Home / Browse projects / Pune, Maharashtra / Marvel Castella A And B Building

De-registered No litigation declared Residential / Group Housing project

Marvel Castella A And B Building

By MARVEL SIGMA HOMES PRIVATE LIMITED

RG-MH-09533 · RERA P52100002438 · Last updated on MahaRERA portal: 23 Jan 2025

Source: official MahaRERA filing

Red flags

  • De-registered
  • Possession 52 months past the filed date
  • 6 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2022Possession promised52 months past this date
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
31 of 31Units unsoldnot recorded sold or booked
6Complaints at MahaRERAon this registration
Jump to the 40 documents Report an error

Marvel Castella A And B Building is a Residential / Group Housing project by MARVEL SIGMA HOMES PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100002438 on 1 Aug 2017. Possession was promised by 30 Jun 2022 and is now 52 months past that date. 0 of the 31 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete. 6 complaints are on record with the regulator.

At a glance

Project

  • NameMarvel Castella A And B Building
  • TypeResidential / Group Housing
  • Location
    • Balewadi Road
    • Balewadi
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100002438
  • ReraGenie IDRG-MH-09533

Builder

  • NameMARVEL SIGMA HOMES PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorVISHWAJEET SUBHASH JHAVAR
  • Other registrations11 more →
  • Completed5 of 12
  • No longer live6 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

52 months past promisethis monthRegisteredAug 2017PromisedJun 2022

Key facts

Registration and timeline

  • StatusDe-registered
  • Registered on1 Aug 2017
  • Promised completion30 Jun 2022
  • Revised completionNone
  • Buildings2 building records
  • Documents filed40 files

Current status

0%0 of 31 units booked
117.1%Work done, per cost certificate

Figures as on 23 Jan 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA151121021
BNA7510010

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 23 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed62

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots62
Closed/Covered62
BuildingClosed/CoveredTotal
A4242
B2020

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,644 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Jul 2025
LandownerVillageDistrict
RUNAL DEVELOPERSPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI4254.4
Proposed, not sanctioned3,554 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKOREGAON PARK
Estimated costRs 14.12 cr
Cost incurredRs 16.53 cr
Work done117.11%
BuildingWingEstimatedIncurred
ANARs 10.80 crRs 12.87 cr
-NARs 3.32 crRs 3.66 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAHUL MALWADKAR
EngineerRAJESH VASUDEV MANKANI
Chartered AccountantJeevan P Chouhan
PartnerRole in project
MARVEL SIGMA HOMES PRIVATE LIMITED-

Complaints filed with MahaRERA6

Case no.ComplainantRespondentFiled
CC005000000000245Vishal Sharad HarkareMarvel Sigma Homes Private Limited27/10/2017
CC005000000010613RAJANIGANDHA V MUTALIKMARVEL SIGMA HOMES PVT LTD01/12/2017
CC005000000010957Mallappa BirajdarMARVEL SIGMA HOMES PRIVATE LIMITED07/02/2018
CC005000000011629MallikarjunMr Karthik11/06/2018
CC005000000022237MR AMAR AVINASH KAMATMarvel Sigma Homes Private Limited15/11/2018
CC005000000022395PRAGYA SHARMA AND ANKUSH NEMA THROUGH POA SHYAMSUNDER SHARMAM/s Marvel Sigma Homes Pvt Ltd28/12/2018

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Apr 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed40

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1-ARCHITECT CERTIFICATE-31-12-2024.pdf23 Jan 2025
Certificates of CA (Form 3)File: FORM-3-CA CERTIFICATE-31-12-2024.pdf23 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2-NGINEER CERTIFICATE-31-12-2024.pdf23 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-ARCHITECT -31-03-2024.pdf28 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1-ARCHITECT-30-06-2024.pdf28 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1- ARCHITECT-30-09-2024.pdf28 Dec 2024
Certificates of CA (Form 3)File: FORM-3-CA CERTIFICATE-31-03-2024.pdf28 Dec 2024
Certificates of CA (Form 3)File: FORM-3-CA CERTIFICATE-30-06-2024.pdf28 Dec 2024
Certificates of CA (Form 3)File: FORM-3- CA CERTIFICATE-30-09-2024.pdf28 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2-ENGINEER CERTIFICATE-31-03-2024.pdf28 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2-ENGINEER CERTIFICATE-30-06-2024.pdf28 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2- ENGINEER CERTIFICATE-30-09-2024.pdf28 Dec 2024
Disclosure of sold/ booked inventoryFile: DISCLOUSER-SOLD-UNSOLD INVENTARY.pdf28 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A- ENGINEER-QUALITY ASSUREANCE.pdf28 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5- CA-ANNUAL REPORT-11-12-2024.pdf28 Dec 2024
Copy of the legal title reportFile: Cascada Add Title Report.pdf26 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CASTELLA.pdf31 Mar 2018
Layout approvalFile: CASTELLA A, B.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: CASTELLA A, B.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate A B Building.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate A B Building.pdf28 Jul 2017
Certificates of CA (Form 3)File: C A Certificate.pdf28 Jul 2017
Proforma of Allotment letterFile: Allotment Letter and Unit Agreement A B Building.pdf24 Jul 2017
Declaration in FORM BFile: Affidevit A B Building.pdf20 Jul 2017
Building plan approvalFile: 2 pan scan.pdf14 Jul 2017
Building plan approvalFile: 3 pan scan.pdf14 Jul 2017
Building plan approvalFile: 4 pan scan.pdf14 Jul 2017
Building plan approvalFile: 5 pan scan.pdf14 Jul 2017
Building plan approvalFile: 6 pan scan.pdf14 Jul 2017
Layout approvalFile: Layout.pdf14 Jul 2017
PAN CardFile: pan Card.PDF14 Jul 2017
Copy of the legal title reportFile: Title Report.pdf14 Jul 2017
Details of encumbrancesFile: Mortgage Deed Index II.pdf14 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout.pdf14 Jul 2017
Building Plan Approval (IOD)File: 2 pan scan.pdf14 Jul 2017
Building Plan Approval (IOD)File: 3 pan scan.pdf14 Jul 2017
Building Plan Approval (IOD)File: 4 pan scan.pdf14 Jul 2017
Building Plan Approval (IOD)File: 5 pan scan.pdf14 Jul 2017
Building Plan Approval (IOD)File: 6 pan scan.pdf14 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf14 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
MARVEL SUFLAMFINAL PLOT NO 322 GHORPADE PETH PUNE4CompletedSep 2015Aug 2015
MARVEL CRESTFINAL PLOT NO 362 -2 GHORPADI PUNE12CompletedMar 2015Late, Apr 2015

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Marvel Castella A And B Building on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Balewadi13,700+ in Pune

2 kmMarvel Castella A And B Completed 114Lapsed / revoked 42Other 95Dot size: filed unitsN

Filed coordinates, straight-line distance. 251 registered projects within 2 km.

Builder: MARVEL SIGMA HOMES PRIVATE LIMITED

MARVEL SIGMA HOMES PRIVATE LIMITED has 12 registrations on MahaRERA, including MARVEL SERA A,B,C BUILDING and Marvel Kyra A AND B Building. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Marvel Castella A And B Building shows as de-registered on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Marvel Castella A And B Building is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Marvel Castella A And B Building?

The registered promoter entity is MARVEL SIGMA HOMES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Marvel Castella A And B Building?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Marvel Castella A And B Building?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Marvel Castella A And B Building?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Marvel Castella A And B Building?

The professionals named in the filing: Architect: RAHUL MALWADKAR; Engineer: RAJESH VASUDEV MANKANI; Chartered Accountant: Jeevan P Chouhan. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Marvel Castella A And B Building?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Marvel Castella A And B Building. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Marvel Castella A And B Building to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.