ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Marigold B wing

Registered No litigation declared Residential / Group Housing project

Marigold B wing

By Shree Tirupati Greenfield Developers

RG-MH-20603 · RERA P51700004654 · Last updated on MahaRERA portal: 2 Jul 2026

Source: official MahaRERA filing

Red flags

  • 13 complaints at MahaRERA
  • Completion date moved by 66 months
  • 3 extensions taken
  • Rs 20.00 crore secured on the land, in favour of KARUR VYSYA BANK

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedmoved 66 months from the original
1 of 11Construction stages donefurthest along: Basement (if any), 80%
29 of 87Units unsoldnot recorded sold or booked
13Complaints at MahaRERAon this registration
Jump to the 198 documents Report an error

Marigold B wing is a Residential / Group Housing project by Shree Tirupati Greenfield Developers in Thane, Maharashtra, registered with MahaRERA as P51700004654 on 9 Aug 2017. Possession is promised by 30 Jun 2028. The completion date has moved by 66 months from the original filing. 58 of the 87 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete. 13 complaints are on record with the regulator.

At a glance

Project

  • NameMarigold B wing
  • TypeResidential / Group Housing
  • Location
    • THANE
    • Thane (M Corp.)
    • 400607
  • Pincode400607
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700004654
  • ReraGenie IDRG-MH-20603

Builder

  • NameShree Tirupati Greenfield Developers
  • Entity typePartnership
  • GSTIN27ABDFS2863H1Z0
  • PartnerHaresh Gurbux Doulatani
  • Other registrations1 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredAug 2017First promiseDec 2022Revised toJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2017
  • Promised completion30 Jun 2028
  • Revised completionRevised to 30 Jun 2028 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed198 files

Current status

67%58 of 87 units booked

Figures as on 2 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Marigold B WingNA262387087

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 80%.

Marigold B Wing: 36% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor80%
Slabs of Super Structure41%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes70%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed117

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots117
Closed/Covered117

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area450 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofKARUR VYSYA BANK
Secured amountRs 20.00 crore
CERSAI search filedYes
Declared on5 Aug 2026

Approvals and building plan

Sanctioning authorityTHE MUNCIPAL CORPORATION OF THE CITY OF THANE
Permissible FSI7762.66
Proposed, not sanctioned263 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSaurabh CHS, Ground floor, Off Service Road, near Modi Hyundai Showroom, Panchpakhadi, Thane 400602

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManav Consulatants
ArchitectNav Rachna
EngineerR C Tipnis
EngineerVijay Salunke
Chartered AccountantShashank Rajendra Jain
PartnerRole in project
Shree Tirupati Greenfield Developers-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700010878Dec 2022 → Dec 2023

Reason as filed by the promoterWe seek extension under section 6 of the RERA Act for the force majeure situation of COVID 19 pandemic.

EXT51700019211Dec 2022 → Dec 2025

Reason as filed by the promoterWe request for hearing before Hon’ble authority for granting extension of the completion date under Sec.7 (3) of the RERA Act, 2017 (Without Consent) as per order 40 dt. 27/12/2022 Attached documents : 1. Form E 2. Application for Extension - Format B 3. Declaration regarding Complaint 4. Explanatory Note for delay 5. Form B Promoter - Declaration 6. Reason to consider Application without 51 % consent Briefly, following are the reasons for delay in completion of the said Project - i. Project plans repeatedly amended per Thane Municipal Corporation directives. ii. Construction authorized for bu

EA02072621659Dec 2022 → Jun 2028

Reason as filed by the promoterAs per order of the Hon'ble Chairman (MahaRERA) Dated 27/07/2026, we request you kindly to grant us extension till 30/06/2028.

Litigation declared3

CaseCourtStatus
2695/2015High Court MumbaiPending
1562/2012Thane Civil CourtDisposed Of
AT006000000052344/2020Maharashtra Real Estate Appellate TribunalPending

Complaints filed with MahaRERA13

Case no.ComplainantRespondentFiled
CC006000000023686Lily ButlerShree Tirupati Group11/03/2018
CC006000000079219PRAMOD KRISHNA SAILShree Tirupati Greenfield Developers(STG)18/05/2019
CC006000000192971Lily ButlerShree Tirupati Greenfield Developers11/03/2020
CC006000000397766Arun Krishna RMs. Shree Tirupati Greenfield10/10/2023
CC006000000408220Sivaramakrishnan RamnathSTG HOLDING PVT. LTD.21/11/2023
CC006000000429093MANOJ DHALUMAL KOTWANIShree Tirupati Greenfield Developers06/02/2024
CC006000000429134RAJESH NARAINDAR KOTWANIShree Tirupati Greenfield Developers06/02/2024
CC006000000580938Sunita Mukesh SinghM/S. SHREE TIRUPATI GREENFIELD DEVELOPERS28/06/2024
CC006000000591428Naresh Moturam BhojwaniShree Tirupati Greenfield20/08/2024
CC12501487Sachin Vishnu ManeShree Tirupati Greenfield Developers03/05/2025
CC12501808MIHIR KUMAR BASUShree Tirupati Greenfield Developers02/06/2025
CC12501490Gajanan RaneShree Tirupati Greenfield Developers03/05/2025
CC12600345SUNIL CHAVANShree Tirupati Greenfield Developers18/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed198

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 198 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form2A - Marigold 24-25.pdf2 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A- Marigold 25-26.pdf2 Jul 2026
Form 5 (FY 2024-2025)File: Form 5 FY 24-25 marigold.pdf2 Jul 2026
Form 1File: Form 1 Marigold Jun 24.pdf8 Apr 2026
Form 2File: Form 2 Marigold June 24.pdf8 Apr 2026
Form 3File: Form 3 Marigold June 2024.pdf8 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory june 2024.pdf8 Apr 2026
Form 1File: Form 1 Marigold Sept 24.pdf8 Apr 2026
Form 2File: Form 2 marigold Sept 24.pdf8 Apr 2026
Form 3File: Form 3 Sep 24 Marigold.pdf8 Apr 2026
Disclosure of Sold and Booked InventoryFile: Inventory Marigold Sep 2024.pdf8 Apr 2026
Form 1File: Form 1 Marigold Dec 24.pdf8 Apr 2026
Form 2File: Form 2 Marigold Dec 24.pdf8 Apr 2026
Form 3File: Form 3 Marigold Dec 24.pdf8 Apr 2026
Disclosure of Sold and Booked InventoryFile: Inventory Dec 2024.pdf8 Apr 2026
Form 1File: Form 1 Marigold Mar 25.pdf8 Apr 2026
Form 2File: Form 2 Marigold Mar 25.pdf8 Apr 2026
Form 3File: Form 3.pdf8 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Mar 25.pdf8 Apr 2026
Form 1File: Form 1 Marigold Jun 25.pdf8 Apr 2026
Form 2File: Form 2 Marigold Jun25.pdf8 Apr 2026
Form 3File: Form 3 of marigold Jun 25.pdf8 Apr 2026
Disclosure of Sold and Booked InventoryFile: Inventory as at June 2025.pdf8 Apr 2026
Form 1File: Form 1 Marigold Sept 25.pdf8 Apr 2026
Form 2File: Form 2 Marigold Sep25.pdf8 Apr 2026
Form 3File: Form 3.pdf8 Apr 2026
Disclosure of Sold and Booked InventoryFile: Inventory as at Sep 2025.pdf8 Apr 2026
Form 1File: Form 1 Marigold Dec 25.pdf8 Apr 2026
Form 2File: Form 2 Marigold Dec 25.pdf8 Apr 2026
Form 3File: Form 3 Dec 2025.pdf8 Apr 2026
Disclosure of Sold and Booked InventoryFile: Inventory as at Dec 2025.pdf8 Apr 2026
Certificates of CA (Form 3)File: Form 3 Marigold 30092024.pdf15 Mar 2025
Certificates of CA (Form 3)File: Form 3 Marigold 31122024.pdf15 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Marigold Sept24.pdf15 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Marigold Dec 24.pdf15 Mar 2025
Certificates of CA (Form 3)File: Form 3 Marigold Cost Incurred 30062024 - final.pdf30 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Marigold 300624.pdf30 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Marigold Mar 24.pdf5 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SUPERVISORS CERTIFICATE - Marigold New Format Annual 2024.pdf5 Jun 2024
Disclosure of sold/ booked inventoryFile: Disclosure of inventory Marigold.pdf5 Jun 2024
CERSAI detailsFile: Marigold CERSAI_Search_Report.pdf5 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Marigold 31032024.pdf24 May 2024
Certificates of CA (Form 3)File: Form 3 Marigold 31032024_compressed.pdf24 May 2024
Certificates of CA (Form 3)File: Final Form 3 Marigold Dec 23.pdf22 Mar 2024
Certificates of CA (Form 3)File: Marigold Form 3 Mar 23.pdf21 Mar 2024
Certificates of CA (Form 3)File: Marigold Form 3 June 23.pdf21 Mar 2024
Certificates of CA (Form 3)File: Marigold form 3 Sept 23.pdf21 Mar 2024
Certificates of CA (Form 3)File: Final Form 3 Marigold dec 23.pdf21 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 24 Certificates of Engineer (Form 2)(Mandatory for only ongoing project) (1).pdf20 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 25 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf20 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 26 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf20 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 27 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf20 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A -2023.pdf20 Mar 2024
Certificates of CA (Form 3)File: Final Form 3 Marigold 150324.pdf20 Mar 2024
Certificates of CA (Form 3)File: Form - 3 Marigold sept23.pdf20 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Marigold Form 1 Mar 23.pdf16 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 2023 marigold.pdf16 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Marigold Sept 23.pdf16 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Marigold Dec 23.pdf16 Mar 2024
Disclosure of sold/ booked inventoryFile: Marigold Disclosure of invenstory 160324.pdf16 Mar 2024
Certificates of CA (Form 5)File: Form 5 FY 17-18.pdf16 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 FY 18-19.pdf16 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 19-20.pdf16 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 20-21.pdf16 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 21-22.pdf16 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 22-23.pdf16 Mar 2024
Certificates of CA (Form 3)File: Final Form 3 Marigold 31122023.pdf12 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Marigold.pdf12 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Marigold Dec 23.pdf7 Mar 2024
Disclosure of sold/ booked inventoryFile: Marigold Disclosure of invenstory.pdf6 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 for FY 2022-23.pdf1 Feb 2024
Details of encumbrances concerned to FinanceFile: 1 Details of encumbrances.pdf31 Jan 2024
Details of encumbrances concerned to LegalFile: 1 Details of encumbrances.pdf31 Jan 2024
Disclosure of sold/ booked inventoryFile: Marigold Disclosure of invenstory 310124.pdf31 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Marigold Sept 23.pdf30 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Marigold Dec 23.pdf30 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 marigold.pdf25 Jan 2024
Certificates of CA (Form 3)File: Form 3 Marigold signed.pdf25 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Marigold Form 2 sept 2023.pdf21 Oct 2023
Certificates of CA (Form 3)File: Marigold Form - 3_compressed.pdf21 Oct 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Marigold A wingSiddhehwar Gardens Deewanchand Hansraj Compound Kolshet Road Thane west 400607103CompletedDec 2014Late, Sep 2015
JasmineSiddheshwar Gardens Deewanchand Hansraj Compound Kolshet Road Thane West 400607146CompletedMay 2012Late, Jul 2013

How this compares with Thane

67%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 66 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Marigold B wing on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Thane (M Corp.)7,600+ in Thane

2 kmMarigold B wingCompleted 168Lapsed / revoked 58Other 117Dot size: filed unitsN

Filed coordinates, straight-line distance. 343 registered projects within 2 km.

Builder: Shree Tirupati Greenfield Developers

Shree Tirupati Greenfield Developers has 2 registrations on MahaRERA, including Marigold B wing and Daffodil. Its filings disclose 3 earlier MahaRERA projects: declares 0 of 3 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Marigold B wing is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Marigold B wing?

The registered promoter entity is Shree Tirupati Greenfield Developers, a partnership as per the filing. Its GSTIN 27ABDFS2863H1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Marigold B wing?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Marigold B wing?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Marigold B wing?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Marigold B wing?

The professionals named in the filing: Architect: Manav Consulatants; Architect: Nav Rachna; Engineer: R C Tipnis; Engineer: Vijay Salunke; Chartered Accountant: Shashank Rajendra Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Marigold B wing?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Marigold B wing. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Marigold B wing to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.