Home / Browse projects / Satara, Maharashtra / MATOSHREE PARK
MATOSHREE PARK
RG-MH-25444 · RERA P52700011040 · Last updated on MahaRERA portal: 6 Jan 2023
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 22 months past the filed date
- Completion date moved by 42 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MATOSHREE PARK is a Residential / Group Housing project by OM BALAJI BUILDERS in Satara, Maharashtra, registered with MahaRERA as P52700011040 on 31 Aug 2017. Possession was promised by 31 Dec 2024 and is now 22 months past that date. The completion date has moved by 42 months from the original filing.
At a glance
Project
- NameMATOSHREE PARK
- TypeResidential / Group Housing
- Location
- Mhasave
- Satara
- 415513
- Pincode415513
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52700011040
- ReraGenie IDRG-MH-25444
Builder
- NameOM BALAJI BUILDERS
- Entity typePartnership
- PartnersSANDEEP GANGADHAR SANGLE, SUDHIR VISHWAS THOKE, ASHOK BABURAO JATHAR, VIMAL BAPURAO ANTU YADAV
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on31 Aug 2017
- Promised completion31 Dec 2024
- Revised completionRevised to 31 Dec 2024 (originally 30 Jun 2021)
- Buildings2 building records
- Documents filed54 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MATOSHREE PARK B2 | NA | 5 | 0 | 0 | 0 | 0 |
| MATOSHREE PARK B5 | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 6 Jan 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 95%.
MATOSHREE PARK B255%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 70% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 30% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 5% |
MATOSHREE PARK B565%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 70% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 30% |
| Sanitary Fittings within the flats / premises | 15% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 5% |
Progress on shared amenities17
As on 6 Jan 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 80% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 75% |
| Landscaping & Tree Planting | Yes | 75% |
| Street Lighting | Yes | 95% |
| Community Buildings | Yes | 70% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 70% |
| Solid Waste Management And Disposal | Yes | 70% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | Yes | 50% |
| Fire protection and fire safety requirements | Yes | 95% |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | Yes | 80% |
| Open Parking | Yes | 80% |
| CLUB HOUSE | Yes | 0% |
| SWIMMING POOL | Yes | 0% |
Parking filed2
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| MATOSHREE PARK B2 | 1 | 1 |
| MATOSHREE PARK B5 | 1 | 1 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PRAVIN BHADGAVE |
| Partner | Role in project |
|---|---|
| OM BALAJI BUILDERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoteras per attachtment
Reason as filed by the promoterWe have Real Estate project registered with MahaRERA authority with name “Matoshree Park” vide Certificate No. P52700011040 dated 31/08/2017. Due date for the completion of the project as estimated at the time of the registration is 30/06/2021. We seek extension of one year for due date of completion of the project that is 29/06/2022. Major reasons due to which we seek extension are as follows. 1. COVID-19 PANDEMIC- Unfortunately work is affected and time was wasted due to lockdown and other issues during COVID-19 Pandemic. 2. INDUSTRY SLOW DOWN - As everybody is aware, Real Estate Industry is
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Aug 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Aug 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed54
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: OBB_Form 2 - Sep 22.pdf | 6 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: OBB Form 5 2021.pdf | 5 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: OBB Form 5 2022.pdf | 5 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate SEP 22.pdf | 31 Dec 2022 |
| Certificates of CA (Form 3)File: Form 3 2022.pdf | 31 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 OBB Sep 22.pdf | 30 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: OBB Form 2A March 2022.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: OBB Form 2A March 2022.pdf | 17 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: OBB_sold booked inventory Aug 22.pdf | 17 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: OBB Discoulsure of Sold booked Inventory.pdf | 22 Nov 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 - March 18.pdf | 7 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - March 19.pdf | 7 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FOrm 5 - March 20.pdf | 7 Oct 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: B-2 Building CC-1 of 4.pdf | 25 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: B-2 Building CC-2 of 4.pdf | 25 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: B-2 Building CC-3 of 4.pdf | 25 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: B-2 Building CC-4 of 4.pdf | 25 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: B-5 building CC-1 of 4.pdf | 25 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: B-5 building CC-2 of 4.pdf | 25 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: B-5 building CC-3 of 4.pdf | 25 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: B-5 building CC-4 of 4.pdf | 25 Sep 2021 |
| Declaration about Commencement CertificateFile: OBB CC Declaration.pdf | 24 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: OBB- Form 2A June 19.pdf | 16 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: OBB- Form 2A Sep 19.pdf | 16 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: OBB- Form 2A Dec 19.pdf | 16 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: OBB- Form 2A Jun 20.pdf | 16 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: OBB- Form 2A Sep 20.pdf | 16 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: OBB- Form 2A Dec 20.pdf | 16 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: OBB- Form 2A Mar 21.pdf | 16 Sep 2021 |
| Layout approvalFile: MYSCAN_20170814_0006_B5.pdf | 16 Aug 2017 |
| Layout approvalFile: MYSCAN_20170814_0007_B5.pdf | 16 Aug 2017 |
| Layout approvalFile: MYSCAN_20170814_0012_B2.pdf | 16 Aug 2017 |
| Building plan approvalFile: NA B2.pdf | 16 Aug 2017 |
| Building plan approvalFile: NA B2 1.pdf | 16 Aug 2017 |
| Building plan approvalFile: NA B2 2.pdf | 16 Aug 2017 |
| Building plan approvalFile: NA B2 3.pdf | 16 Aug 2017 |
| Building plan approvalFile: NA B5.pdf | 16 Aug 2017 |
| PAN CardFile: fIRM PAN.pdf | 16 Aug 2017 |
| Copy of the legal title reportFile: B 2 Tilte Certificate-.pdf | 16 Aug 2017 |
| Copy of the legal title reportFile: B-5 Title Certificate-.pdf | 16 Aug 2017 |
| Details of encumbrancesFile: Non Encumbrance .pdf | 16 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20170814_0006_B5.pdf | 16 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20170814_0007_B5.pdf | 16 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20170814_0012_B2.pdf | 16 Aug 2017 |
| Building Plan Approval (IOD)File: NA B2.pdf | 16 Aug 2017 |
| Building Plan Approval (IOD)File: NA B2 1.pdf | 16 Aug 2017 |
| Building Plan Approval (IOD)File: NA B2 2.pdf | 16 Aug 2017 |
| Building Plan Approval (IOD)File: NA B2 3.pdf | 16 Aug 2017 |
| Building Plan Approval (IOD)File: NA B5.pdf | 16 Aug 2017 |
| Declaration in FORM BFile: Form B.pdf | 16 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 16 Aug 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 16 Aug 2017 |
| Certificates of CA (Form 3)File: Form 3 .pdf | 16 Aug 2017 |
| Proforma of Allotment letterFile: Declaration .pdf | 16 Aug 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Satara
Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 54 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep MATOSHREE PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mhasave1,100+ in Satara
ABHINAV RESIDENCY
ABHINAV BUILDERS AND DEVELOPERS
SAI VISHWA RESIDENCY
DATTATRAY DINKAR CHAVAN
Shiv Palace
Kasa Builder & Contractor
PRADHAN MANTRI AWAS YOJANA SATARA PHASE I
SATARA MUNICIPAL COUNCIL SATARA
LANDMARK TOWERS
KANGRALKAR INFRASTRUCTURE
Dois Hill
Vinay Ashok Chugera
See every Satara project, with the district possession charts
Builder: OM BALAJI BUILDERS
OM BALAJI BUILDERS has 1 registration on MahaRERA, including MATOSHREE PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.
Frequently asked questions
What does it mean that MATOSHREE PARK shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if MATOSHREE PARK is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MATOSHREE PARK?
The registered promoter entity is OM BALAJI BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MATOSHREE PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MATOSHREE PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MATOSHREE PARK?
The professionals named in the filing: Architect: PRAVIN BHADGAVE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MATOSHREE PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback