Jan 2023
Certificates of CA (Form 3)File: FORM 3_merged.pdf4 Jan 2023
Certificates of CA (Form 3)File: FORM 3_merged.pdf4 Jan 2023
Certificates of CA (Form 3)File: FORM 3_merged.pdf4 Jan 2023
Certificates of CA (Form 3)File: FORM 3_merged.pdf4 Jan 2023
Certificates of CA (Form 3)File: FORM 3_merged.pdf4 Jan 2023
Certificates of CA (Form 3)File: FORM 3_merged.pdf4 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2_compressed.pdf2 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2_compressed.pdf2 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2_compressed.pdf2 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2_compressed.pdf2 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2_compressed.pdf2 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2_compressed.pdf2 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2_compressed.pdf2 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2_compressed.pdf2 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2_compressed.pdf2 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2_compressed.pdf2 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - 31032022.pdf15 Dec 2022
CERSAI detailsFile: Phase II CERSAI.pdf28 Feb 2022
Declaration about Commencement CertificateFile: CC Letter.pdf25 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: PHASE-I.pdf24 Feb 2022
Certificates of CA (Form 3)File: Green Escape Phase 1 new.pdf24 Feb 2022
Declaration about Commencement CertificateFile: CC-compressed.pdf17 Feb 2022
CERSAI detailsFile: Phase I CERSAI.pdf17 Feb 2022
Disclosure of sold/ booked inventoryFile: Disclosure.pdf17 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - 31032021 LH Phase I.pdf17 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - 31032019 LH Phase I.pdf15 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - 31032020 LH Phase I.pdf15 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: CC Amended Meraki Life.pdf25 Mar 2019
Certificates of CA (Form 3)File: Meraki Life phase 1 form 3.pdf15 Mar 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MERAKI LIFE - PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kune N.m.13,700+ in Pune

2 kmMERAKI LIFE - PHASE ICompleted 3Lapsed / revoked 4Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 11 registered projects within 2 km.

Builder: GREENSCAPE REALTY LLP

GREENSCAPE REALTY LLP has 3 registrations on MahaRERA, including MERAKI LIFE - PHASE I and MERAKI LIFE - PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that MERAKI LIFE - PHASE I shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if MERAKI LIFE - PHASE I is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MERAKI LIFE - PHASE I?

The registered promoter entity is GREENSCAPE REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MERAKI LIFE - PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MERAKI LIFE - PHASE I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MERAKI LIFE - PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MERAKI LIFE - PHASE I?

The professionals named in the filing: Architect: VASTU DESIGNERS; Engineer: STRUCTURAL CONCEPT DESIGNS PVT LTD; Chartered Accountant: KRUPA BALIA; Chartered Accountant: KRUPA UDAY BALIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MERAKI LIFE - PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MERAKI LIFE - PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MERAKI LIFE - PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.