Home / Browse projects / MEHTA SUNSHINE HEIGHTS B WING
MEHTA SUNSHINE HEIGHTS B WING
RG-MH-24863 · RERA P51900011526 · Last updated on MahaRERA portal: 19 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 36 months
- 3 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MEHTA SUNSHINE HEIGHTS B WING is a Residential / Group Housing project by CHANDULAL JORAWARMAL MEHTA in 400004, registered with MahaRERA as P51900011526 on 31 Aug 2017. Possession is promised by 29 Dec 2026. The completion date has moved by 36 months from the original filing. 25 of the 126 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameMEHTA SUNSHINE HEIGHTS B WING
- TypeResidential / Group Housing
- Location
- SADASHIV LANE
- 400004
- Pincode400004
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900011526
- ReraGenie IDRG-MH-24863
Builder
- NameCHANDULAL JORAWARMAL MEHTA
- Entity typeIndividual
- GSTIN27AADPM2831L1ZM
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on31 Aug 2017
- Promised completion29 Dec 2026
- Revised completionRevised to 29 Dec 2026 (originally 30 Dec 2023)
- Buildings1 building record
- Documents filed83 files
Current status
Figures as on 19 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MEHTA SUNSHINE HEIGHTS B WING | NA | 23 | 23 | 116 | 10 | 126 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 19 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
MEHTA SUNSHINE HEIGHTS B WING: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 19 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| MEHTA SUNSHINE HEIGHTS B WING | NA | Rs 11.55 cr | Rs 11.55 cr |
| - | NA | Rs 3.85 cr | Rs 5.30 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | CHUDAWALA & ASSOCIATES |
| Architect | NEERAV CHUDAWALA |
| Engineer | APARNA DABAK |
| Chartered Accountant | Yashesh Mehta |
| Partner | Role in project |
|---|---|
| CHANDULAL JORAWARMAL MEHTA | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterEntire project development and construction is over. We had applied for Occupancy Certificate to the MCGM and will get it in due course. We need time for OC Procedures, Society Formation , Handover and Conveyance Procedures
Reason as filed by the promoterWe had completed entire development work of the project and project is ready for handover. We also had got ' No Objection Certificate' from MHADA which is need for 'Occupancy Certificate'. We are in process to apply for Occupancy Certificate from BMC. We need some time to get Occupancy Certificate and then complete society formation , handover and Re-Conveyance Process. We had well informed this situation to clients and also seek 2/3 Consent from them for the extension.
Reason as filed by the promoterWe had completed entire project development. There is no pending work. We had also applied for Occupancy Certificate however it is delayed from Approving Authority. We need time to get OC and Formally apply for closure.
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12603872 | Aditi Arvind Dani | CHANDULAL JORAWARMAL MEHTA | 23/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 29 Dec 2026
Documents filed83
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: arch.pdf | 19 Aug 2026 |
| Withdrawal Update Form 2File: engg.pdf | 19 Aug 2026 |
| Withdrawal Update Form 3File: FINAL Q3 FY 2526 RERA CA CERTIFICATE MSH B WING.pdf | 19 Aug 2026 |
| Form 2A (FY 2025-2026)File: FINAL FORM 2A - FY 25 26 MSH B WING.pdf | 19 Aug 2026 |
| Form 5 (FY 2023-2024)File: FORM 5 MSH B WING FY 23-24 CA CERTIFIED.pdf | 19 Aug 2026 |
| Form 5 (FY 2024-2025)File: FORM 5 MSH B WING FY 24-25 CA CERTIFIED.pdf | 19 Aug 2026 |
| Withdrawal Update Form 1File: arch.pdf | 20 Nov 2025 |
| Withdrawal Update Form 2File: engg.PDF | 20 Nov 2025 |
| Withdrawal Update Form 3File: ca form 3.pdf | 20 Nov 2025 |
| Certificates of CA (Form 3)File: CA RERA CERTIFICATE MSH B WING Q-4 FY 24-25_compressed.pdf | 21 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4 FY 24-25 architecture certificate msh b wing .pdf | 29 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q4 Engineer.pdf | 29 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: sold unsold.pdf | 29 Apr 2025 |
| CERSAI detailsFile: SELF DECLARATION NO CERSAI REAPORT.pdf | 29 Apr 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: DECLARATION ABOUT RERA DESIGNATED BANK ACCOUTS FOR REAL.pdf | 29 Apr 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure.pdf | 29 Apr 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: disclosure.pdf | 29 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4 FY 24-25 architecture certificate msh b wing .pdf | 18 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q4 Engineer.pdf | 18 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q-4 FY 24-25 architecture certificate msh b wing (2).pdf | 17 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q4 Engineer.pdf | 17 Apr 2025 |
| Declaration in FORM BFile: FORM B AFFIDAVIT CUM DECLARATION .pdf | 14 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 .pdf | 14 Feb 2025 |
| Certificates of CA (Form 3)File: FORM 3 CA CERTIFICATE NAKODA MSH B WING Q-3 FY 24-251.pdf | 14 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers.pdf | 14 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: disclosure.pdf | 17 Oct 2024 |
| Certificates of CA (Form 3)File: ca 1.pdf | 17 Oct 2024 |
| Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION.pdf | 17 Oct 2024 |
| Declaration in FORM BFile: Declaration in FORM B.pdf | 17 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: disclosure.pdf | 17 Oct 2024 |
| Certificates of CA (Form 3)File: ca 1.pdf | 17 Oct 2024 |
| Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION.pdf | 17 Oct 2024 |
| Declaration in FORM BFile: Declaration in FORM B.pdf | 17 Oct 2024 |
| Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION.pdf | 17 Oct 2024 |
| Declaration in FORM BFile: Declaration in FORM B.pdf | 17 Oct 2024 |
| Certificates of CA (Form 3)File: ca 1.pdf | 17 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: disclosure.pdf | 17 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 MSH B WING 20 21 CERTIFIED.pdf | 16 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 MSH B WING FY 21 22 CA CERTIFIED.pdf | 16 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 MSH B WING FY 22 23 CA CERTIFIED.pdf | 16 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 MSH B WING 20 21 CERTIFIED.pdf | 16 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 MSH B WING FY 21 22 CA CERTIFIED.pdf | 16 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 MSH B WING FY 22 23 CA CERTIFIED.pdf | 16 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 MSH B WING 20 21 CERTIFIED.pdf | 16 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 MSH B WING FY 21 22 CA CERTIFIED.pdf | 16 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 MSH B WING FY 22 23 CA CERTIFIED.pdf | 16 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - MSH B WING Q-4 FY 23-24 (1).pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 MSH B WING FY 23-24 CA CERTIFIED (1).pdf | 7 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE SOLD UNSOLD INVENTORY MSH B WING.pdf | 7 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - MSH B WING Q-4 FY 23-24 (1).pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 MSH B WING FY 23-24 CA CERTIFIED (1).pdf | 7 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE SOLD UNSOLD INVENTORY MSH B WING.pdf | 7 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE SOLD UNSOLD INVENTORY MSH B WING.pdf | 7 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - MSH B WING Q-4 FY 23-24 (1).pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 MSH B WING FY 23-24 CA CERTIFIED (1).pdf | 7 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q-4 FY 23-24 architecture certificate msh b wing (2).pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers_Certificate certified form 2 form msh b wing.pdf | 12 Aug 2024 |
| Certificates of CA (Form 3)File: FORM 3 CA CERTIFIED OF MSH B WING.pdf | 12 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2-A FY 21-22 MSH B WING SITE SUPERVISOR.pdf | 4 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2-A FY 22-23 MSH B WING SITE SUPERVISOR.pdf | 4 Mar 2024 |
| Declaration about Commencement CertificateFile: DECLARATION OF COMMENCEMENT CERTIFICATE - MSH.pdf | 26 Jun 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineers Certificate on Quality Assurance (Form 2A FY 2019-20).pdf | 26 Jun 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers Certificate on Quality Assurance (Form 2A FY 2020-21).pdf | 26 Jun 2021 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD FLATS DETAILS OF MSH B WING.pdf | 26 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: ANNUAL AUDIT REPORT - FY 17-18.pdf | 24 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: ANNUAL AUDIT REPORT - FY 18-19.pdf | 24 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: ANNUAL AUDIT REPORT - FY 19-20.pdf | 24 Jun 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Mehta Sunshine Heights CC.PDF | 12 Apr 2018 |
| Details of encumbrancesFile: index II of morgatge deed.pdf | 26 Feb 2018 |
| Details of encumbrancesFile: Encumbrances Letter.pdf | 26 Feb 2018 |
| Certificates of CA (Form 3)File: CA Certificate MSH.pdf | 30 Jul 2017 |
| Certificates of CA (Form 3)File: CA Certificate MSH Anx A.pdf | 30 Jul 2017 |
| Building plan approvalFile: mehta sunshine IOD.pdf | 29 Jul 2017 |
| Layout approvalFile: MEHTA SUNSHINE HEIGHTS APPROVED PLAN.pdf | 29 Jul 2017 |
| Copy of the legal title reportFile: TITLE CERTIFICATE MSH.pdf | 29 Jul 2017 |
| Details of encumbrancesFile: TITLE CERTIFICATE MSH.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: MEHTA SUNSHINE HEIGHTS APPROVED PLAN.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: mehta sunshine IOD.pdf | 29 Jul 2017 |
| Declaration in FORM BFile: FORM B MEHTA SUNSHINE HEIGHTS.pdf | 29 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE (RERA) FORM -1.pdf | 29 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 83 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MEHTA SUNSHINE HEIGHTS B WING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near this project
Filed coordinates, straight-line distance. 70 registered projects within 2 km.
SHREEPATI CASTLE
SHREEPATI CASTLE
Meadows
Celestial Globe (A.O.P.)
SHREEPATI BAYVIEW
SHREEPATI BUILD INFRA INVESTMENT LIMITED
NAKODA MEHTA SUNSHINE HEIGHTS A AND C WINGS
CHANDULAL JORAVARMALJI MEHTA
Earth Enclave
Earth Graphics
Chandan Signature
PAVAN KUMAR BACHHRAJ CHANDAN
Builder: CHANDULAL JORAWARMAL MEHTA
CHANDULAL JORAWARMAL MEHTA has 2 registrations on MahaRERA, including MEHTA HEIGHTS and MEHTA SUNSHINE HEIGHTS B WING. Its filings disclose no earlier MahaRERA projects. Read the full track record.
Frequently asked questions
What are my rights if MEHTA SUNSHINE HEIGHTS B WING is delayed beyond 29 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MEHTA SUNSHINE HEIGHTS B WING?
The registered promoter entity is CHANDULAL JORAWARMAL MEHTA, an individual as per the filing. Its GSTIN 27AADPM2831L1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MEHTA SUNSHINE HEIGHTS B WING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MEHTA SUNSHINE HEIGHTS B WING?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MEHTA SUNSHINE HEIGHTS B WING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MEHTA SUNSHINE HEIGHTS B WING?
The professionals named in the filing: Architect: CHUDAWALA & ASSOCIATES; Architect: NEERAV CHUDAWALA; Engineer: APARNA DABAK; Chartered Accountant: Yashesh Mehta. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MEHTA SUNSHINE HEIGHTS B WING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback