Marvel Basilo A AND B Building

By MARVEL SIGMA HOMES PRIVATE LIMITED

RG-MH-09394 · RERA P52100001711 · Last updated on MahaRERA portal: 3 Jun 2026

Source: official MahaRERA filing

Red flags

  • 9 complaints at MahaRERA
  • Completion date moved by 96 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 96 months from the original
7 of 22Construction stages doneacross 2 buildings; furthest along: Stilt Floor, 85%
53 of 92Units unsoldnot recorded sold or booked
9Complaints at MahaRERAon this registration
Jump to the 172 documents Report an error

Marvel Basilo A AND B Building is a Residential / Group Housing project by MARVEL SIGMA HOMES PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100001711 on 29 Jul 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 96 months from the original filing. 39 of the 92 units on this registration are recorded sold or booked, and 7 of 22 construction stages are filed complete. 9 complaints are on record with the regulator.

At a glance

Project

  • NameMarvel Basilo A AND B Building
  • TypeResidential / Group Housing
  • Location
    • Lane No 5
    • Koregaon Park
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411001
  • Pincode411001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100001711
  • ReraGenie IDRG-MH-09394

Builder

  • NameMARVEL SIGMA HOMES PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorVISHWAJEET SUBHASH JHAVAR
  • Other registrations11 more →
  • Completed5 of 12
  • No longer live6 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2017First promiseDec 2019Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Jul 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2019)
  • Buildings2 building records
  • Documents filed172 files

Current status

42%39 of 92 units booked
35.8%Work done, per cost certificate

Figures as on 3 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA222073073
BNA222019019

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 3 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 85%.

A46%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)75%
Plinth100%
Stilt Floor85%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks8%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B44%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)60%
Plinth100%
Stilt Floor100%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed97

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots97
Closed/Covered97
BuildingClosed/CoveredTotal
A9696
B11

Land and ownership5

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,069 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
LandownerVillageDistrict
NAVIN AMARLAL MAKHIJAMumbai CityMumbai City
VIJAY VASUDEV WADHWAMumbai CityMumbai City
RAGHULEELA ESTATE PVT LTDMumbai CityMumbai City
RITU VARSHA ESTATE PVT LTDMumbai CityMumbai City
WADHWA GROUP HOLDING PVT LTDMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI12864.48
Proposed, not sanctioned5,364 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGHOLE ROAD, SHIVAJINAGAR
Estimated costRs 116.69 cr
Cost incurredRs 41.72 cr
Work done35.75%
BuildingWingEstimatedIncurred
ANARs 51.49 crRs 17.80 cr
BNARs 51.49 crRs 17.80 cr
-NARs 13.72 crRs 6.12 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAHUL MALWADKAR
ArchitectCATALYSER DESIGN
EngineerRAJESH VASUDEV MANKANI
Chartered AccountantAKSHAY SUNIL KHANDALE
PartnerRole in project
MARVEL SIGMA HOMES PRIVATE LIMITED-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100005242Dec 2019 → Dec 2020

Reason as filed by the promoterDue to sanction issue

EXT52100011711Dec 2019 → Dec 2027

Reason as filed by the promoterDue to delays caused by material shortages, labor shortages, and insufficient funding, the project has been delayed. However, with the funding now available, we kindly request an extension until 31/12/2027 to complete the project

Complaints filed with MahaRERA9

Case no.ComplainantRespondentFiled
CC005000000011659Mrs. Kamakshi Laxman MataiMarvel Sigma Homes Private Limited21/06/2018
CC005000000043697Ms Sapna ShettyMarvel Dwellings Private Limited now known as Marvel Sigma Homes Private Limited23/11/2019
CC005000000053943SUNIL PARMANAND KEWALRAMANIMARVEL DWELLINGS PVT. LTD.15/01/2020
CC005000000053993Kishore Ghanshyam ChandwanyMarvel Dwellings Private Limited now known as Marvel Sigma Homes Private Limited03/02/2020
CC005000000085589Gauri DalmiaMarvel Sigma Homes Private Limited26/05/2021
CC005000000167348KAMEL MEHTAMARVEL DWELLINGS PVT. LTD.15/07/2022
CC005000000177776SAMEER RAMESH SANGHVIMARVEL DWELLINGS PVT. LTD.07/11/2022
CC12502047Bhavin Dinesh ManekMARVEL SIGMA HOMES PRIVATE LIMITED23/06/2025
CC12502050Rachna Hiren ManekMARVEL SIGMA HOMES PRIVATE LIMITED23/06/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Apr 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed172

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 172 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2022-2023)File: Form 2A 22 - 23.pdf3 Jun 2026
Form 2A (FY 2023-2024)File: Form 2A 23 - 24.pdf3 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A 23 - 24.pdf3 Jun 2026
Withdrawal Update Form 1File: Form 1 - Sep 25.pdf29 May 2026
Withdrawal Update Form 1File: Form 1 - Sep 25.pdf29 May 2026
Withdrawal Update Form 1File: Form 1- June 25.PDF29 May 2026
Withdrawal Update Form 1File: Form 1- June 25.PDF29 May 2026
Withdrawal Update Form 1File: Form 1- June 25.PDF29 May 2026
Withdrawal Update Form 1File: Form 1- June 25.PDF29 May 2026
Withdrawal Update Form 1File: Form 1 - Sep 25.pdf29 May 2026
Withdrawal Update Form 1File: Form 1 - Sep 25.pdf29 May 2026
Withdrawal Update Form 1File: Form 1 - Sep 25.pdf29 May 2026
Withdrawal Update Form 2File: Form 2 - Sep 25.pdf29 May 2026
Withdrawal Update Form 2File: Form 2 - Sep 25.pdf29 May 2026
Withdrawal Update Form 2File: Form 2 - Sep 25.pdf29 May 2026
Withdrawal Update Form 2File: Form 2 - Sep 25.pdf29 May 2026
Withdrawal Update Form 2File: Form 2 - Sep 25.pdf29 May 2026
Withdrawal Update Form 2File: Form 2 - June 2025.PDF29 May 2026
Withdrawal Update Form 2File: Form 2 - Sep 25.pdf29 May 2026
Withdrawal Update Form 2File: Form 2 - Sep 25.pdf29 May 2026
Withdrawal Update Form 2File: Form 2 - Sep 25.pdf29 May 2026
Withdrawal Update Form 3File: Form 3 - Sep 25.PDF29 May 2026
Withdrawal Update Form 3File: Form 3 - Sep 25.PDF29 May 2026
Withdrawal Update Form 3File: Form 3- June 25.PDF29 May 2026
Withdrawal Update Form 3File: Form 3- June 25.PDF29 May 2026
Withdrawal Update Form 3File: Form 3- June 25.PDF29 May 2026
Withdrawal Update Form 3File: Form 3- June 25.PDF29 May 2026
Withdrawal Update Form 3File: Form 3 - Sep 25.PDF29 May 2026
Withdrawal Update Form 3File: Form 3 - Sep 25.PDF29 May 2026
Withdrawal Update Form 3File: Form 3 - Sep 25.PDF29 May 2026
Form 2A (FY 2017-2018)File: Form 2A 17 -18.pdf29 May 2026
Form 2A (FY 2018-2019)File: Form 2A 18 -19.pdf29 May 2026
Form 2A (FY 2019-2020)File: Form 2A 19 - 20.pdf29 May 2026
Form 2A (FY 2020-2021)File: Form 2A 21 - 22.pdf29 May 2026
Form 2A (FY 2021-2022)File: Form 2A 21 - 22.pdf29 May 2026
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)_page-0001.pdf17 Nov 2025
Declaration in FORM BFile: form b.PDF12 Nov 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 mar.pdf12 Nov 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23 - 24.pdf10 Nov 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Basilo_Form-5 FY 2023-24.PDF10 Nov 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: Basilo_Form-5 FY 2024-25.PDF10 Nov 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - June 25.pdf8 Nov 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - Sep 25.pdf8 Nov 2025
Certificates of CA (Form 3)File: Form 3 - June 25.PDF8 Nov 2025
Certificates of CA (Form 3)File: Form 3 - Sep 25.PDF8 Nov 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - June 25.pdf8 Nov 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Sep 25.pdf8 Nov 2025
Disclosure of sold/ booked inventoryFile: Mar 23.pdf8 Nov 2025
Disclosure of sold/ booked inventoryFile: Jun 23.pdf8 Nov 2025
Disclosure of sold/ booked inventoryFile: Sep 23.pdf8 Nov 2025
Disclosure of sold/ booked inventoryFile: Dec 23.pdf8 Nov 2025
Disclosure of sold/ booked inventoryFile: Mar 24.pdf8 Nov 2025
Disclosure of sold/ booked inventoryFile: Jun 24.pdf8 Nov 2025
Disclosure of sold/ booked inventoryFile: Sep 24.pdf8 Nov 2025
Disclosure of sold/ booked inventoryFile: Dec 24.pdf8 Nov 2025
Disclosure of sold/ booked inventoryFile: Mar 25.pdf8 Nov 2025
Disclosure of sold/ booked inventoryFile: Jun 25.pdf8 Nov 2025
Disclosure of sold/ booked inventoryFile: Sep 25.pdf8 Nov 2025
Certificates of CA (Form 3)File: FORM 3- Mar 23.pdf5 Nov 2025
Certificates of CA (Form 3)File: FORM 3- Jun 23.pdf5 Nov 2025
Certificates of CA (Form 3)File: FORM 3- Sep 23.pdf5 Nov 2025
Certificates of CA (Form 3)File: FORM 3- Dec 23.pdf5 Nov 2025
Certificates of CA (Form 3)File: FORM 3- Mar 24.pdf5 Nov 2025
Certificates of CA (Form 3)File: FORM 3- Jun 24.pdf5 Nov 2025
Certificates of CA (Form 3)File: FORM 3- Sep 24.pdf5 Nov 2025
Certificates of CA (Form 3)File: FORM 3- Dec 24.pdf5 Nov 2025
Certificates of CA (Form 3)File: FORM 3- Mar 25.pdf5 Nov 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar 23.pdf31 Oct 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jun 23.pdf31 Oct 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 23.pdf31 Oct 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 23.pdf31 Oct 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar 24.pdf31 Oct 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jun 24.pdf31 Oct 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 24.pdf31 Oct 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 24.pdf31 Oct 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar 25.pdf31 Oct 2025
Disclosure of sold/ booked inventoryFile: 31 Mar 2023.pdf31 Oct 2025
Disclosure of sold/ booked inventoryFile: 30 Jun 2023.pdf31 Oct 2025
Disclosure of sold/ booked inventoryFile: 30 Sep 2023.pdf31 Oct 2025
Disclosure of sold/ booked inventoryFile: 31 Dec 2023.pdf31 Oct 2025

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
MARVEL SUFLAMFINAL PLOT NO 322 GHORPADE PETH PUNE4CompletedSep 2015Aug 2015
MARVEL CRESTFINAL PLOT NO 362 -2 GHORPADI PUNE12CompletedMar 2015Late, Apr 2015

How this compares with Pune

42%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 96 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Marvel Basilo A AND B Building on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Koregaon Park13,700+ in Pune

2 kmMarvel Basilo A AND B BuCompleted 15Lapsed / revoked 30Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 83 registered projects within 2 km.

Builder: MARVEL SIGMA HOMES PRIVATE LIMITED

MARVEL SIGMA HOMES PRIVATE LIMITED has 12 registrations on MahaRERA, including MARVEL SERA A,B,C BUILDING and Marvel Kyra A AND B Building. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Marvel Basilo A AND B Building is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Marvel Basilo A AND B Building?

The registered promoter entity is MARVEL SIGMA HOMES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Marvel Basilo A AND B Building?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Marvel Basilo A AND B Building?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Marvel Basilo A AND B Building?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Marvel Basilo A AND B Building?

The professionals named in the filing: Architect: RAHUL MALWADKAR; Architect: CATALYSER DESIGN; Engineer: RAJESH VASUDEV MANKANI; Chartered Accountant: AKSHAY SUNIL KHANDALE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Marvel Basilo A AND B Building?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Marvel Basilo A AND B Building. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Marvel Basilo A AND B Building to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.