Home / Browse projects / Thane, Maharashtra / MEET AVENUE
MEET AVENUE
RG-MH-29206 · RERA P51700028021 · Last updated on MahaRERA portal: 19 Feb 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 13 months past the filed date
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MEET AVENUE is a Others project by BUILDCON ENGINEERS in Thane, Maharashtra, registered with MahaRERA as P51700028021 on 26 Jan 2021. Possession was promised by 29 Sep 2025 and is now 13 months past that date. The completion date has moved by 12 months from the original filing.
At a glance
Project
- NameMEET AVENUE
- TypeOthers
- Location
- GAURIPADA
- BHIWANDI
- Bhiwandi (M Corp.)
- Thane
- 421302
- Pincode421302
- RERA no.P51700028021
- ReraGenie IDRG-MH-29206
Builder
- NameBUILDCON ENGINEERS
- Entity typePartnership
- PartnerHIREN NAGARIYA
- Other registrations1 more →
- Completed1 of 2
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on26 Jan 2021
- Promised completion29 Sep 2025
- Revised completionRevised to 29 Sep 2025 (originally 30 Sep 2024)
- Buildings1 building record
- Documents filed80 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MEET AVENUE | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 19 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 80%.
MEET AVENUE: 62% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 19 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership5
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| MOHAMMED UMAR ABDUL RAHEMAN ANSARI | Bhiwandi (M Corp.) | Thane |
| NAFEES AHMED MAQBOOL AHMED SHAIKH | Kalyan | Thane |
| TANVEER AHEMAD MAQBOOL AHMED SHAIKH | Kalyan | Thane |
| MUSHEER ALAM MAQBOOL AHMAD SHAIKH | Bhiwandi (M Corp.) | Thane |
| FAISAL ZULFIQAR AHMAD ANSARI | Bhiwandi (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RK ASSOCIATES |
| Engineer | mansab momin |
| Chartered Accountant | NITIN B DHAVAN |
| Partner | Role in project |
|---|---|
| BUILDCON ENGINEERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDUE TO ECONOMIC SLOWDOWN AND FINANCIAL CRUNCH
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Jan 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Jan 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Jan 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Jan 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed80
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: REAR ARCHITECT FORM 1 dec 24.pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC 24 MEET AVENUE.pdf | 19 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MEET AVENUE DEC 24.pdf | 19 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 sept.pdf | 8 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEPTEMBER.pdf | 8 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 sapt.pdf | 8 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DISCLOSURE MEET AVENUE.pdf | 8 Nov 2024 |
| CERSAI detailsFile: CERSAI MEET AVENUE.pdf | 8 Nov 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A MEET AVENUE.pdf | 8 Nov 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE HIREN.pdf | 8 Nov 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE PRATIK.pdf | 8 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2a-2.pdf | 8 Nov 2024 |
| Declaration in FORM BFile: FORM B NEW BUILDCON-LANDOWNERS.pdf | 11 Oct 2024 |
| Declaration in FORM BFile: FORM B NEW BUILDCON-MEET AVENUE.pdf | 11 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MARCH 24 MEET AVENUE.pdf | 11 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JUNE 24 MEET AVEUNE.pdf | 11 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MARCH 24 -MEET_11zon (1).pdf | 11 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JUNE 24- MEET_11zon (1).pdf | 11 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARCH 34 - MEET AVENUE.pdf | 11 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUNE 24-MEET.pdf | 11 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DECLARATION MEET AVENUE.pdf | 11 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 MEET AVENUE.pdf | 11 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-MARCH 2021.pdf | 22 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-JUNE 2021.pdf | 22 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-SEPT 2021.pdf | 22 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-DEC 2021.pdf | 22 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-MARCH 2022.pdf | 22 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-JUNE 2022.pdf | 22 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-SEPT 2022.pdf | 22 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-DEC 2022.pdf | 22 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-MARCH 2023.pdf | 22 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-JUNE 2023.pdf | 22 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-SEPT-2023.pdf | 22 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-DEC 2023.pdf | 22 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-MARCH 2021.pdf | 22 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-JUNE 2021.pdf | 22 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-SEPT 2021.pdf | 22 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-DEC 2021.pdf | 22 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-MARCH 2022.pdf | 22 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-JUNE 2022.pdf | 22 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-SEPT 2022.pdf | 22 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-DEC 2022.pdf | 22 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-MARCH 2023.pdf | 22 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-JUNE 2023.pdf | 22 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-SEPT 2023.pdf | 22 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-DEC 2023.pdf | 22 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 2021.pdf | 22 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A-2022.pdf | 22 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A-2023.pdf | 22 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3 MARCH 2021.pdf | 22 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3 JUNE 2021.pdf | 22 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEPT 2021.pdf | 22 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3 DEC 2021.pdf | 22 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MARCH 2022.pdf | 22 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JUNE 2022.pdf | 22 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEPT 2022.pdf | 22 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC 2022.pdf | 22 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 march 2023.pdf | 22 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 June 2023.pdf | 22 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEPT 2023.pdf | 22 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Dec-2023.pdf | 22 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 MARCH 2021.pdf | 22 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 MARCH 2022.pdf | 22 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 MARCH 2023.pdf | 22 Jan 2024 |
| Building plan approvalFile: APPROVED PLAN SHEET 1.pdf | 8 Jan 2021 |
| Building plan approvalFile: APPROVED PLAN SHEET 2.pdf | 8 Jan 2021 |
| Layout approvalFile: APPROVED PLAN SHEET 1.pdf | 8 Jan 2021 |
| Copy of the legal title reportFile: TITLE REPORT.pdf | 8 Jan 2021 |
| Details of encumbrancesFile: no encumbrances.pdf | 8 Jan 2021 |
| Copy of Layout Approval (in case of layout)File: APPROVED PLAN SHEET 1.pdf | 8 Jan 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: APPROVED PLAN SHEET 1.pdf | 8 Jan 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: APPROVED PLAN SHEET 2.pdf | 8 Jan 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: PERMISSION COPY_compressed (1).pdf | 8 Jan 2021 |
| Declaration in FORM BFile: form b builder_compressed.pdf | 8 Jan 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: from 1.pdf | 8 Jan 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 8 Jan 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A.pdf | 8 Jan 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MEET AVENUE.pdf | 8 Jan 2021 |
| Proforma of Allotment letterFile: allotment letter.pdf | 8 Jan 2021 |
| Proforma of Allotment letterFile: MEET AVENUE DRAFT AGREEMENT final.pdf | 8 Jan 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 80 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep MEET AVENUE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BHIWANDI7,600+ in Thane
GODREJ UPAVAN
PRAKHHYAT DWELLINGS LLP
DGT - Sector 3A - Cluster 2 - Phase 1
ADRIKA DEVELOPERS PRIVATE LIMITED
DOSTI GREATER THANE - PHASE 1
ADRIKA DEVELOPERS PRIVATE LIMITED
Dosti Greater Thane - Sector 3A - Cluster 1B -
ADRIKA DEVELOPERS PRIVATE LIMITED
USHA RESIDENCY
SHREE BUDHDEV INFRA
NARAYANI DHAM BUILDING NO 2A AND 2B
MAYA DEVELOPER
See every Thane project, with the district possession charts
Builder: BUILDCON ENGINEERS
BUILDCON ENGINEERS has 2 registrations on MahaRERA, including SAI DHAM RESIDENCY and MEET AVENUE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that MEET AVENUE shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if MEET AVENUE is delayed beyond 29 Sep 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MEET AVENUE?
The registered promoter entity is BUILDCON ENGINEERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MEET AVENUE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MEET AVENUE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MEET AVENUE?
The professionals named in the filing: Architect: RK ASSOCIATES; Engineer: mansab momin; Chartered Accountant: NITIN B DHAVAN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MEET AVENUE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback