ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / MATOSHREE NAGAR

Registration lapsed No litigation declared Residential / Group Housing project

MATOSHREE NAGAR

By MATOSHREE SHELTERS (INDIA) PRIVATE LIMITED

RG-MH-45519 · RERA P51700045840 · Last updated on MahaRERA portal: 4 Apr 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
16 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 0%
8 of 47Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

MATOSHREE NAGAR is a Residential / Group Housing project by MATOSHREE SHELTERS (INDIA) PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700045840 on 15 Jun 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 39 of the 47 units on this registration are recorded sold or booked, and 16 of 22 construction stages are filed complete.

At a glance

Project

  • NameMATOSHREE NAGAR
  • TypeResidential / Group Housing
  • Location
    • KALYAN BADLAPUR ROAD
    • AMBERNATH WEST
    • Khuntavali
    • Ambarnath
    • Thane
    • 421501
  • Pincode421501
  • RERA no.P51700045840
  • ReraGenie IDRG-MH-45519

Builder

  • NameMATOSHREE SHELTERS (INDIA) PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsBELA MEHTA, HERALD BORGES, GLADYS BORGES, PRATIMA KAPADIA, ZHEEL MAROLIYA, JINISH KAPADIA
  • ChairpersonDEEPAK KAPADIA
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredJun 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on15 Jun 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed69 files

Current status

83%39 of 47 units booked
100.0%Work done, per cost certificate

Figures as on 4 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 8NA4417017
BUILDING NO 9NA7630030

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 4 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.

BUILDING NO 873%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 973%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 4 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,531 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Aug 2025

Approvals and building plan

Sanctioning authorityAmbernath Municipal Council
Permissible FSI24567.06
Proposed, not sanctioned22,718 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHAYANDER
Estimated costRs 7.48 cr
Cost incurredRs 7.48 cr
Work done100.0%
BuildingWingEstimatedIncurred
BUILDING NO 9NARs 5.20 crRs 5.20 cr
BUILDING NO 8NARs 1.54 crRs 1.54 cr
-NARs 74.81 lakhRs 74.81 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectU K ASSOCIATES
EngineerATUL V KUDTARKAR
Chartered AccountantNEHALI & CO
PartnerRole in project
MATOSHREE SHELTERS (INDIA) PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf4 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf4 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf4 Apr 2026
Withdrawal Update Form 1File: Form 1 Bldg 8 u0026 9.pdf4 Nov 2025
Withdrawal Update Form 2File: Form 2 Bldg 8 u0026 9.pdf4 Nov 2025
Withdrawal Update Form 3File: Signed Form 3.pdf4 Nov 2025
Withdrawal Update Form 1File: Form 1 Bldg 8 u0026 9.pdf18 Sep 2025
Withdrawal Update Form 2File: Form 2 9A-9B 1-Quarter 25 NEW.pdf18 Sep 2025
Withdrawal Update Form 3File: Form 3 NEW.pdf18 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Bld no 8 - 9.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Bld no 8 - 9.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf15 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Sing RERA Form 5 23-24.pdf29 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf12 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf2 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed form 3.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf12 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3.pdf22 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_-_1 (1).pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_-_2 (1).pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Rera Certificate (2).pdf16 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1.pdf13 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2.pdf13 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Signed Form 5 22-23.pdf21 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form_-_2A 22-23.pdf26 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_-_1.pdf25 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_-_2.pdf25 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3.pdf18 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3.pdf19 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Matoshree Shelters.pdf17 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Matoshree shelters.pdf17 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate matoshree.pdf20 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1.pdf14 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer form 2.pdf14 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate form 1.pdf14 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate form 2.pdf14 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate form 3.pdf14 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf11 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: CC LETTER.pdf11 Jun 2022
OtherFile: Collector Thane Final order.pdf11 Jun 2022
OtherFile: LETTER.pdf31 May 2022
Layout approvalFile: MYSCAN_20100101_0003.pdf5 May 2022
Building plan approvalFile: MYSCAN_20100101_0003.pdf5 May 2022
Layout approvalFile: MYSCAN_20100101_0004.pdf5 May 2022
Building plan approvalFile: MYSCAN_20100101_0004.pdf5 May 2022
Layout approvalFile: MYSCAN_20100101_0005.pdf5 May 2022
Building plan approvalFile: MYSCAN_20100101_0005.pdf5 May 2022
Copy of Layout Approval (in case of layout)File: MYSCAN_20100101_0003.pdf5 May 2022
Copy of Layout Approval (in case of layout)File: MYSCAN_20100101_0004.pdf5 May 2022
Copy of Layout Approval (in case of layout)File: MYSCAN_20100101_0005.pdf5 May 2022
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20100101_0003.pdf5 May 2022
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20100101_0004.pdf5 May 2022
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20100101_0005.pdf5 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate_compressed.pdf30 Apr 2022
Copy of the legal title reportFile: FINAL TITLE REPORT.pdf26 Apr 2022
Declaration in FORM BFile: Form B.pdf26 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3.pdf26 Apr 2022
Proforma of Allotment letterFile: Allotment_Letter_Final_Bldg No 8.pdf5 Apr 2022
Proforma of Allotment letterFile: Allotment_Letter_Final_Bldg No 9.pdf5 Apr 2022
CERSAI detailsFile: CERSAI REPORT.pdf14 Feb 2022
Details of encumbrancesFile: no encumbrance self declaration (1).pdf3 Feb 2022
Declaration about Commencement CertificateFile: Form D.pdf3 Feb 2022
PAN CardFile: Matorshree Pancard.pdf22 Jan 2022

How this compares with Thane

83%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MATOSHREE NAGAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBERNATH WEST7,600+ in Thane

Builder: MATOSHREE SHELTERS (INDIA) PRIVATE LIMITED

MATOSHREE SHELTERS (INDIA) PRIVATE LIMITED has 2 registrations on MahaRERA, including MATOSHREE NAGAR and MATOSHREE NAGAR EXCELLENCY BLDG SAPPHIRE A AND BLDG PEARL B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that MATOSHREE NAGAR shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if MATOSHREE NAGAR is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MATOSHREE NAGAR?

The registered promoter entity is MATOSHREE SHELTERS (INDIA) PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MATOSHREE NAGAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MATOSHREE NAGAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MATOSHREE NAGAR?

The professionals named in the filing: Architect: U K ASSOCIATES; Engineer: ATUL V KUDTARKAR; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MATOSHREE NAGAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MATOSHREE NAGAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MATOSHREE NAGAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.