MARATHON NEXWORLD AURA-1
By MATRIX ENCLAVES PROJECTS DEV. PVT. LTD
RG-MH-09996 · RERA P51700000652 · Last updated on MahaRERA portal: 6 May 2025
Source: official MahaRERA filing
Red flags
- 29 complaints at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MARATHON NEXWORLD AURA-1 is a Residential / Group Housing project by MATRIX ENCLAVES PROJECTS DEV. PVT. LTD in Thane, Maharashtra, registered with MahaRERA as P51700000652 on 19 Jul 2017. The registration is recorded completed; possession was promised by 29 Dec 2023. The completion date has moved by 12 months from the original filing. 29 complaints are on record with the regulator.
At a glance
Project
- NameMARATHON NEXWORLD AURA-1
- TypeResidential / Group Housing
- Location
- Gavdevi Road
- Behind Premier Industries
- Betawade Gaon
- Thane (M Corp.)
- Thane
- 400612
- Pincode400612
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700000652
- ReraGenie IDRG-MH-09996
Builder
- NameMATRIX ENCLAVES PROJECTS DEV. PVT. LTD
- Entity typeCompany
- DirectorKaivalya Chetan Shah
- Other registrations4 more →
- Completed3 of 5
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on19 Jul 2017
- Promised completion29 Dec 2023
- Revised completionRevised to 29 Dec 2023 (originally 30 Dec 2022)
- Buildings1 building record
- Documents filed130 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AURA | NA | 26 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 92%.
AURA: 46% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 55% |
| Basement (if any) | 37% |
| Podiums (if any) | 0% |
| Plinth | 37% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 88% |
| Sanitary Fittings within the flats / premises | 16% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 92% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 36% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 6 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 20% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 40% |
| Storm Water Drains | Yes | 30% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed197
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MATRIX ARCHITECTS AND ENGINEERS |
| Partner | Role in project |
|---|---|
| MATRIX ENCLAVES PROJECTS DEV. PVT. LTD | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1) Delay of 2 years in receiving High Rise Committee (HRC) NOC from TMC. When the project was launched, there was no HRC in place in Thane. In the midst of the project, HRC was instituted in Thane and our Commencement Certificate (CC) was reduced from 30 floors to 22 floors and we were told to apply for HRC to build more than 22 floors. And it took 1.5 years to get this HRC, a timeline we had absolutely not budgeted for when we applied for RERA. 2) Huge increase in costs of basic materials like Steel, Aluminium, glass, paint, electrical cables, tiles etc. due to increase in prices of fuel, gas
Complaints filed with MahaRERA29
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000480252 | Kamlesh Kumar Tiwari | Matrix Enclave Projects Development Pvt Ltd | 26/04/2024 |
| CC006000000396491 | MR GANESH S YADAV MS DANRAJI S YAADAV | MATRIX ENCLAVES PROJECTS DEVELOPMENT PVT LTD | 11/07/2023 |
| CC006000000396537 | MR KIRAN D CHANDEKAR MRS RUPALI KIRAN CHANDEKAR | MATRIX ENCLAVES PROJECTS DEVELOPMENT PVT LTD | 11/07/2023 |
| CC006000000418660 | VISHWANATH SHANTARAM VICHARE | MARATHON GROUP | 29/12/2023 |
| CC006000000428788 | Aniket Dasharath Tambat | Matrix Rnclave Projects Devllopments Pvt Ltd | 20/05/2024 |
| CC006000000479852 | Mayur Dattatray Diwate | Matrix Enclaves Projects Developments Pvt Ltd | 31/03/2024 |
| CC006000000428926 | Anil Yadav | MATRIX ENCLAVES PROJECTS DEV. PVT. LTD | 21/01/2024 |
| CC006000000429575 | Manoj devtadeen gupta | Marathon | 17/03/2024 |
| CC006000000439646 | Deepanshu Radheshyam Agrawal | Matrix Enclaves Project Development Pvt Ltd | 14/03/2024 |
| CC006000000439684 | DILESWAR PATNAIK | MATRIX ENCLAVES PROJECTS PVT LTD | 16/03/2024 |
| CC006000000439697 | Purvesh Shashikant Alandikar | Matrix Enclaves Projects Developments Pvt Ltd | 29/03/2024 |
| CC006000000439719 | Chetan Shriniwas Chepurwar | Matrix Enclave Projects Development Pvt Ltd | 31/03/2024 |
| CC006000000439727 | Sameer Ashok Shirke | MATRIX ENCLAVES PROJECTS DEV. PVT. LTD | 19/03/2024 |
| CC006000000479848 | SUKHENDRA AMARBAHADUR SINGH | Matrix Enclaves Projects Dev Pvt Ltd | 30/03/2024 |
| CC006000000479867 | JITENDRAPRATAP INDRABAHADUR SINGH | MATRIX ENCLAVE PROJECTS DEVELOPMENTS PRIVATE LIMITED | 31/03/2024 |
| CC006000000479884 | Rajan Durgaprasad Gupta | Matrix Enclaves Projects Developments Pvt. Ltd. | 01/04/2024 |
| CC006000000480071 | Prashant Prakash Mande | Matrix Enclaves Projects Dev. Pvt Ltd. | 17/04/2024 |
| CC006000000480199 | Veeresh Kumar Soni | MATRIX ENCLAVES PROJECTS DEVELOPMENTS PVT LTD | 25/04/2024 |
| CC006000000480200 | Supriya Yashwant Kurhade | Matrix Enclaves Projects Dev. Pvt. Ltd. | 25/04/2024 |
| CC006000000540738 | Chaitanya Potdar | Matrix Enclaves Project development Pvt. ltd | 21/06/2024 |
| CC12400038 | Krishna Budhia Epili | MATRIX ENCLAVES PROJECTS DEV. PVT. LTD | 05/09/2024 |
| CC12400535 | Manoj Devtadeen Devtadeen | MATRIX ENCLAVES PROJECTS DEV. PVT. LTD | 23/10/2024 |
| CC12401152 | VISHWANATH SANKAPPA BANGERA | MATRIX ENCLAVES PROJECTS DEV. PVT. LTD | 17/12/2024 |
| CC12401262 | AkshayKumar Hanmant Pawar | MATRIX ENCLAVES PROJECTS DEV. PVT. LTD | 28/12/2024 |
| CC12500056 | VIJAY KUMAR GIRDHARI LAL GUPTA | MATRIX ENCLAVES PROJECTS DEV. PVT. LTD | 06/01/2025 |
| CC12502726 | MITESH RANCHHODDAS RAJA | MATRIX ENCLAVES PROJECTS DEV. PVT. LTD | 04/08/2025 |
| CC12602989 | MATRIX ENCLAVES PROJECTS DEV. PVT. LTD | Rajesh Dattaram Jadhav | 20/05/2026 |
| CC12603862 | MATRIX ENCLAVES PROJECTS DEV. PVT. LTD | Sumaiya Memon | 22/06/2026 |
| CC12604240 | MATRIX ENCLAVES PROJECTS DEV. PVT. LTD | Sachin Vijay Dalvi | 06/07/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 26 Apr 2024
Documents filed130
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 130 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mar 2025_ Architects Certificate_Aura - 1.pdf | 6 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aura 1_Engineer Certificate_March 2025.pdf | 6 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 2024_ Architects Certificate_Aura - 1.pdf | 30 Jan 2025 |
| Certificates of CA (Form 3)File: CA Certificate_Aura 1_December 2024.pdf | 29 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_Aura 1_December 2024.pdf | 29 Jan 2025 |
| Certificates of CA (Form 5)File: Form 5_Aura 1_FY 2023-24.pdf | 7 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2(a)_Aura 1_September 2024.pdf | 25 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sept 2024_ Architects Certificate_Aura - 1.pdf | 23 Oct 2024 |
| Certificates of CA (Form 3)File: CA Certificate_Aura 1_September 2024.pdf | 23 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_Aura 1_September 2024.pdf | 23 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 2024_ Architects Certificate_Aura - 1.pdf | 10 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_Aura 1_June 2024_compressed.pdf | 10 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A quality June 24 Aura 1.pdf | 10 Aug 2024 |
| Certificates of CA (Form 3)File: CA Certificate_Aura 1_June 2024.pdf | 10 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mar 2024_ Architects Certificate_Aura - 1.pdf | 31 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aura 1 Eng.pdf | 23 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Aura 1.pdf | 23 May 2024 |
| Certificates of CA (Form 3)File: CA Certificate_Aura 1_March 24_compressed.pdf | 23 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Nexworld OC.pdf | 26 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 2023_ Architects Certificate_Aura - 1.pdf | 15 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MEPDPL_Engineer Certificate_Aura 1_Dec 2023_compressed.pdf | 15 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Nexworld Form 2A Dec 2023 Aura 1.pdf | 15 Mar 2024 |
| Certificates of CA (Form 3)File: MEPDPL_CA Certificate_Aura 1_Dec 2023_compressed.pdf | 15 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_ Engg certificate Aura 1 Dec 2023.pdf | 30 Jan 2024 |
| Certificates of CA (Form 3)File: Form 03 Aura-1 Rera Certificate Dec 2023.pdf | 30 Jan 2024 |
| Certificates of CA (Form 5)File: MEPDPL_Form 5_Aura 1.pdf | 14 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: MEPDPL_Form 5_Aura 1.pdf | 14 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Aura 1 Form 2A.pdf | 12 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sept 2023_ Architects Certificate_Aura - 1.pdf | 9 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aura 1 - Engineer Certificate - Sept 23.pdf | 9 Dec 2023 |
| Certificates of CA (Form 3)File: CA Certificate - Sept 23 - Aura 1_compressed.pdf | 9 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A quality Aura 1 .pdf | 27 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 2023_ Architects Certificate_Aura - 1.pdf | 16 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Aura 1 - March 23.pdf | 16 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aura 1.pdf | 16 Aug 2023 |
| Certificates of CA (Form 3)File: CA Certificate - Aura 1 - June 23_compressed.pdf | 16 Aug 2023 |
| Certificates of CA (Form 3)File: CA Certificate - Aura 1 - March 23_compressed.pdf | 6 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mar 2023_ Architects Certificate_Aura - 1.pdf | 24 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Aura 1 Form 2A March 2023.pdf | 24 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: AURA 1Signed Form 2A.pdf | 22 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 2022_ Architects Certificate_Aura - 1.pdf | 19 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aura 1.pdf | 19 Feb 2023 |
| Certificates of CA (Form 3)File: Matrix-Rera Cert Aura-1 Dec 22_compressed.pdf | 19 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: marathon nexworld aura 1 Q1 2019.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: marathon nexworld aura 1 Q2 2019.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: marathon nexworld aura 1 Q3 2019.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: marathon nexworld aura 1 Q4 2020.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: nexworld aura 1 Q1 2020.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: next world aura 1 Q2 _2020.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: next world aura 1 Q3_2020.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: marathon nexworld aura 1 Q4 2021.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2022-23 Aura 1 Q1.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 21-22 Aura 1 Q1.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 21-22 Aura 1 Q2.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 21-22 Aura 1 Q3.pdf | 21 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 21-22 Aura 1 Q4.pdf | 21 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: Aura 1 disclosure on inventory Dec 2022_compressed.pdf | 21 Dec 2022 |
| Declaration about Commencement CertificateFile: Aura 1 12-17-2022 pdf.pdf | 17 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2 Certificates of CA (Form 5) 2019.pdf | 16 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 3 Certificates of CA (Form 5) 2020.pdf | 16 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 4 Certificates of CA (Form 5) 2021.pdf | 16 Dec 2022 |
| Certificates of CA (Form 5)File: Aura 1 Form 5.pdf | 15 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Aura 1 Form 5.pdf | 15 Dec 2022 |
| Certificates of CA (Form 3)File: Aura 1_compressed.pdf | 7 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Aura 1 form 2A Sept 2022.pdf | 1 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sept 2022_ Architects Certificate_Aura - 1.pdf | 23 Nov 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate Sept 2022 - Aura 1.pdf | 23 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_Aura-1.pdf | 5 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Cert Aura 1 June 2022_compressed.pdf | 2 Aug 2022 |
| Certificates of CA (Form 3)File: CA certificate Aura 1 June 2022_compressed.pdf | 2 Aug 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Aura -1_compressed.pdf | 7 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Aura - 1_compressed.pdf | 3 May 2022 |
| Certificates of CA (Form 3)File: CA Cerificate Aura 1_compressed.pdf | 3 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aura 1_compressed.pdf | 13 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aura 1 Dec 2021_compressed.pdf | 13 Jan 2022 |
| Certificates of CA (Form 3)File: Aura 1 Dec 2021_compressed.pdf | 13 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aura 1.pdf | 8 Nov 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aura1.pdf | 25 Oct 2021 |
| Certificates of CA (Form 3)File: Aura 1 Sept 21_compressed.pdf | 25 Oct 2021 |
| Certificates of CA (Form 5)File: Sept 2021-Aura 1.pdf | 30 Sep 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 130 filed documents as one ZIP, foldered, with a manifest
Keep MARATHON NEXWORLD AURA-1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Betawade Gaon7,600+ in Thane
Filed coordinates, straight-line distance. 87 registered projects within 2 km.
DOSTI PLANET NORTH - SECTOR 3
CHALAMA INFRAPROPERTIES PRIVATE LIMITED
NICE WORLD 1
NICE BUILDERS
CENTRAL PARK
HARMAIN ENTERPRISES
MUKTA GHARONDA
SKYLARK INFRASTRUCTURES
Palm Riveria
YES REALTY
Trinity Paradise Phase 1
Trinity Builders
See every Thane project, with the district possession charts
Builder: MATRIX ENCLAVES PROJECTS DEV. PVT. LTD
MATRIX ENCLAVES PROJECTS DEV. PVT. LTD has 5 registrations on MahaRERA, including MARATHON NEXWORLD AURA-1 and MARATHON NEXWORLD AURA-2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if MARATHON NEXWORLD AURA-1 is delayed beyond 29 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MARATHON NEXWORLD AURA-1?
The registered promoter entity is MATRIX ENCLAVES PROJECTS DEV. PVT. LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MARATHON NEXWORLD AURA-1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MARATHON NEXWORLD AURA-1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MARATHON NEXWORLD AURA-1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MARATHON NEXWORLD AURA-1?
The professionals named in the filing: Architect: MATRIX ARCHITECTS AND ENGINEERS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MARATHON NEXWORLD AURA-1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback