ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / MAYUR NAGAR

Registered No litigation declared Others project

MAYUR NAGAR

By Sachin Vasant Raut

RG-MH-73882 · RERA P99000047115 · Last updated on MahaRERA portal: 10 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 64%
0Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

MAYUR NAGAR is a Others project by Sachin Vasant Raut in Palghar, Maharashtra, registered with MahaRERA as P99000047115 on 10 Oct 2022. Possession is promised by 31 Dec 2028.

At a glance

Project

  • NameMAYUR NAGAR
  • TypeOthers
  • Location
    • NA
    • Virar
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401305
  • Pincode401305
  • RERA no.P99000047115
  • ReraGenie IDRG-MH-73882

Builder

  • NameSachin Vasant Raut
  • Entity typeIndividual
  • Other registrations1 more →

Key dates

this monthRegisteredOct 2022PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Oct 2022
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed96 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAYUR NAGARNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 64%.

MAYUR NAGAR: 42% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure64%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed82

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots82
Closed/Covered82

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,041 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Mayur Nagar Co-Operative Housing Society Ltd.Vasai-Virar City (M Corp)Palghar

Approvals and building plan

Permissible FSI7151.55
Proposed, not sanctioned7,152 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 4 O 7 VISHNIPRATIBHA COMPLEX AGASHE ROAD VIRAR WEST THANE 4013031

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMegha Urbanscapes
EngineerS. S. & ASSOCIATES
Chartered AccountantAshutosh D. Vidwans & Co.
PartnerRole in project
Sachin Vasant Raut-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Architect Certificate 31-03-2026.pdf10 Jun 2026
Form 2File: Engineer Certificate 31-03-2026.pdf10 Jun 2026
Form 3File: CA Certificate 31-03-2026.pdf10 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Inventory 31-03-2026.pdf10 Jun 2026
Form 1File: Architect Certificate 30-09-2025.pdf22 Feb 2026
Form 2File: Engineer Certificate 30-09-2025.pdf22 Feb 2026
Form 3File: CA Certificate 30-09-2025.pdf22 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Inventory - 30-09-2025.pdf22 Feb 2026
Form 1File: Architect Certificate 31-12-2025.pdf22 Feb 2026
Form 2File: Engineer Certificate 31-12-2025.pdf22 Feb 2026
Form 3File: CA Certificate 31-12-2025.pdf22 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Inventory - 31-12-2025.pdf22 Feb 2026
Form 1File: Architect Cetificate 30-06-2025.pdf19 Jul 2025
Form 2File: Engineer Cetificate 30-06-2025.pdf19 Jul 2025
Form 3File: CA Cetificate 30-06-2025.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory 30-06-2025.pdf19 Jul 2025
Declaration about Commencement CertificateFile: Format D New.pdf19 Mar 2025
Building plan approvalFile: Blueprint.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Old.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate New.pdf11 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf11 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Blueprint.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD.pdf11 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: IMG_0001.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cetificate.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cetificate.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cetificate.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mayur Nagar Form - 1.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mayur Nagar Form - 2.pdf19 Nov 2024
Disclosure of sold/ booked inventoryFile: Mayur Nagar Sold- Booked Inventory .pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mayur Nagar Form - 3.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mayur Nagar Form 1.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mayur Nagar Form 2 .pdf19 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold .pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mayur Nagar Form 3 .pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mayur Nagar Form - 1.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mayur Nagar Form 1.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mayur Nagar Form - 3.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mayur Nagar Form 3 .pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mayur Nagar Form - 2.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mayur Nagar Form 2 .pdf19 Nov 2024
Disclosure of sold/ booked inventoryFile: Mayur Nagar Sold- Booked Inventory .pdf19 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold .pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 (1).pdf15 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 (1).pdf15 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form -2A.pdf15 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold-Booked Inventory .pdf15 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf15 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certifcate.pdf25 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf25 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf7 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf7 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM - 2A.pdf7 Dec 2023
Disclosure of sold/ booked inventoryFile: SOLD-BOOKED INVENTORY.pdf7 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf7 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form - 5 Krishka.pdf3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf19 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf19 May 2023
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD INVENTORY.pdf19 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf19 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf4 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf4 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf4 Mar 2023
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf4 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf4 Mar 2023
Other - LegalFile: Proforma AFS.pdf3 Oct 2022
Deviation Report with respect to model copy of AgreementFile: NO DEVIATION FROM AGREEMENT FOR SALE.pdf30 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf23 Sep 2022
Building plan approvalFile: Blueprint 1-1.pdf19 Sep 2022
Building plan approvalFile: Blueprint 2-1.pdf19 Sep 2022
Building plan approvalFile: Blueprint 3-1.pdf19 Sep 2022
Building plan approvalFile: Blueprint 4-1.pdf19 Sep 2022
Building plan approvalFile: Blueprint 5.pdf19 Sep 2022
Building plan approvalFile: Blueprint 6.pdf19 Sep 2022
Layout approvalFile: Blueprint 1-1.pdf19 Sep 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Finance.pdf19 Sep 2022
Copy of Layout Approval (in case of layout)File: Blueprint 1-1.pdf19 Sep 2022

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAYUR NAGAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Virar3,200+ in Palghar

Builder: Sachin Vasant Raut

Sachin Vasant Raut has 2 registrations on MahaRERA, including MAYUR NAGAR and SAURABH DARSHAN CHSL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if MAYUR NAGAR is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAYUR NAGAR?

The registered promoter entity is Sachin Vasant Raut, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAYUR NAGAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAYUR NAGAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAYUR NAGAR?

The professionals named in the filing: Architect: Megha Urbanscapes; Engineer: S. S. & ASSOCIATES; Chartered Accountant: Ashutosh D. Vidwans & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAYUR NAGAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAYUR NAGAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAYUR NAGAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.