Home / Browse projects / Pune, Maharashtra / Maruti Millennium Tower - 1

Completed No litigation declared Commercial project

Maruti Millennium Tower - 1

By Mohanlal Bishnoi Builders and Developers

RG-MH-15268 · RERA P52100023611 · Last updated on MahaRERA portal: 16 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2024Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 164 documents Report an error

Maruti Millennium Tower - 1 is a Commercial project by Mohanlal Bishnoi Builders and Developers in Pune, Maharashtra, registered with MahaRERA as P52100023611 on 20 Dec 2019. The registration is recorded completed; possession was promised by 13 Sep 2024.

At a glance

Project

  • NameMaruti Millennium Tower - 1
  • TypeCommercial
  • Location
    • Baner
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • RERA no.P52100023611
  • ReraGenie IDRG-MH-15268

Builder

  • NameMohanlal Bishnoi Builders and Developers
  • Entity typePartnership
  • PartnersJhamku Mohanlal Bishnoi, Seema Mohanlal Bishnoi, Mohanlal Virmaram Bishnoi, Mohanlal Dharmaji Bishnoi
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredDec 2019PromisedSep 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on20 Dec 2019
  • Promised completion13 Sep 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed164 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Maruti Millenium TowerNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Maruti Millenium Tower: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 16 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed82

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots82
Closed/Covered82

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,913 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
Arjun Maruti NanawareBanerPune
Manjula Narayan NanawareBanerPune
Vishwas Kisan NanawareBanerPune
Prashant Dashrath NanawareBanerPune
Shankar Maruti NanawareBanerPune
Santosh Vithal NanawareBanerPune

Approvals and building plan

Permissible FSI7023.8
Proposed, not sanctioned7,024 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJM Road, Pune, Maharashtra 411001

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Mohanlal Bishnoi Builders and Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Nov 2024

Documents filed164

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 164 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFIACTE PHASE-1.pdf16 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE PHASE-1_compressed.pdf16 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate phase-1.pdf16 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: MBBD-FORM 2A 2022-PHASE 1.pdf16 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: MBBD-FORM 2A 2023-PHASE 1.pdf16 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: MBBD-FORM 2A 2024-PHASE 1.pdf16 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: MBBD-PHASE 1.pdf12 Nov 2024
Layout approvalFile: layout_compressed.pdf6 Nov 2024
Building plan approvalFile: 1.pdf6 Nov 2024
Building plan approvalFile: 2.pdf6 Nov 2024
Building plan approvalFile: 3.pdf6 Nov 2024
Building plan approvalFile: 4.pdf6 Nov 2024
Building plan approvalFile: 5.pdf6 Nov 2024
Building plan approvalFile: 6.pdf6 Nov 2024
Building plan approvalFile: 7.pdf6 Nov 2024
Building plan approvalFile: 8.pdf6 Nov 2024
Building plan approvalFile: 9.pdf6 Nov 2024
Building plan approvalFile: 10.pdf6 Nov 2024
Building plan approvalFile: 11.pdf6 Nov 2024
Building plan approvalFile: 12.pdf6 Nov 2024
Building plan approvalFile: 13.pdf6 Nov 2024
Building plan approvalFile: 14.pdf6 Nov 2024
Building plan approvalFile: 15.pdf6 Nov 2024
Building plan approvalFile: 16.pdf6 Nov 2024
Building plan approvalFile: 17.pdf6 Nov 2024
Building plan approvalFile: 18.pdf6 Nov 2024
Building plan approvalFile: 19.pdf6 Nov 2024
Building plan approvalFile: 20.pdf6 Nov 2024
Building plan approvalFile: 21.pdf6 Nov 2024
Building plan approvalFile: 22.pdf6 Nov 2024
Copy of Layout Approval (in case of layout)File: layout_compressed.pdf6 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: ARCHITECT CERTIFICATE-PHASE 1.pdf6 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: cc 1.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 22.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 21.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 20.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 19.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 18.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 17.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 16.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 15.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 14.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 13.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 12.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 9.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 11.pdf6 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ARCHITECT CERTIFICATE-PHASE 1.pdf6 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: o c.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MMT 1.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate MMT 1_compressed.pdf14 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cerificate Q3.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Phase Q3.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3_compressed.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arct Certificate Ph-1.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate MBBD Tower.pdf17 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MMT CA Certificate.pdf17 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Phase 1 FY 22-23.pdf13 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Phase 1.pdf17 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Phase 1.pdf17 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Phase 1_compressed (1).pdf17 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Phase 1 FY 20-21.pdf17 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Phase 1 FY 21-22.pdf17 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf20 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf20 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf20 Oct 2022
Building plan approvalFile: 6-17 - 4th-7th-8th-9th Floor.pdf6 Sep 2022
Building plan approvalFile: 7-17 - 5th Floor.pdf6 Sep 2022
Building plan approvalFile: 8-17 - 6th - Refuge Floor.pdf6 Sep 2022
Building plan approvalFile: 9-17 - 10th - Refuge Floor.pdf6 Sep 2022
Building plan approvalFile: 1-17 - Plot Layout_compressed.pdf6 Sep 2022
Building plan approvalFile: 2-17 - LMU-2nd Floor Parking.pdf6 Sep 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Maruti Millennium Tower - 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Baner13,700+ in Pune

Builder: Mohanlal Bishnoi Builders and Developers

Mohanlal Bishnoi Builders and Developers has 2 registrations on MahaRERA, including Maruti Millennium Tower - 1 and Maruti Millennium Tower -2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Maruti Millennium Tower - 1 is delayed beyond 13 Sep 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Maruti Millennium Tower - 1?

The registered promoter entity is Mohanlal Bishnoi Builders and Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Maruti Millennium Tower - 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Maruti Millennium Tower - 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Maruti Millennium Tower - 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Maruti Millennium Tower - 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Maruti Millennium Tower - 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.