Matoshree Nisarg Tower A
By Matoshree Infrastructure Private Limited
RG-MH-26282 · RERA P51800005541 · Last updated on MahaRERA portal: 28 Sep 2022
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 16 months past the filed date
- 43 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Matoshree Nisarg Tower A is a Residential / Group Housing project by Matoshree Infrastructure Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800005541 on 11 Aug 2017. Possession was promised by 30 Jun 2025 and is now 16 months past that date. 43 complaints are on record with the regulator.
At a glance
Project
- NameMatoshree Nisarg Tower A
- TypeResidential / Group Housing
- Location
- Mithagar Road
- Kurla
- Mumbai Suburban
- 400081
- Pincode400081
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800005541
- ReraGenie IDRG-MH-26282
Builder
- NameMatoshree Infrastructure Private Limited
- Entity typeCompany
- ChairpersonRajan Ganesh Shirodkar
- Managing DirectorShirish Gunwant Sawant
- Other registrations2 more →
- Completed2 of 3
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on11 Aug 2017
- Promised completion30 Jun 2025
- Revised completionNone
- Buildings1 building record
- Documents filed89 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Matoshree Nisarg Tower A | NA | 34 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 Sep 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 90%.
Matoshree Nisarg Tower A: 53% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 30% |
| Plinth | 100% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 55% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 35% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 28 Sep 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 20% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed501
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ganesh Shenoy |
| Architect | Shashikant Jadhav |
| Partner | Role in project |
|---|---|
| Matoshree Infrastructure Private Limited | - |
Complaints filed with MahaRERA43
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000100589 | Ramesh Govind Kanake | Matoshtree Infrastructure Private LImited | 21/08/2019 |
| CC006000000192311 | Apurva Kadam | Matoshree Nisarg | 27/01/2020 |
| CC006000000195642 | Rahul Ravindra Kulkarni | Matoshree Infrastructure Pvt Ltd | 16/01/2021 |
| CC006000000197520 | Avinash Bhalchandra Yeole | Matoshree Infrastructure Pvt Ltd | 07/07/2021 |
| CC006000000198313 | Mr. Anand Ravindra Pednekar and Mr. Ravindra Pednekar | Matoshree Infrastructure Pvt Ltd | 12/09/2021 |
| CC006000000292811 | Tushar Ramakant Shirwadkar | M/s Matoshree Infrastructure Pvt. Ltd | 29/09/2022 |
| CC006000000303762 | Anita Shinde | Matoshree InfrastructurePvt Ltd | 23/12/2022 |
| CC006000000303763 | Anita Shinde | Matoshree Infrastructure Pvt Ltd | 23/12/2022 |
| CC006000000334076 | Kamlesh Lad | Matoshree Infrastructure Pvt Ltd | 29/01/2023 |
| CC006000000354355 | Siddhesh Charudatt Sangle | MATOSHREE INFRASTRUCTURE PVT. LTD. | 16/02/2023 |
| CC006000000354415 | PRACHI NITIN REVANDKAR | MATOSHREE INFRASTRUCTURE PVT LTD | 18/02/2023 |
| CC006000000354423 | SHRIKANT MUKUND PARADKAR | MATOSHREE INFRASTRUCTURE PVT. LTD. | 19/02/2023 |
| CC006000000354424 | Virendra Mohan Bapardekar | Matoshree Infrastructure Pvt. Ltd. | 19/02/2023 |
| CC006000000354426 | VIPIN VIJAY JAIN | MATOSHREE INFRASTRUCTURE PVT LIMITED | 19/02/2023 |
| CC006000000354433 | Pravin Muktaji Kharat | Matoshree Infrastructure Pvt. Ltd. | 21/02/2023 |
| CC006000000354438 | KAMALAKANT SADASHIV TULSULKAR | MATOSHREE INFRASTRUCTURE PVT LTD | 01/03/2023 |
| CC006000000354495 | uday balkrishna sadadekar | MATOSHREE INFRASTRUCTURE PRIVATE LTD | 25/02/2023 |
| CC006000000354511 | Kala Shashikant Parekh | Matoshree Infrastructure Pvt Ltd | 27/02/2023 |
| CC006000000354515 | Sangeeta Ashok Mane | MATOSHREE INFRASTRUCTURE PVT. LTD. | 26/02/2023 |
| CC006000000354521 | Alaka Vijay Sawant | MATOSHREE INFRASTRUCTURE PVT. LTD. | 27/02/2023 |
| CC006000000364527 | KIRAN DATTATRAYA DESHMUKH | MATOSHREE INFRASTRUCTURE PVT. LTD. | 01/03/2023 |
| CC006000000364551 | Anjali Nilesh Jamdar | Matoshree infrastructure Pvt Ltd | 01/03/2023 |
| CC006000000364695 | Vasant BhAskar Kagalkar | Matoshree Infrastructure Pvt Ltd | 24/03/2023 |
| CC006000000374836 | Pravin Chury | MATOSHREE INFRASTRUCTURE PVT. LTD. | 30/03/2023 |
| CC006000000375041 | Nitin Narvekar | MATOSHREE INFRASTRUCTURE PVT. LTD. | 30/03/2023 |
| CC006000000375277 | KAMLESH HANUMANT ACHAREKAR | MATOSHREE INFRASTRUCTURE PVT. LTD. | 01/05/2023 |
| CC006000000385423 | Datta Sakharam Kate | Matoshree Infrastructure Pvt Ltd | 27/04/2023 |
| CC006000000395712 | SUJATA NARENDRA JOSHI | MATOSHREE INFRASTRUCTURE PVT LTD | 10/05/2023 |
| CC006000000396176 | PRAMOD PABREKAR | MATOSHREE INFRASTRUCTURE PRIVATE LIMITED | 23/06/2023 |
| CC006000000396834 | Prasad Vasant Sawant | Matoshree Infrastructure Private Limited | 31/07/2023 |
| CC006000000397129 | Umesh Kokate | MATOSHREE INFRASTRUCTURE PRIVATE LIMITED | 21/08/2023 |
| CC006000000397933 | Sarang Manohar Dani | MATOSHREE INFRASTRUCTURE PRIVATE LIMITED | 01/11/2023 |
| CC006000000397934 | Arti Sarang Dani | MATOSHREE INFRASTRUCTURE PRIVATE LIMITED | 30/10/2023 |
| CC006000000429498 | Shrikrishna Hirba Dalvi | Matoshree Infratsructure Private Limited | 08/03/2024 |
| CC006000000480003 | SHRIKANT MANOHAR GAJENDRAGADKAR | Matoshree Infratsructure Private Limited | 08/05/2024 |
| CC006000000480005 | Ujwala Shrikant gajendragadkar | Matoshree Infratsructure Private Limited | 08/05/2024 |
| CC006000000530717 | Matoshree Nisarg Welfare Association | Matoshree Infrastructure Private Limited | 14/06/2024 |
| CC006000000591111 | SHANAND TALEKAR | Matoshree Infratsructure Private Limited | 08/08/2024 |
| CC12600488 | Abhijit Mulay | Matoshree Infrastructure Private Limited | 27/01/2026 |
| CC12600957 | Prasad Vasant Sawant | Matoshree Infrastructure Private Limited | 21/02/2026 |
| CC12600953 | Vasant Kagalkar | Matoshree Infrastructure Private Limited | 21/02/2026 |
| CC12601029 | Kala Parekh | Matoshree Infrastructure Private Limited | 25/02/2026 |
| CC12601030 | Tushar Shirwadkar | Matoshree Infrastructure Private Limited | 25/02/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Oct 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 20 Jun 2022
Documents filed89
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Other - TechnicalFile: MIPL.pdf | 28 Sep 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Jeevan Nagar 14th part Occupation certificate.pdf | 20 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA FORM 5 MIPL-.pdf | 26 Aug 2021 |
| Details of encumbrancesFile: Index II - Mortgage Deed Jeevan Nagar.pdf | 19 Feb 2021 |
| Details of encumbrancesFile: Index-II Mortgage Deed 2013.pdf | 19 Feb 2021 |
| Details of encumbrancesFile: Index-II Mortgage Deed 2017.pdf | 19 Feb 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: ca certificate.pdf | 21 Nov 2020 |
| Certificates of CA (Form 5)File: M NISARG TOWER A.pdf | 11 Apr 2019 |
| Proforma of Allotment letterFile: Agreement for Sale - RERA.pdf | 25 Oct 2018 |
| Building plan approvalFile: 1.pdf | 5 Oct 2018 |
| Building plan approvalFile: 2.pdf | 5 Oct 2018 |
| Building plan approvalFile: 3.pdf | 5 Oct 2018 |
| Building plan approvalFile: 4.pdf | 5 Oct 2018 |
| Building plan approvalFile: 5.pdf | 5 Oct 2018 |
| Building plan approvalFile: 6.pdf | 5 Oct 2018 |
| Building plan approvalFile: 7.pdf | 5 Oct 2018 |
| Building plan approvalFile: 8.pdf | 5 Oct 2018 |
| Building plan approvalFile: 9.pdf | 5 Oct 2018 |
| Building plan approvalFile: 10.pdf | 5 Oct 2018 |
| Building plan approvalFile: 11.pdf | 5 Oct 2018 |
| Building plan approvalFile: 12.pdf | 5 Oct 2018 |
| Building plan approvalFile: 13.pdf | 5 Oct 2018 |
| Building plan approvalFile: 14.pdf | 5 Oct 2018 |
| Building plan approvalFile: 15.pdf | 5 Oct 2018 |
| Building plan approvalFile: 16.pdf | 5 Oct 2018 |
| Building plan approvalFile: 17.pdf | 5 Oct 2018 |
| Building plan approvalFile: 18.pdf | 5 Oct 2018 |
| Building plan approvalFile: 1.pdf | 5 Oct 2018 |
| Building Plan Approval (IOD)File: 1.pdf | 5 Oct 2018 |
| Building Plan Approval (IOD)File: 2.pdf | 5 Oct 2018 |
| Building Plan Approval (IOD)File: 3.pdf | 5 Oct 2018 |
| Building Plan Approval (IOD)File: 4.pdf | 5 Oct 2018 |
| Building Plan Approval (IOD)File: 5.pdf | 5 Oct 2018 |
| Building Plan Approval (IOD)File: 6.pdf | 5 Oct 2018 |
| Building Plan Approval (IOD)File: 7.pdf | 5 Oct 2018 |
| Building Plan Approval (IOD)File: 8.pdf | 5 Oct 2018 |
| Building Plan Approval (IOD)File: 9.pdf | 5 Oct 2018 |
| Building Plan Approval (IOD)File: 10.pdf | 5 Oct 2018 |
| Building Plan Approval (IOD)File: 11.pdf | 5 Oct 2018 |
| Building Plan Approval (IOD)File: 12.pdf | 5 Oct 2018 |
| Building Plan Approval (IOD)File: 13.pdf | 5 Oct 2018 |
| Building Plan Approval (IOD)File: 14.pdf | 5 Oct 2018 |
| Building Plan Approval (IOD)File: 15.pdf | 5 Oct 2018 |
| Building Plan Approval (IOD)File: 16.pdf | 5 Oct 2018 |
| Building Plan Approval (IOD)File: 17.pdf | 5 Oct 2018 |
| Building Plan Approval (IOD)File: 18.pdf | 5 Oct 2018 |
| Building Plan Approval (IOD)File: 1.pdf | 5 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 1.pdf | 5 Oct 2018 |
| Certificates of CA (Form 3)File: Nisarg CA Certificate1.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: Nisarg CA Certificate2.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nisarg ENGINEERS CERTIFICATE.pdf | 30 Jul 2017 |
| Layout approvalFile: Layout plan.pdf | 28 Jul 2017 |
| Building plan approvalFile: 5-14.pdf | 28 Jul 2017 |
| Building plan approvalFile: 3-14.pdf | 28 Jul 2017 |
| Building plan approvalFile: 4-14.pdf | 28 Jul 2017 |
| Building plan approvalFile: 8-14.pdf | 28 Jul 2017 |
| Building plan approvalFile: 6-14.pdf | 28 Jul 2017 |
| Building plan approvalFile: 7-14.pdf | 28 Jul 2017 |
| Building plan approvalFile: 2-14.pdf | 28 Jul 2017 |
| Building plan approvalFile: IOD1.pdf | 28 Jul 2017 |
| Building plan approvalFile: 10-14.pdf | 28 Jul 2017 |
| Building plan approvalFile: 11-14.pdf | 28 Jul 2017 |
| Building plan approvalFile: 9-14.pdf | 28 Jul 2017 |
| Building plan approvalFile: 12-14.pdf | 28 Jul 2017 |
| Building plan approvalFile: 13-14.pdf | 28 Jul 2017 |
| Building plan approvalFile: 14-14.pdf | 28 Jul 2017 |
| PAN CardFile: PAN Card.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: Title Certificate.pdf | 28 Jul 2017 |
| Details of encumbrancesFile: Encumbrance IndexII.pdf | 28 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout plan.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: IOD1.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: 2-14.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: 3-14.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: 4-14.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: 5-14.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: 6-14.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: 7-14.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: 8-14.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: 9-14.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: 10-14.pdf | 28 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 89 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Matoshree Nisarg Tower A on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mithagar Road6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 363 registered projects within 2 km.
Ekvira and Saishakti
Magnaacasa Infrastructures and Realtors Pr
SENROOFS PHASE - III
PIONEER HOUSING
THE ALTEZZA
M/s. VIPL Varasiddhi Infra Project LLP
SUPREMO PHASE I SALVIA D WING
K V BUILDHOME LLP
SUPREMO PHASE II, WING C known as SAKURA
K V BUILDHOME LLP
Aveza Phase 2
Tata Housing Development Company Limited
See every Mumbai Suburban project, with the district possession charts
Builder: Matoshree Infrastructure Private Limited
Matoshree Infrastructure Private Limited has 3 registrations on MahaRERA, including Matoshree Ankur and Matoshree Nandadeep. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that Matoshree Nisarg Tower A shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Matoshree Nisarg Tower A is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Matoshree Nisarg Tower A?
The registered promoter entity is Matoshree Infrastructure Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Matoshree Nisarg Tower A?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Matoshree Nisarg Tower A?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Matoshree Nisarg Tower A?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Matoshree Nisarg Tower A?
The professionals named in the filing: Architect: Ganesh Shenoy; Architect: Shashikant Jadhav. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Matoshree Nisarg Tower A?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback