MARATHON NEXWORLD ELARA-1
By MATRIX ENCLAVES PROJECTS DEV. PVT. LTD
RG-MH-09998 · RERA P51700000478 · Last updated on MahaRERA portal: 6 May 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 28 months past the filed date
- 6 complaints at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MARATHON NEXWORLD ELARA-1 is a Residential / Group Housing project by MATRIX ENCLAVES PROJECTS DEV. PVT. LTD in Thane, Maharashtra, registered with MahaRERA as P51700000478 on 18 Jul 2017. Possession was promised by 29 Jun 2024 and is now 28 months past that date. The completion date has moved by 12 months from the original filing. 6 complaints are on record with the regulator.
At a glance
Project
- NameMARATHON NEXWORLD ELARA-1
- TypeResidential / Group Housing
- Location
- Gavdevi Road
- Behind Premier Industries
- Betawade Gaon
- Thane (M Corp.)
- Thane
- 400612
- Pincode400612
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700000478
- ReraGenie IDRG-MH-09998
Builder
- NameMATRIX ENCLAVES PROJECTS DEV. PVT. LTD
- Entity typeCompany
- DirectorKaivalya Chetan Shah
- Other registrations4 more →
- Completed3 of 5
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on18 Jul 2017
- Promised completion29 Jun 2024
- Revised completionRevised to 29 Jun 2024 (originally 30 Jun 2023)
- Buildings1 building record
- Documents filed122 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ELARA | NA | 26 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 97%.
ELARA: 45% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 55% |
| Basement (if any) | 34% |
| Podiums (if any) | 0% |
| Plinth | 34% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 97% |
| Sanitary Fittings within the flats / premises | 16% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 83% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 25% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 6 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 20% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 40% |
| Storm Water Drains | Yes | 30% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed89
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MATRIX ARCHITECTS AND ENGINEERS |
| Partner | Role in project |
|---|---|
| MATRIX ENCLAVES PROJECTS DEV. PVT. LTD | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1) Delay of 2 years in receiving High Rise Committee (HRC) NOC from TMC. When the project was launched, there was no HRC in place in Thane. In the midst of the project, HRC was instituted in Thane and our Commencement Certificate (CC) was reduced from 30 floors to 22 floors and we were told to apply for HRC to build more than 22 floors. And it took 1.5 years to get this HRC, a timeline we had absolutely not budgeted for when we applied for RERA. 2)Huge increase in costs of basic materials like Steel, Aluminium, glass, paint, electrical cables, tiles etc. due to increase in prices of fuel, gas
Complaints filed with MahaRERA6
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000397624 | Satyawan Appaji Ghagare | Marathon Nexworld Elara-1 by Matrix Enclaves Projects Dev. Pvt. Ltd | 29/11/2023 |
| CC006000000408590 | MANOJ SHANKAR BHOSLE | MATRIX ENCLAVES PROJECTS DEVELOPMENTS PVT LTD | 29/12/2023 |
| CC006000000428948 | shyam ram more | marathon realty pvt ltd | 09/03/2024 |
| CC006000000500394 | MATRIX ENCLAVES PROJECT DEVELOPMENT PVT LTD | Lalji Jugal Kishore Dubey | 07/05/2024 |
| CC12603004 | MATRIX ENCLAVES PROJECTS DEV. PVT. LTD | Vishal Vijay Doke | 21/05/2026 |
| CC12603014 | MATRIX ENCLAVES PROJECTS DEV. PVT. LTD | Mayur Vijay Panchal | 21/05/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 26 Apr 2024
Documents filed122
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mar 2025_ Architects Certificate_Elara - 1.pdf | 6 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Elara 1_Engineer Certirficate_March 2025.pdf | 6 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 2024_ Architects Certificate_Elara - 1.pdf | 30 Jan 2025 |
| Certificates of CA (Form 3)File: CA Certificate_Elara 1_December 2024.pdf | 29 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_Elara 1_December 2024.pdf | 29 Jan 2025 |
| Certificates of CA (Form 5)File: Form 5_Elara 1_FY 2023-24.pdf | 7 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Elara 1_FY 2023-24.pdf | 7 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2(a)_Elara 1_September 2024.pdf | 25 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sept 2024_ Architects Certificate_Elara - 1.pdf | 23 Oct 2024 |
| Certificates of CA (Form 3)File: CA Certificate_Elara 1_September 2024.pdf | 23 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_Elara 1_September 2024.pdf | 23 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 2024_ Architects Certificate_Elara - 1.pdf | 10 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_Elara 1_June 2024_compressed.pdf | 10 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A quality June 24 Elara 1.pdf | 10 Aug 2024 |
| Certificates of CA (Form 3)File: CA Certificate_Elara 1_June 2024.pdf | 10 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mar 2024_ Architects Certificate_Elara - 1.pdf | 31 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Elara 1 Eng.pdf | 23 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Elara 1 .pdf | 23 May 2024 |
| Certificates of CA (Form 3)File: CA Certificate_Elara 1_March 24_compressed.pdf | 23 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Nexworld OC.pdf | 26 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 2023_ Architects Certificate_Elara - 1.pdf | 15 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MEPDPL_Engineer Certificate_Elara 1_Dec 2023_compressed.pdf | 15 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Nexworld Form 2A Dec 2023 Elara 1.pdf | 15 Mar 2024 |
| Certificates of CA (Form 3)File: MEPDPL_CA Certificate_Elara 1_Dec 2023_compressed.pdf | 15 Mar 2024 |
| Certificates of CA (Form 5)File: MEPDPL_Form 5_Elara 1.pdf | 14 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: MEPDPL_Form 5_Elara 1.pdf | 14 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Elara 1 Form 2A.pdf | 12 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sept 2023_ Architects Certificate_Elara - 1.pdf | 9 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Elara 1 - Engineer Certificate - Sept 23.pdf | 9 Dec 2023 |
| Certificates of CA (Form 3)File: CA Certificate - Sept 23 - Elara 1_compressed.pdf | 9 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A quality Elara 1.pdf | 27 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 2023_ Architects Certificate_Elara - 1.pdf | 16 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Elara 1 - March 23.pdf | 16 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Elara 1.pdf | 16 Aug 2023 |
| Certificates of CA (Form 3)File: CA Ceritificate - Elara 1 - June 23_compressed.pdf | 16 Aug 2023 |
| Certificates of CA (Form 3)File: CA Certificate - Elara 1 - March 23_compressed.pdf | 6 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Elara 1 Form 2A March 2023.pdf | 24 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mar 2023_ Architects Certificate_Elara - 1.pdf | 24 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Elara 1 Form 2A March 2023.pdf | 24 May 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory disclosure Elara 1.pdf | 10 Apr 2023 |
| Certificates of CA (Form 5)File: Elara 1 Form 5.pdf | 10 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Elara 1 Form 5.pdf | 10 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Elara 1 Signed Form 2A.pdf | 22 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 2022_ Architects Certificate_Elara - 1.pdf | 19 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Elara 1 Eng Cert Dec 2022_compressed.pdf | 19 Feb 2023 |
| Certificates of CA (Form 3)File: Matrix -Rera Elara-1 Cert Dec 22_compressed.pdf | 19 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: marathon nexrorld elara 1 Q1 2019.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: marathon nexworld elara 1 Q2 2019.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: marathon nexworld elara 1 Q3 2019.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: marathon nexworld elara 1 Q4 2020.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: neworld elara 1 Q1 _2020.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: next world elara 1 Q2_2020.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: next world elara 1 Q3_2020.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: marathon nexworld elara 1 Q4 2021.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2022-23 Elara 1 Q1.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 21-22 Elara 1 Q1.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 21-22 Elara 1 Q2.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 21-22 Elara 1 Q3.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 21-22 Elara 1 Q4.pdf | 21 Dec 2022 |
| Declaration about Commencement CertificateFile: Elara 1 2-17-2022 .pdf | 17 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Elara 2019 form 5.pdf | 16 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Elara 2020 form 5.pdf | 16 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Elara 1 Form 5.pdf | 15 Dec 2022 |
| Certificates of CA (Form 3)File: Elara 1_compressed.pdf | 7 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Elara 1 form 2A Sept 2022.pdf | 1 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sept 2022_ Architects Certificate_Elara-1.pdf | 23 Nov 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Elara 1.pdf | 23 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_Elara-1.pdf | 5 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Cert Elara 1 June 2022_compressed.pdf | 2 Aug 2022 |
| Certificates of CA (Form 3)File: CA certificate Elara 1 June 2022_compressed.pdf | 2 Aug 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Elara - 1-compressed.pdf | 7 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Elara - 1_compressed.pdf | 3 May 2022 |
| Certificates of CA (Form 3)File: CA Certificate Elara 1_compressed.pdf | 3 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Elara 1.pdf | 13 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Elara 1 Dec 2021_compressed.pdf | 13 Jan 2022 |
| Certificates of CA (Form 3)File: Elara 1 Dec 2021-compressed.pdf | 13 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Elara 1.pdf | 8 Nov 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Elara1.pdf | 25 Oct 2021 |
| Certificates of CA (Form 3)File: Elara 1 Sept 21_compressed.pdf | 25 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Sept 2021-Elara 1.pdf | 30 Sep 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 122 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep MARATHON NEXWORLD ELARA-1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Betawade Gaon7,600+ in Thane
Filed coordinates, straight-line distance. 87 registered projects within 2 km.
DOSTI PLANET NORTH - SECTOR 3
CHALAMA INFRAPROPERTIES PRIVATE LIMITED
NICE WORLD 1
NICE BUILDERS
CENTRAL PARK
HARMAIN ENTERPRISES
MUKTA GHARONDA
SKYLARK INFRASTRUCTURES
Palm Riveria
YES REALTY
Trinity Paradise Phase 1
Trinity Builders
See every Thane project, with the district possession charts
Builder: MATRIX ENCLAVES PROJECTS DEV. PVT. LTD
MATRIX ENCLAVES PROJECTS DEV. PVT. LTD has 5 registrations on MahaRERA, including MARATHON NEXWORLD AURA-1 and MARATHON NEXWORLD AURA-2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that MARATHON NEXWORLD ELARA-1 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if MARATHON NEXWORLD ELARA-1 is delayed beyond 29 Jun 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MARATHON NEXWORLD ELARA-1?
The registered promoter entity is MATRIX ENCLAVES PROJECTS DEV. PVT. LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MARATHON NEXWORLD ELARA-1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MARATHON NEXWORLD ELARA-1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MARATHON NEXWORLD ELARA-1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MARATHON NEXWORLD ELARA-1?
The professionals named in the filing: Architect: MATRIX ARCHITECTS AND ENGINEERS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MARATHON NEXWORLD ELARA-1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback