Menlo Homes Hinjewadi Phase 2

By Menlo Homes LLP

RG-MH-16631 · RERA P52100026972 · Last updated on MahaRERA portal: 25 May 2026

Source: official MahaRERA filing

Red flags

  • 4 complaints at MahaRERA
  • Completion date moved by 42 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 42 months from the original
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
1 of 119Units unsoldnot recorded sold or booked
4Complaints at MahaRERAon this registration
Jump to the 124 documents Report an error

Menlo Homes Hinjewadi Phase 2 is a Residential / Group Housing project by Menlo Homes LLP in Pune, Maharashtra, registered with MahaRERA as P52100026972 on 7 Nov 2020. Possession is promised by 31 Dec 2028. The completion date has moved by 42 months from the original filing. 118 of the 119 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 4 complaints are on record with the regulator.

At a glance

Project

  • NameMenlo Homes Hinjewadi Phase 2
  • TypeResidential / Group Housing
  • Location
    • Phase 3 road
    • Hinjewadi Phase 2
    • Man
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • RERA no.P52100026972
  • ReraGenie IDRG-MH-16631

Builder

  • NameMenlo Homes LLP
  • Entity typePartnership
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredNov 2020First promiseJun 2025Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Nov 2020
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed124 files

Current status

99%118 of 119 units booked
97.5%Work done, per cost certificate

Figures as on 25 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA12101190119

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

A: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes0%
Street LightingYes50%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed177

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots177
Closed/Covered177

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area13,024 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Jul 2025
LandownerVillageDistrict
Shri Sant Nagebaba Multistate Co-op Urban Credit SAhmadnagar (CB)Ahmednagar

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Developement Authority,Pune
Permissible FSI5668.59
Proposed, not sanctioned5,669 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPune
Estimated costRs 22.22 cr
Cost incurredRs 21.66 cr
Work done97.48%
BuildingWingEstimatedIncurred
ANARs 20.22 crRs 20.22 cr
-NARs 2.00 crRs 1.44 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectInsignis Architecture
EngineerMangesh Deshmukh
Chartered AccountantRavindra Rathi
PartnerRole in project
Menlo Homes LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA13022619831Jun 2025 → Dec 2028

Reason as filed by the promoterIn view of market demand, we plan to construct additional floors and have applied for revised sanctioned plans. Consequently, the overall construction timeline will be extended.

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC12600039Muddasarnajir DesaiMenlo Homes LLP03/01/2026
CC12600466Bharti ChandwaniMenlo Homes LLP26/01/2026
CC12603317Sudhanshu ChoureyMenlo Homes LLP01/06/2026
CC12602999Nilesh KumarMenlo Homes LLP20/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Sep 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Sep 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed124

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 124 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: 02 WING A FLOOR PLAN 1ST TO 7TH_.pdf25 May 2026
Building plan approvalFile: 03 WING A FLOOR PLAN 8TH 9TH 10TH.pdf25 May 2026
Building plan approvalFile: 04 Wing A - Section Elevation.pdf25 May 2026
Layout approvalFile: 01 Layout Plan.pdf25 May 2026
Withdrawal Update Form 1File: 01 Form 1 Architect Certificate Format31122025.pdf23 May 2026
Withdrawal Update Form 1File: 01 Form 1 Architect Certificate Format31122025.pdf23 May 2026
Withdrawal Update Form 1File: 01 Form 1 Architect Certificate Format31032026.pdf23 May 2026
Withdrawal Update Form 2File: Engg Certificate Dec 25.pdf23 May 2026
Withdrawal Update Form 2File: Engg Certificate Dec 25.pdf23 May 2026
Withdrawal Update Form 2File: Engg Certificate March 26.pdf23 May 2026
Withdrawal Update Form 3File: CA Certificate Menlo Dec25.pdf23 May 2026
Withdrawal Update Form 3File: CA Certificate Menlo Dec25.pdf23 May 2026
Withdrawal Update Form 3File: CA Certificate Menlo March26.pdf23 May 2026
Form 1File: Form 1_June 2024.pdf16 Aug 2025
Form 2File: Form 2_Jun 2024.pdf16 Aug 2025
Form 3File: FORM 3_June 2024.pdf16 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sols Unsold Jun 2024.pdf16 Aug 2025
Form 1File: Form 1_Sep 2024.pdf16 Aug 2025
Form 2File: Form 2_Sep 2024.pdf16 Aug 2025
Form 3File: FORM 3_Sep 2024.pdf16 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sols Unsold Sep 2024.pdf16 Aug 2025
Form 1File: Form 1_Dec 2024.pdf16 Aug 2025
Form 2File: Form 2_Dec 2024.pdf16 Aug 2025
Form 3File: FORM 3_Dec 2024.pdf16 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sols Unsold Dec 2024.pdf16 Aug 2025
Form 5 (FY 2020-2021)File: Form 5 (2020-21) (1).pdf16 Aug 2025
Form 5 (FY 2021-2022)File: Form 5 (2021-22) (1).pdf16 Aug 2025
Form 1File: Form 1_Jun 2023.pdf14 Aug 2025
Form 2File: Form 2_Jun 2023.pdf14 Aug 2025
Form 3File: FORM 3_June 2023.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sols Unsold Jun 2023.pdf14 Aug 2025
Form 1File: Form 1_Sep 2023.pdf14 Aug 2025
Form 2File: Form 2_Sep 2023.pdf14 Aug 2025
Form 3File: FORM 3_Sep 2023.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sols Unsold Sep 2023.pdf14 Aug 2025
Form 1File: Form 1_Dec 2023.pdf14 Aug 2025
Form 2File: Form 2_Dec 2023.pdf14 Aug 2025
Form 3File: FORM 3_Dec 2023.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sols Unsold Dec 2023.pdf14 Aug 2025
Form 1File: Form 1_March 2024.pdf14 Aug 2025
Form 2File: Form 2_Mar 2024.pdf14 Aug 2025
Form 3File: FORM 3_Mar 2024.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold_March 2024.pdf14 Aug 2025
Form 2A (FY 2020-2021)File: Form 2A-Menlo Homes LLP.pdf14 Aug 2025
Form 2A (FY 2021-2022)File: Form 2A-March22.pdf14 Aug 2025
Form 2A (FY 2022-2023)File: Form 2A-March23.pdf14 Aug 2025
Form 2A (FY 2023-2024)File: Form 2A-March24.pdf14 Aug 2025
Form 2A (FY 2024-2025)File: Form 2A-March25.pdf14 Aug 2025
Form 5 (FY 2023-2024)File: Form 5_Mar 24.pdf14 Aug 2025
Form 5 (FY 2024-2025)File: Form 5_Mar 2025.pdf14 Aug 2025
Form 1File: Form 1_Jun 2022.pdf13 Aug 2025
Form 2File: Form 2_Jun 2022.pdf13 Aug 2025
Form 3File: FORM 3_June 2022.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sols Unsold Jun 2022.pdf13 Aug 2025
Form 1File: Form 1_Sep 2022.pdf13 Aug 2025
Form 2File: Form 2_Sep 2022.pdf13 Aug 2025
Form 3File: Form 3_Sep 2022.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sols Unsold Sep 2022.pdf13 Aug 2025
Form 1File: Form 1_Dec 2022.pdf13 Aug 2025
Form 2File: fORM 2_dEC 2022.pdf13 Aug 2025
Form 3File: Form 3_Dec 2022.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sols Unsold Dec 2022.pdf13 Aug 2025
Form 1File: Form 1_March 2023.pdf13 Aug 2025
Form 2File: Form 2_Mar 2023.pdf13 Aug 2025
Form 3File: Form 3_Mar 2023.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sols Unsold mar 2023.pdf13 Aug 2025
Form 5 (FY 2022-2023)File: Form 5_Mar 23.pdf13 Aug 2025
Form 3File: Form 3 Wing A Menlo Homes Dec 2020.pdf12 Aug 2025
Form 1File: Form 1_Dec 2020.pdf12 Aug 2025
Form 2File: Form 2_dec 2020.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Dec 2020.pdf12 Aug 2025
Form 1File: Form 1_March 2021.pdf12 Aug 2025
Form 2File: Form 2_Mar 2021.pdf12 Aug 2025
Form 3File: Form 3_March 2021.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sols Unsold Mar 2021.pdf12 Aug 2025
Form 1File: Form 1_Jun 2021.pdf12 Aug 2025
Form 2File: Form 2_Jun 2021.pdf12 Aug 2025
Form 3File: FORM 3_June 2021.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sols Unsold Jun 2021.pdf12 Aug 2025
Form 1File: Form 1_Sep 2021.pdf12 Aug 2025

How this compares with Pune

99%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 42 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Menlo Homes Hinjewadi Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hinjewadi Phase 213,700+ in Pune

Builder: Menlo Homes LLP

Menlo Homes LLP has 2 registrations on MahaRERA, including Menlo Homes Hinjewadi Phase I and Menlo Homes Hinjewadi Phase 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Menlo Homes Hinjewadi Phase 2 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Menlo Homes Hinjewadi Phase 2?

The registered promoter entity is Menlo Homes LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Menlo Homes Hinjewadi Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Menlo Homes Hinjewadi Phase 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Menlo Homes Hinjewadi Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Menlo Homes Hinjewadi Phase 2?

The professionals named in the filing: Architect: Insignis Architecture; Engineer: Mangesh Deshmukh; Chartered Accountant: Ravindra Rathi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Menlo Homes Hinjewadi Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Menlo Homes Hinjewadi Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Menlo Homes Hinjewadi Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.