ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / MARQUIS RESIDENCES PHASE 1

Completed No litigation declared Commercial project

MARQUIS RESIDENCES PHASE 1

By EMBASSY ENTERPRISES

RG-MH-05329 · RERA P51800050800 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
5 of 10Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 144 documents Report an error

MARQUIS RESIDENCES PHASE 1 is a Commercial project by EMBASSY ENTERPRISES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050800 on 3 May 2023. The registration is recorded completed; possession was promised by 31 Dec 2027. 5 of the 10 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameMARQUIS RESIDENCES PHASE 1
  • TypeCommercial
  • Location
    • OFF CHINCHOLI BUNDER ROAD
    • MALAD WEST
    • Greater Mumbai (M Corp.) (Part) (802794)
    • Mumbai
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800050800
  • ReraGenie IDRG-MH-05329

Builder

  • NameEMBASSY ENTERPRISES
  • Entity typePartnership
  • GSTIN27AANFH1852J1Z3
  • PartnersCHETAN DALICHAND SHAH, RAMESH BHOJRAJ GURNANI, SONIA RAMESH GURNANI, SANJAY DALICHAND SHAH, GOYAM HOLDINGS LIMITED NA NA
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredMay 2023PromisedDec 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 May 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed144 files

Current status

50%5 of 10 units booked
100.0%Work done, per cost certificate

Figures as on 21 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA2201010

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

WING A: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed22

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots22
Closed/Covered22

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,596 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on3 Sep 2024

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI783.51
Proposed, not sanctioned784 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMALAD WEST MUMBAI
Estimated costRs 9.30 cr
Cost incurredRs 9.30 cr
Work done100.0%
BuildingWingEstimatedIncurred
WING ANARs 8.84 crRs 8.84 cr
-NARs 46.51 lakhRs 46.51 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s. DP ASSOCIATES Mr. Priyank Bhatt/ Mr. Devang Mody
ArchitectD P ASSOCIATES
EngineerMr. Jinesh Ashok Choksi
EngineerJINESH A CHOKSI
Chartered AccountantSHRADHA VATSAL SHAH
Chartered AccountantPOONAM RATAN MURARKA
PartnerRole in project
EMBASSY ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed144

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 144 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: PART OC CERTIFICATE.pdf21 May 2026
Layout approvalFile: CLARIFICATION AND EMBASSY AMENDED PLAN REVISED.pdf12 May 2026
Form 2A (FY 2023-2024)File: QUALITY CERTIFICATE FY 23-24.pdf12 May 2026
Form 2A (FY 2024-2025)File: QUALITY ASSURANCE CERTIFICATE PHASE-1 24-25.pdf12 May 2026
Layout approvalFile: EMBASSY AMENDED PLAN REVISED.pdf24 Apr 2026
Building plan approvalFile: EMBASSY AMENDED PLAN REVISED.pdf24 Apr 2026
Form 2A (FY 2025-2026)File: QUALITY ASSURANCE CERTIFICATE PHASE-1.pdf16 Apr 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE PHASE-1.pdf14 Apr 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE.pdf14 Apr 2026
Withdrawal Update Form 3File: CA CERTIFICATE PHASE 1.pdf14 Apr 2026
Withdrawal Update Form 1File: PHASE-1 ARCHITECT CERTIFICATE.pdf17 Jan 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE PHASE -1.pdf17 Jan 2026
Withdrawal Update Form 3File: PHASE-1 CA CERTIFICATE.pdf17 Jan 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf16 Oct 2025
Withdrawal Update Form 2File: ENGINEERING CERTIFICATE.pdf16 Oct 2025
Withdrawal Update Form 3File: CA CERTIFICATE.pdf16 Oct 2025
Form 1File: ARCHITECT CERTIFICATE PHASE 1.pdf28 Aug 2025
Form 2File: ENGINEER CERTIFICATE PHASE-1.pdf28 Aug 2025
Form 3File: CACERTIFICATE PHASE-1 (1).pdf28 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD IVENTORY PHASE-1.pdf28 Aug 2025
Form 1File: ARCHITECTS CERTIFICATE PHASE 1 30092024.pdf28 Aug 2025
Form 2File: ENGINEER CERTIFICATE PHASE-1.pdf28 Aug 2025
Form 3File: CA CERTIFICATE PHASE 1.pdf28 Aug 2025
Disclosure of Sold and Booked InventoryFile: PHASE-1 INVENTORY.pdf28 Aug 2025
Form 1File: ARCHITECT CERTIFICATE PHASE 1.pdf28 Aug 2025
Form 2File: ENGINNER CERTIFICATE PHASE-I.pdf28 Aug 2025
Form 3File: CA CERTIFICATE PHASEI.pdf28 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED UNSOLD INVENTORY.pdf28 Aug 2025
Form 1File: ARCHITECTS CERTIFICATE.pdf28 Aug 2025
Form 2File: ENGINEER CERTIFICATE.pdf28 Aug 2025
Form 3File: CA CERTIFICATE PHASE.pdf28 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTERY.pdf28 Aug 2025
Form 1File: ARCHITECTS CERTIFICATE PHASE - I.pdf28 Aug 2025
Form 2File: PHASE-I ENGINEER CERTIFICATE.pdf28 Aug 2025
Form 3File: CA CERTIFICATE PHASE 1.pdf28 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY PHASE 1 30122023.pdf28 Aug 2025
Form 1File: ARCHITECTS CERTIFICATE PHASE - I.pdf28 Aug 2025
Form 2File: ENGINEER CERTIFICATE PHASE-I.pdf28 Aug 2025
Form 3File: CA CERTIFICATE PHASE 1.pdf28 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE PHASE-I.pdf28 Aug 2025
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE PHASE - 1.pdf21 Jul 2025
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE PHASE - 1.pdf21 Jul 2025
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE PHASE - 1.pdf21 Jul 2025
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE PHASE - 1.pdf21 Jul 2025
Withdrawal Update Form 3File: CACERTIFICATE PHASE-1.pdf21 Jul 2025
Withdrawal Update Form 3File: CACERTIFICATE PHASE-1.pdf21 Jul 2025
Withdrawal Update Form 1File: ARCHITECTS CERTIFICATE PHASE 1.pdf16 Jul 2025
Withdrawal Update Form 1File: ARCHITECTS CERTIFICATE PHASE 1.pdf16 Jul 2025
Withdrawal Update Form 2File: ENGINEER CERTIFICATE PHASE-1.pdf16 Jul 2025
Withdrawal Update Form 2File: ENGINEER CERTIFICATE PHASE-1.pdf16 Jul 2025
Withdrawal Update Form 3File: CA CERTIFICATE PHASE 1.pdf16 Jul 2025
Withdrawal Update Form 3File: CA CERTIFICATE PHASE 1.pdf16 Jul 2025
Withdrawal Update Form 1File: ARCHITECTS CERTIFICATE PHASE 1.pdf15 Jul 2025
Withdrawal Update Form 1File: ARCHITECTS CERTIFICATE PHASE 1.pdf15 Jul 2025
Withdrawal Update Form 2File: ENGINEER CERTIFICATE PHASE-1.pdf15 Jul 2025
Withdrawal Update Form 2File: ENGINEER CERTIFICATE PHASE-1.pdf15 Jul 2025
Withdrawal Update Form 3File: CA CERTIFICATE PHASE 1.pdf15 Jul 2025
Withdrawal Update Form 3File: CA CERTIFICATE PHASE 1.pdf15 Jul 2025
Form 5 (FY 2024-2025)File: FORM 5.pdf11 Jul 2025
Withdrawal Update Form 1File: ARCHITECTS CERTIFICATE PHASE - 1.pdf27 May 2025
Withdrawal Update Form 2File: ENGINEER CERTIFICATE PHASE-1 (2).pdf27 May 2025
Withdrawal Update Form 3File: CA CERTIFICATE phase 1.pdf27 May 2025
Form 1File: ARCHITECTS CERTIFICATE PHASE - 1.pdf23 May 2025
Form 2File: ENGINEER CERTIFICATE PHASE-1 (2).pdf23 May 2025
Form 3File: CA CERTIFICATE phase 1.pdf23 May 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD INVENTORY PHASE-1.pdf23 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY ASSURANCE CERTIFICATE PHASE-1 24-25.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE PHASE - 1.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE phase 1.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE PHASE-1 (2).pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD INVENTORY PHASE-1.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE PHASE 1.pdf8 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CACERTIFICATE PHASE-1 (1).pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE PHASE-1.pdf8 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD IVENTORY PHASE-1.pdf8 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE PHASE 1 30092024.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE PHASE-1.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE PHASE 1.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: PHASE-1 INVENTORY.pdf14 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY CERTIFICATE FY 23-24.pdf14 Oct 2024

How this compares with Mumbai Suburban

50%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MARQUIS RESIDENCES PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALAD WEST6,700+ in Mumbai Suburban

2 kmMARQUIS RESIDENCES PHASECompleted 136Lapsed / revoked 74Other 137Dot size: filed unitsN

Filed coordinates, straight-line distance. 347 registered projects within 2 km.

Builder: EMBASSY ENTERPRISES

EMBASSY ENTERPRISES has 2 registrations on MahaRERA, including MARQUIS RESIDENCES PHASE 2 and MARQUIS RESIDENCES PHASE 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if MARQUIS RESIDENCES PHASE 1 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MARQUIS RESIDENCES PHASE 1?

The registered promoter entity is EMBASSY ENTERPRISES, a partnership as per the filing. Its GSTIN 27AANFH1852J1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MARQUIS RESIDENCES PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MARQUIS RESIDENCES PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MARQUIS RESIDENCES PHASE 1?

The professionals named in the filing: Architect: M/s. DP ASSOCIATES Mr. Priyank Bhatt/ Mr. Devang Mody; Architect: D P ASSOCIATES; Engineer: Mr. Jinesh Ashok Choksi; Engineer: JINESH A CHOKSI; Chartered Accountant: SHRADHA VATSAL SHAH; Chartered Accountant: POONAM RATAN MURARKA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MARQUIS RESIDENCES PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MARQUIS RESIDENCES PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MARQUIS RESIDENCES PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.