Home / Browse projects / Mumbai Suburban, Maharashtra / MEGHDOOT
MEGHDOOT
RG-MH-05497 · RERA P51800050968 · Last updated on MahaRERA portal: 30 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MEGHDOOT is a Residential / Group Housing project by NHP CONSTRUCTION LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050968 on 16 May 2023. Possession is promised by 31 May 2027. 6 of the 26 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.
At a glance
Project
- NameMEGHDOOT
- TypeResidential / Group Housing
- Location
- AT N.S 5TH ROAD
- JVPD SCHEME
- VILE PARLE WEST
- Vileparle
- Andheri
- Mumbai Suburban
- 400056
- Pincode400056
- RERA no.P51800050968
- ReraGenie IDRG-MH-05497
Builder
- NameNHP CONSTRUCTION LLP
- Entity typePartnership
- PartnerNITIN TRAMBAKLAL SANGHAVI
- Other registrations2 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 May 2023
- Promised completion31 May 2027
- Revised completionNone
- Buildings1 building record
- Documents filed57 files
Current status
Figures as on 30 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MEGHDOOT | NA | 15 | 13 | 26 | 0 | 26 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
MEGHDOOT: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 30 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed42
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership4
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SNEHA ASHOK SHAH | Vileparle | Mumbai Suburban |
| CHHAYA RAJESH SHAH | Vileparle | Mumbai Suburban |
| ASHOK KANTILAL SHAH | Vileparle | Mumbai Suburban |
| RAJESH KANTILAL SHAH | Vileparle | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| MEGHDOOT | NA | Rs 15.75 cr | Rs 10.87 cr |
| - | NA | Rs 8.29 cr | Rs 4.94 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SP ASSOCIATES |
| Engineer | KRISHNAKUMAR GOHEL |
| Chartered Accountant | JINESH SHAH |
| Chartered Accountant | mahindra choudhary |
| Chartered Accountant | kagrana & associates |
| Partner | Role in project |
|---|---|
| NHP CONSTRUCTION LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Apr 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Nov 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Nov 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 May 2027
Documents filed57
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Q3 - OCT25 - DEC25 - Form1 - Architect Certificate.pdf | 30 May 2026 |
| Withdrawal Update Form 2File: Q3 - Oct25 - Dec25 Form 2 - engineeer Certificate - meghdoot.pdf | 30 May 2026 |
| Withdrawal Update Form 3File: Q3 - OCT25 - DEC25 Form3 - CA Certificate.pdf | 30 May 2026 |
| Form 2A (FY 2024-2025)File: Meghoot FY 24 25 Quality Assurance Engineer Certificate.pdf | 20 Mar 2026 |
| Form 5 (FY 2024-2025)File: FORM 5 FY 2024-2025 - Meghdoot (1).pdf | 21 Feb 2026 |
| Withdrawal Update Form 1File: Q3 - OCT25 - DEC25 - Form1 - Architect Certificate.pdf | 16 Feb 2026 |
| Withdrawal Update Form 2File: Q3 - Oct25 - Dec25 Form 2 - engineeer Certificate - meghdoot.pdf | 16 Feb 2026 |
| Withdrawal Update Form 3File: Q3 - OCT25 - DEC25 Form3 - CA Certificate.pdf | 16 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 19 Dec 2025 |
| Withdrawal Update Form 2File: FORM 2.pdf | 19 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3.pdf | 19 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate Q1 FY25-26 Meghdoot.pdf | 18 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Q1 FY25-26 Meghdoot.pdf | 18 Dec 2025 |
| Withdrawal Update Form 3File: Q1 - APR25 - JUN25 - FORM3 - CA CERTIFICATE_Meghdoot_11zon.pdf | 18 Dec 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 23-24.pdf | 8 Jan 2025 |
| Layout approvalFile: 4 IOD Full 05-11-24 - Drawing compress.pdf | 23 Nov 2024 |
| Building plan approvalFile: 4 IOD FULL 05-11-24.pdf | 23 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: 4 IOD Full 05-11-24 - Drawing compress.pdf | 23 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MEGHDOOT-FORM1 Architect Certificate Q2_0001.pdf | 23 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MEGHDOOT-FORM3 CA Certificate Q2_0001.pdf | 23 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MEGHDOOT-FORM2 Engineer certificate Q2_0001.pdf | 23 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 5 Further or Full CC _signed.pdf | 23 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 4 IOD FULL 05-11-24.pdf | 23 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 9 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 9 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A.pdf | 9 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 9 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 1 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 1 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 1 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FY 23-24 Q2 FORM1 ARCHITECT CERTIFICATE - MEGHDOOT_0001.pdf | 26 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FY 23-24 Q2 FORM2 ENGINEER CERTIFICATE - MEGHDOOT_0001.pdf | 26 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FY 23-24 Q2 FORM3 CA CERTIFICTE - MEGHDOOT_0001.pdf | 26 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FY 23-24 Q1 FORM1 ARCHITECT CERTIFICATE - MEGHDOOT.pdf | 14 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FY 23-24 Q1 FORM2 ENGINEER CERTIFICATE - MEGHDOOT.pdf | 14 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FY 23-24 Q1 FORM2A ENGINEER CERTIFICATE - MEGHDOOT.pdf | 14 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FY 23-24 Q1 FORM3 CA CERTIFICTE - MEGHDOOT.pdf | 14 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 CA CERTIFICATE - REVISED (1) (1).pdf | 8 May 2023 |
| Other - TechnicalFile: Clarification on inventory.pdf | 8 May 2023 |
| Layout approvalFile: IOD Approved Drawing 14-1-22.pdf | 24 Apr 2023 |
| Copy of Layout Approval (in case of layout)File: IOD Approved Drawing 14-1-22.pdf | 24 Apr 2023 |
| Proforma of Allotment letterFile: final allotment letter nhp.pdf | 24 Apr 2023 |
| Proforma of Agreement for saleFile: Draft Rera Agreement for Sale.pdf | 21 Apr 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation report-signed.pdf | 21 Apr 2023 |
| Building plan approvalFile: IOD Letter 14-1-22.pdf | 20 Apr 2023 |
| PAN CardFile: PAN Card - NHP CONSTRUCTION LLP.pdf | 20 Apr 2023 |
| Copy of the legal title reportFile: TITLE CERTIFICATE - MEGHDOOT_compressed (1).pdf | 20 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE SELF DECLARATION_0001.pdf | 20 Apr 2023 |
| Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE SELF DECLARATION_0001.pdf | 20 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD Letter 14-1-22.pdf | 20 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC 13-1-23.pdf | 20 Apr 2023 |
| Declaration about Commencement CertificateFile: CC COVERINFG LETTER_0001.pdf | 20 Apr 2023 |
| Declaration in FORM BFile: FORM B PROMOTER - NOTARISED.pdf | 20 Apr 2023 |
| CERSAI detailsFile: cresai declaration_0001.pdf | 20 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANNXURE A DOI.pdf | 20 Apr 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A SEPARATE BANK ACCOUNT LETTTER DRAFT_0001.pdf | 20 Apr 2023 |
| Deviation Report with respect to Allotment letterFile: No Deviation Report-Allotment letter-SIGNED.pdf | 20 Apr 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 57 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MEGHDOOT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VILE PARLE WEST6,700+ in Mumbai Suburban
CHANDAK VANSHAM
CHANDAK REALTORS PRIVATE LIMITED
AJOD ONE
AJOD REALTY LLP
GAUTAM DHAN
NEW INDIA CONSTRUCTIONS
AJMERA SHRINGAAR
H J CORPORATION
Imperial Landmark
Neminath and Disha Realtors
PINAL EVANA
Pinal Realty LLP
See every Mumbai Suburban project, with the district possession charts
Builder: NHP CONSTRUCTION LLP
NHP CONSTRUCTION LLP has 3 registrations on MahaRERA, including W 92 and MEGHDOOT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if MEGHDOOT is delayed beyond 31 May 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MEGHDOOT?
The registered promoter entity is NHP CONSTRUCTION LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MEGHDOOT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MEGHDOOT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MEGHDOOT?
The professionals named in the filing: Architect: SP ASSOCIATES; Engineer: KRISHNAKUMAR GOHEL; Chartered Accountant: JINESH SHAH; Chartered Accountant: mahindra choudhary; Chartered Accountant: kagrana & associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MEGHDOOT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback