Home / Browse projects / Mumbai Suburban, Maharashtra / MARUTI RESIDENCY

Completed Litigation declared Others project

MARUTI RESIDENCY

By OM CONSTRUCTION

RG-MH-06448 · RERA P51800052504 · Last updated on MahaRERA portal: 20 Mar 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases
  • Completion date moved by 18 months
  • 2 extensions taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Installation of Lifts, 95%
19 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

MARUTI RESIDENCY is a Others project by OM CONSTRUCTION in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052504 on 8 Sep 2023. The registration is recorded completed; possession was promised by 31 Dec 2026. The completion date has moved by 18 months from the original filing. 9 of the 28 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameMARUTI RESIDENCY
  • TypeOthers
  • Location
    • BORIVALI
    • BORIVALI WEST EKSAR
    • Eksar
    • Mumbai Suburban
    • 400103
  • Pincode400103
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800052504
  • ReraGenie IDRG-MH-06448

Builder

  • NameOM CONSTRUCTION
  • Entity typeOthers
  • Named personTARUN DAVE
  • Other registrations4 more →
  • Completed2 of 5

Key dates

this monthRegisteredSep 2023First promiseJun 2025Revised toDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Sep 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed75 files

Current status

32%9 of 28 units booked
72.5%Work done, per cost certificate

Figures as on 20 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MARUTI RESIDENCYNA161527128

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

MARUTI RESIDENCY: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 20 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered1
Open Space1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area513 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jun 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1522.99
Proposed, not sanctioned1,523 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSAFFRON SHUBH JIVAN CIRCLE HOLY CROSS ROAD I C COLONY BORIVALI WEST MUMBAI 400103
Estimated costRs 17.88 cr
Cost incurredRs 12.95 cr
Work done72.47%
BuildingWingEstimatedIncurred
MARUTI RESIDENCYNARs 8.94 crRs 6.48 cr
-NARs 8.94 crRs 6.48 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDivyesh Parekh
EngineerPinnacle Project Management Services
Chartered AccountantShah Sanghavi & Co.
Chartered AccountantA K Anand & Co
Chartered AccountantD R Yadav & Co
Chartered AccountantHiten Dedhia & Associates
PartnerRole in project
OM CONSTRUCTION-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA19062501679Jun 2025 → Dec 2025

Reason as filed by the promoterProject Name: MARUTI RESIDENCY RERA Registration No.: P51800052504 Respected Sir/Madam, We respectfully submit this explanatory note in connection with our application for extension of the above-mentioned project registration. The project has experienced delays primarily due to the slow sale of flats/units, which impacted the cash flow and, consequently, the pace of construction and development. Despite our continuous efforts, market conditions remained challenging over the last few quarters, affecting our ability to adhere to the initially projected timeline. We are now witnessing gradual imp

EA15122518673Jun 2025 → Dec 2026

Reason as filed by the promoterWe, OM CONSTRUCTION, hereby declare the following with respect to the project “MARUTI RESIDENCY” bearing registration number P51800052504 registered under MahaRERA 1. Status of Work Completed: We are pleased to inform you that we have completed the 100% of RCC (Reinforced Cement Concrete) work for the building. Currently, we are undertaking the finishing work, which includes plastering, flooring, electrical fittings, and other essential internal and external works. 2. Expected Timeline for Completion: We are committed to completing all balance works and applying for the Occupation Certificate

Litigation declared3

CaseCourtStatus
1015/2023/2023CIVIL COURT DINDOSHISUIT IS PENDING
CIVIL SUIT/0001735/2022/2022CITY CIVIL COURTPENDING
250 OF 2022/2022SPECIAL DISTRICT MAGISTRATEPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 May 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OCC Approved 16-03-2026.pdf20 Mar 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 as on December 2025.pdf20 Jan 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 as on December 2025.pdf20 Jan 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 as on December 2025.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1 June 2025 11.pdf18 Nov 2025
Withdrawal Update Form 1File: Withdrawal Application Form1 as on September 2025.pdf18 Nov 2025
Withdrawal Update Form 2File: Form 2 June 2025.pdf18 Nov 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 as on September 2025.pdf18 Nov 2025
Withdrawal Update Form 3File: Form 3 June 2025.pdf18 Nov 2025
Withdrawal Update Form 3File: Withdrawal Application Form3 as on September 2025.pdf18 Nov 2025
Form 1File: Form 1 March 2025.pdf19 Jun 2025
Form 2File: Form 2 for March 2025 Final.pdf19 Jun 2025
Form 3File: Form 3 March 2025 Latest.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: Circular 29.pdf19 Jun 2025
Withdrawal Update Form 1File: Form 1 March 2025.pdf19 Jun 2025
Withdrawal Update Form 2File: Form 2 for March 2025 Final.pdf19 Jun 2025
Withdrawal Update Form 3File: Form 3 March 2025 Latest.pdf19 Jun 2025
Form 2A (FY 2023-2024)File: Form 2A 23-24.pdf19 Jun 2025
Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf19 Jun 2025
Form 5 (FY 2023-2024)File: Form 5 as on 23-24.pdf19 Jun 2025
Form 5 (FY 2024-2025)File: Form 5 as on 24-25.pdf19 Jun 2025
Layout approvalFile: Amended Approval om construction.pdf2 May 2025
Copy of Layout Approval (in case of layout)File: Amended Approval om construction.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA 8.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (1)_compressed.pdf23 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: PINNACLE PROJECT MANAGEMENT SERVICES_compressed.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3- OM CONSTRUCTION - 1.pdf20 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Adobe Scan 17 Dec 2024 (1).pdf18 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form no 3 CA certificate oct 24.pdf16 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: 2392785_FurtherCC_signed (2).pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 1st Jan -31st March 2024.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 April- June 2024.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1Oct - Dec 2023.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 July - Sep 2024.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Oct - Dec 2023.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 July - sep 2024.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March - Jun 2024.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 April - June 2024.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 July - Sep 2024.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 July - Sep 2024.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jan - March 2024.pdf14 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Jan - March 2024.pdf14 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A 1st Oct 2023.pdf14 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A July - Sep 2024.pdf14 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A Oct - Dec.pdf14 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A April - June 2024.pdf14 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A July 1st 2023.pdf14 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: 2392785_FurtherCC_signed (1).pdf18 Oct 2023
Details of encumbrances concerned to FinanceFile: Adobe Scan 29 Aug 2023.pdf29 Aug 2023
Details of encumbrances concerned to LegalFile: Adobe Scan 29 Aug 2023.pdf29 Aug 2023
Details of encumbrances concerned to FinanceFile: Final finance .pdf23 Aug 2023
Details of encumbrances concerned to LegalFile: Final finance .pdf23 Aug 2023
Layout approvalFile: 1 Copy of Layout Approval (in case of layout)-2.pdf3 Aug 2023
Layout approvalFile: 2 Copy of Layout Approval (in case of layout).pdf3 Aug 2023
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf3 Aug 2023
PAN CardFile: 1 PAN Card.pdf3 Aug 2023
Copy of the legal title reportFile: 1 Copy of the legal title report.pdf3 Aug 2023
Details of encumbrances concerned to FinanceFile: LEGAL ENCU.pdf3 Aug 2023
Details of encumbrances concerned to LegalFile: LEGAL ENCU.pdf3 Aug 2023
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout)-2.pdf3 Aug 2023
Copy of Layout Approval (in case of layout)File: 2 Copy of Layout Approval (in case of layout).pdf3 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf3 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development.pdf3 Aug 2023
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate.pdf3 Aug 2023
Declaration in FORM BFile: 1 Declaration in FORM B.pdf3 Aug 2023
CERSAI detailsFile: 1 CERSAI details.pdf3 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf3 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations.pdf3 Aug 2023
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf3 Aug 2023
Proforma of Allotment letterFile: 1 Proforma of Allotment letter.pdf3 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow3 Aug 2023
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter.pdf3 Aug 2023
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement.pdf3 Aug 2023
Other - FinanceFile: 1 Other - Finance.pdf3 Aug 2023

How this compares with Mumbai Suburban

32%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 18 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MARUTI RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORIVALI WEST EKSAR6,700+ in Mumbai Suburban

2 kmMARUTI RESIDENCYCompleted 173Lapsed / revoked 101Other 230Dot size: filed unitsN

Filed coordinates, straight-line distance. 504 registered projects within 2 km.

Builder: OM CONSTRUCTION

OM CONSTRUCTION has 5 registrations on MahaRERA, including OM RESIDENCY and MARUTI RESIDENCY. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if MARUTI RESIDENCY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MARUTI RESIDENCY?

The registered promoter entity is OM CONSTRUCTION, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MARUTI RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MARUTI RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MARUTI RESIDENCY?

The professionals named in the filing: Architect: Divyesh Parekh; Engineer: Pinnacle Project Management Services; Chartered Accountant: Shah Sanghavi & Co.; Chartered Accountant: A K Anand & Co; Chartered Accountant: D R Yadav & Co; Chartered Accountant: Hiten Dedhia & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MARUTI RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MARUTI RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MARUTI RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.