Registered Litigation declared Residential / Group Housing project

MARATHON NEXWORLD FLORA

By Sunset Spaces Pvt. Ltd.

RG-MH-06225 · RERA P51700052461 · Last updated on MahaRERA portal: 2 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases
  • Rs 22.00 crore secured on the land, in favour of SHRIRAM HOUSING FINANCE LTD, Truhome Finance Ltd

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 75%
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

MARATHON NEXWORLD FLORA is a Residential / Group Housing project by Sunset Spaces Pvt. Ltd. in Thane, Maharashtra, registered with MahaRERA as P51700052461 on 8 Sep 2023. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NameMARATHON NEXWORLD FLORA
  • TypeResidential / Group Housing
  • Location
    • Gavdevi Road
    • Betawade
    • Thane (M Corp.)
    • Thane
    • 400612
  • Pincode400612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700052461
  • ReraGenie IDRG-MH-06225

Builder

  • NameSunset Spaces Pvt. Ltd.
  • Entity typeCompany
  • CINU45202MH2008PTC183011
  • GSTIN27AAFCM9816L1ZW
  • DirectorParmeet Mayur Shah
  • Other registrations1 more →

Key dates

this monthRegisteredSep 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Sep 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed95 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Flora-YNA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 75%.

Flora-Y: 7% average across the applicable activities

ActivityProgress
Excavation75%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Open Space2

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area437 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofSHRIRAM HOUSING FINANCE LTD, Truhome Finance Ltd
Secured amountRs 22.00 crore
CERSAI search filedYes
Declared on1 Jul 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI10636.77
Proposed, not sanctioned9,637 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSharda Pristine Dr Ambedkar Road Vidyavihar

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSantoshkumar Premchandra Dubey
EngineerUrvesh Virendra Mehta
Chartered AccountantP J Jain & Associates
Chartered AccountantPreeti Singh & Co.
PartnerRole in project
Sunset Spaces Pvt. Ltd.-

Litigation declared3

CaseCourtStatus
304/2015/2015ThanePending
304/2015/2015ThaneOngoing
304/2015/2015CivilOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Mar 2026_ Architects Certificate_Flora for RERA.pdf2 Jun 2026
Form 2File: Engineer certificate March 2025 - Flora.pdf2 Jun 2026
Form 3File: Marathon Nexworld Flora CA Certificate March 26_compressed.pdf2 Jun 2026
Disclosure of Sold and Booked InventoryFile: Flora_Disclosure-of-Sold-Inventory 31 March 2026.pdf2 Jun 2026
Form 1File: Flora_Architects Certificate_December 2024.pdf7 Apr 2026
Form 2File: Engineer Certificate Flora Dec 2024.pdf7 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosures_Flora_December 2024.pdf7 Apr 2026
Form 3File: Flora_CA Certificate Dec 2024.pdf7 Apr 2026
Form 1File: Flora_Architect Certificate_September 2024.pdf7 Apr 2026
Form 2File: Flora_Engineer Certificate_September 2024.pdf7 Apr 2026
Form 3File: Flora_CA Certificate_September 2024_compressed.pdf7 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosures_Flora_September 2024.pdf7 Apr 2026
Form 1File: Architect Certificate_Flora_June 2024.pdf7 Apr 2026
Form 2File: Engineer Certificate_Flora_June 2024.pdf7 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosures_Flora_June 2024.pdf7 Apr 2026
Form 3File: CA Certificate_Marathon Nexworld Flora_June 2024_compressed.pdf7 Apr 2026
Form 1File: Architect Certificate_Flora_March 2024.pdf7 Apr 2026
Form 2File: Engineer Certificate_Flora_March 2024.pdf7 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosures_Flora_March 2024.pdf7 Apr 2026
Form 3File: CA Certificate_Flora_March 2024_compressed.pdf7 Apr 2026
Form 1File: Architect Certificate_Flora_December 2023.pdf7 Apr 2026
Form 2File: Eng Flora Dec 23.pdf7 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosures_Flora_December 2023.pdf7 Apr 2026
Form 3File: CA Certificate_Flora_Dec 2023_compressed.pdf7 Apr 2026
Form 1File: 2_June 2025_ Architects Certificate_Flora for RERA.pdf21 Mar 2026
Form 2File: 3_Engineer certificate June 2025 - Flora.pdf21 Mar 2026
Form 3File: 1_Flora_CA Certificate_June 2025_compressed.pdf21 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosures_Flora_June 2025.pdf21 Mar 2026
Form 1File: Dec 2025_ Architects Certificate_Flora for RERA.pdf13 Feb 2026
Form 2File: Engineer certificate December 2025_Flora.pdf13 Feb 2026
Form 3File: CA Certificate - Marathon Nexworld Flora Dec-25_compressed.pdf13 Feb 2026
Disclosure of Sold and Booked InventoryFile: Flora_Disclosure Of Sold-Booked Inventory_Dec 2025.pdf13 Feb 2026
Form 1File: Sept 2025_ Architects Certificate_Flora for RERA.pdf18 Nov 2025
Form 2File: Flora_Engineer Certificate_September 2025.pdf18 Nov 2025
Form 3File: RERA Certificate Flora.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: Flora_Disclosure Of Sold-Booked Inventory_September 2025.pdf18 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Flora_Architects Certificate_December 2024.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Flora_CA Certificate December'2024.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Flora Dec'2024.pdf29 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Flora_FY 2023-24.pdf17 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2(a)_Flora_September 2024.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Flora_Architect Certificate_September 2024.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Flora_CA Certificate_September 2024.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Flora_Engineer Certificate_September 2024.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Marathon Nexworld Flora_June 2024_compressed.pdf11 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality June.pdf10 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Flora_June 2024.pdf25 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Flora_June 2024.pdf25 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate_Flora_June 2024.pdf25 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Flora_June 2024_compressed.pdf25 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Flora_March 2024.pdf19 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Flora new date Eng Cert.pdf19 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2a Flora_compressed.pdf19 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Flora Form2A Dec 2023_compressed.pdf19 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Flora_March 2024_compressed.pdf19 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Flora_Dec 2023_compressed.pdf19 May 2024
Copy of the legal title reportFile: Addendum to Title Report.pdf2 May 2024
Details of encumbrances concerned to FinanceFile: Legal Encumbrance_Flora.pdf2 May 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance Certificate Finance_Flora.pdf2 May 2024
Details of encumbrances concerned to LegalFile: Legal Encumbrance_Flora.pdf2 May 2024
Details of encumbrances concerned to LegalFile: No Encumbrance Certificate Finance_Flora.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FLORA ARCHITECT CERTIFICATE SEP 2023.pdf11 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Flora_December 2023.pdf11 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Flora Sep 23.pdf11 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Flora Dec 23.pdf11 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Flora.pdf11 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Rao Sir NA.pdf14 Aug 2023
Copy of the legal title reportFile: Legal Title for RERA part 1 .pdf2 Aug 2023
Copy of the legal title reportFile: Legal Title for RERA part 2 .pdf2 Aug 2023
CERSAI detailsFile: Cersai Undertaking v2.pdf2 Aug 2023
CERSAI detailsFile: Sunset company on CERSAI_Search_Report_200274017612_For_Debtor_Based_Search_12_07_2023_09_2 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate compressed with name change.pdf2 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in REO.pdf2 Aug 2023
Proforma of Agreement for saleFile: Deviation Highlighted AFS Flora 290723.pdf2 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank account declaration revised.pdf2 Aug 2023
Other - LegalFile: Allotment Letter deviations highlighted NW Flora 290723.pdf2 Aug 2023
Layout approvalFile: Flora Layout approval for RERA.pdf20 Jul 2023
Building plan approvalFile: Flora Building Plans_compressed.pdf20 Jul 2023
Details of encumbrances concerned to FinanceFile: Legal encumberance.pdf20 Jul 2023
Details of encumbrances concerned to FinanceFile: Financial encumberance.pdf20 Jul 2023

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MARATHON NEXWORLD FLORA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Betawade7,600+ in Thane

2 kmMARATHON NEXWORLD FLORACompleted 10Lapsed / revoked 9Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 29 registered projects within 2 km.

Builder: Sunset Spaces Pvt. Ltd.

Sunset Spaces Pvt. Ltd. has 2 registrations on MahaRERA, including MARATHON NEXWORLD NOVA and MARATHON NEXWORLD FLORA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if MARATHON NEXWORLD FLORA is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MARATHON NEXWORLD FLORA?

The registered promoter entity is Sunset Spaces Pvt. Ltd., a company as per the filing. Its CIN U45202MH2008PTC183011 and GSTIN 27AAFCM9816L1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MARATHON NEXWORLD FLORA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MARATHON NEXWORLD FLORA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MARATHON NEXWORLD FLORA?

The professionals named in the filing: Architect: Santoshkumar Premchandra Dubey; Engineer: Urvesh Virendra Mehta; Chartered Accountant: P J Jain & Associates; Chartered Accountant: Preeti Singh & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MARATHON NEXWORLD FLORA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MARATHON NEXWORLD FLORA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MARATHON NEXWORLD FLORA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.