Home / Browse projects / Thane, Maharashtra / MARATHON NEXWORLD AURA-1

Completed No litigation declared Residential / Group Housing project

MARATHON NEXWORLD AURA-1

By MATRIX ENCLAVES PROJECTS DEV. PVT. LTD

RG-MH-09996 · RERA P51700000652 · Last updated on MahaRERA portal: 6 May 2025

Source: official MahaRERA filing

Red flags

  • 29 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
1 of 11Construction stages donefurthest along: Staircases, 92%
29Complaints at MahaRERAon this registration
Jump to the 130 documents Report an error

MARATHON NEXWORLD AURA-1 is a Residential / Group Housing project by MATRIX ENCLAVES PROJECTS DEV. PVT. LTD in Thane, Maharashtra, registered with MahaRERA as P51700000652 on 19 Jul 2017. The registration is recorded completed; possession was promised by 29 Dec 2023. The completion date has moved by 12 months from the original filing. 29 complaints are on record with the regulator.

At a glance

Project

  • NameMARATHON NEXWORLD AURA-1
  • TypeResidential / Group Housing
  • Location
    • Gavdevi Road
    • Behind Premier Industries
    • Betawade Gaon
    • Thane (M Corp.)
    • Thane
    • 400612
  • Pincode400612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700000652
  • ReraGenie IDRG-MH-09996

Builder

  • NameMATRIX ENCLAVES PROJECTS DEV. PVT. LTD
  • Entity typeCompany
  • DirectorKaivalya Chetan Shah
  • Other registrations4 more →
  • Completed3 of 5
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredJul 2017First promiseDec 2022Revised toDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on19 Jul 2017
  • Promised completion29 Dec 2023
  • Revised completionRevised to 29 Dec 2023 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed130 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AURANA260000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 92%.

AURA: 46% average across the applicable activities

ActivityProgress
Excavation55%
Basement (if any)37%
Podiums (if any)0%
Plinth37%
Stilt Floor50%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises88%
Sanitary Fittings within the flats / premises16%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.36%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes30%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed197

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots197
Closed/Covered197

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,055 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI14859.19
Proposed, not sanctioned14,359 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTULSIANI CHAMBERS, 1ST FLOOR, NARIMAN POINT, MUMBAI 400021

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMATRIX ARCHITECTS AND ENGINEERS
PartnerRole in project
MATRIX ENCLAVES PROJECTS DEV. PVT. LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700013024Dec 2022 → Dec 2023

Reason as filed by the promoter1) Delay of 2 years in receiving High Rise Committee (HRC) NOC from TMC. When the project was launched, there was no HRC in place in Thane. In the midst of the project, HRC was instituted in Thane and our Commencement Certificate (CC) was reduced from 30 floors to 22 floors and we were told to apply for HRC to build more than 22 floors. And it took 1.5 years to get this HRC, a timeline we had absolutely not budgeted for when we applied for RERA. 2) Huge increase in costs of basic materials like Steel, Aluminium, glass, paint, electrical cables, tiles etc. due to increase in prices of fuel, gas

Complaints filed with MahaRERA29

Case no.ComplainantRespondentFiled
CC006000000480252Kamlesh Kumar TiwariMatrix Enclave Projects Development Pvt Ltd26/04/2024
CC006000000396491MR GANESH S YADAV MS DANRAJI S YAADAVMATRIX ENCLAVES PROJECTS DEVELOPMENT PVT LTD11/07/2023
CC006000000396537MR KIRAN D CHANDEKAR MRS RUPALI KIRAN CHANDEKARMATRIX ENCLAVES PROJECTS DEVELOPMENT PVT LTD11/07/2023
CC006000000418660VISHWANATH SHANTARAM VICHAREMARATHON GROUP29/12/2023
CC006000000428788Aniket Dasharath TambatMatrix Rnclave Projects Devllopments Pvt Ltd20/05/2024
CC006000000479852Mayur Dattatray DiwateMatrix Enclaves Projects Developments Pvt Ltd31/03/2024
CC006000000428926Anil YadavMATRIX ENCLAVES PROJECTS DEV. PVT. LTD21/01/2024
CC006000000429575Manoj devtadeen guptaMarathon17/03/2024
CC006000000439646Deepanshu Radheshyam AgrawalMatrix Enclaves Project Development Pvt Ltd14/03/2024
CC006000000439684DILESWAR PATNAIKMATRIX ENCLAVES PROJECTS PVT LTD16/03/2024
CC006000000439697Purvesh Shashikant AlandikarMatrix Enclaves Projects Developments Pvt Ltd29/03/2024
CC006000000439719Chetan Shriniwas ChepurwarMatrix Enclave Projects Development Pvt Ltd31/03/2024
CC006000000439727Sameer Ashok ShirkeMATRIX ENCLAVES PROJECTS DEV. PVT. LTD19/03/2024
CC006000000479848SUKHENDRA AMARBAHADUR SINGHMatrix Enclaves Projects Dev Pvt Ltd30/03/2024
CC006000000479867JITENDRAPRATAP INDRABAHADUR SINGHMATRIX ENCLAVE PROJECTS DEVELOPMENTS PRIVATE LIMITED31/03/2024
CC006000000479884Rajan Durgaprasad GuptaMatrix Enclaves Projects Developments Pvt. Ltd.01/04/2024
CC006000000480071Prashant Prakash MandeMatrix Enclaves Projects Dev. Pvt Ltd.17/04/2024
CC006000000480199Veeresh Kumar SoniMATRIX ENCLAVES PROJECTS DEVELOPMENTS PVT LTD25/04/2024
CC006000000480200Supriya Yashwant KurhadeMatrix Enclaves Projects Dev. Pvt. Ltd.25/04/2024
CC006000000540738Chaitanya PotdarMatrix Enclaves Project development Pvt. ltd21/06/2024
CC12400038Krishna Budhia EpiliMATRIX ENCLAVES PROJECTS DEV. PVT. LTD05/09/2024
CC12400535Manoj Devtadeen DevtadeenMATRIX ENCLAVES PROJECTS DEV. PVT. LTD23/10/2024
CC12401152VISHWANATH SANKAPPA BANGERAMATRIX ENCLAVES PROJECTS DEV. PVT. LTD17/12/2024
CC12401262AkshayKumar Hanmant PawarMATRIX ENCLAVES PROJECTS DEV. PVT. LTD28/12/2024
CC12500056VIJAY KUMAR GIRDHARI LAL GUPTAMATRIX ENCLAVES PROJECTS DEV. PVT. LTD06/01/2025
CC12502726MITESH RANCHHODDAS RAJAMATRIX ENCLAVES PROJECTS DEV. PVT. LTD04/08/2025
CC12602989MATRIX ENCLAVES PROJECTS DEV. PVT. LTDRajesh Dattaram Jadhav20/05/2026
CC12603862MATRIX ENCLAVES PROJECTS DEV. PVT. LTDSumaiya Memon22/06/2026
CC12604240MATRIX ENCLAVES PROJECTS DEV. PVT. LTDSachin Vijay Dalvi06/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 26 Apr 2024

Documents filed130

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 130 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mar 2025_ Architects Certificate_Aura - 1.pdf6 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aura 1_Engineer Certificate_March 2025.pdf6 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 2024_ Architects Certificate_Aura - 1.pdf30 Jan 2025
Certificates of CA (Form 3)File: CA Certificate_Aura 1_December 2024.pdf29 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_Aura 1_December 2024.pdf29 Jan 2025
Certificates of CA (Form 5)File: Form 5_Aura 1_FY 2023-24.pdf7 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2(a)_Aura 1_September 2024.pdf25 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sept 2024_ Architects Certificate_Aura - 1.pdf23 Oct 2024
Certificates of CA (Form 3)File: CA Certificate_Aura 1_September 2024.pdf23 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_Aura 1_September 2024.pdf23 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 2024_ Architects Certificate_Aura - 1.pdf10 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_Aura 1_June 2024_compressed.pdf10 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A quality June 24 Aura 1.pdf10 Aug 2024
Certificates of CA (Form 3)File: CA Certificate_Aura 1_June 2024.pdf10 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mar 2024_ Architects Certificate_Aura - 1.pdf31 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aura 1 Eng.pdf23 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Aura 1.pdf23 May 2024
Certificates of CA (Form 3)File: CA Certificate_Aura 1_March 24_compressed.pdf23 May 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Nexworld OC.pdf26 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 2023_ Architects Certificate_Aura - 1.pdf15 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MEPDPL_Engineer Certificate_Aura 1_Dec 2023_compressed.pdf15 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Nexworld Form 2A Dec 2023 Aura 1.pdf15 Mar 2024
Certificates of CA (Form 3)File: MEPDPL_CA Certificate_Aura 1_Dec 2023_compressed.pdf15 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_ Engg certificate Aura 1 Dec 2023.pdf30 Jan 2024
Certificates of CA (Form 3)File: Form 03 Aura-1 Rera Certificate Dec 2023.pdf30 Jan 2024
Certificates of CA (Form 5)File: MEPDPL_Form 5_Aura 1.pdf14 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: MEPDPL_Form 5_Aura 1.pdf14 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Aura 1 Form 2A.pdf12 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sept 2023_ Architects Certificate_Aura - 1.pdf9 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aura 1 - Engineer Certificate - Sept 23.pdf9 Dec 2023
Certificates of CA (Form 3)File: CA Certificate - Sept 23 - Aura 1_compressed.pdf9 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A quality Aura 1 .pdf27 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 2023_ Architects Certificate_Aura - 1.pdf16 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Aura 1 - March 23.pdf16 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aura 1.pdf16 Aug 2023
Certificates of CA (Form 3)File: CA Certificate - Aura 1 - June 23_compressed.pdf16 Aug 2023
Certificates of CA (Form 3)File: CA Certificate - Aura 1 - March 23_compressed.pdf6 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mar 2023_ Architects Certificate_Aura - 1.pdf24 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Aura 1 Form 2A March 2023.pdf24 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: AURA 1Signed Form 2A.pdf22 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 2022_ Architects Certificate_Aura - 1.pdf19 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aura 1.pdf19 Feb 2023
Certificates of CA (Form 3)File: Matrix-Rera Cert Aura-1 Dec 22_compressed.pdf19 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: marathon nexworld aura 1 Q1 2019.pdf21 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: marathon nexworld aura 1 Q2 2019.pdf21 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: marathon nexworld aura 1 Q3 2019.pdf21 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: marathon nexworld aura 1 Q4 2020.pdf21 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: nexworld aura 1 Q1 2020.pdf21 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: next world aura 1 Q2 _2020.pdf21 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: next world aura 1 Q3_2020.pdf21 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: marathon nexworld aura 1 Q4 2021.pdf21 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2022-23 Aura 1 Q1.pdf21 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 21-22 Aura 1 Q1.pdf21 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 21-22 Aura 1 Q2.pdf21 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 21-22 Aura 1 Q3.pdf21 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 21-22 Aura 1 Q4.pdf21 Dec 2022
Disclosure of sold/ booked inventoryFile: Aura 1 disclosure on inventory Dec 2022_compressed.pdf21 Dec 2022
Declaration about Commencement CertificateFile: Aura 1 12-17-2022 pdf.pdf17 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2 Certificates of CA (Form 5) 2019.pdf16 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 3 Certificates of CA (Form 5) 2020.pdf16 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 4 Certificates of CA (Form 5) 2021.pdf16 Dec 2022
Certificates of CA (Form 5)File: Aura 1 Form 5.pdf15 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Aura 1 Form 5.pdf15 Dec 2022
Certificates of CA (Form 3)File: Aura 1_compressed.pdf7 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Aura 1 form 2A Sept 2022.pdf1 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sept 2022_ Architects Certificate_Aura - 1.pdf23 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate Sept 2022 - Aura 1.pdf23 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_Aura-1.pdf5 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Cert Aura 1 June 2022_compressed.pdf2 Aug 2022
Certificates of CA (Form 3)File: CA certificate Aura 1 June 2022_compressed.pdf2 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Aura -1_compressed.pdf7 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Aura - 1_compressed.pdf3 May 2022
Certificates of CA (Form 3)File: CA Cerificate Aura 1_compressed.pdf3 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aura 1_compressed.pdf13 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aura 1 Dec 2021_compressed.pdf13 Jan 2022
Certificates of CA (Form 3)File: Aura 1 Dec 2021_compressed.pdf13 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aura 1.pdf8 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aura1.pdf25 Oct 2021
Certificates of CA (Form 3)File: Aura 1 Sept 21_compressed.pdf25 Oct 2021
Certificates of CA (Form 5)File: Sept 2021-Aura 1.pdf30 Sep 2021

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MARATHON NEXWORLD AURA-1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Betawade Gaon7,600+ in Thane

2 kmMARATHON NEXWORLD AURA-1Completed 32Lapsed / revoked 20Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 87 registered projects within 2 km.

Builder: MATRIX ENCLAVES PROJECTS DEV. PVT. LTD

MATRIX ENCLAVES PROJECTS DEV. PVT. LTD has 5 registrations on MahaRERA, including MARATHON NEXWORLD AURA-1 and MARATHON NEXWORLD AURA-2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if MARATHON NEXWORLD AURA-1 is delayed beyond 29 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MARATHON NEXWORLD AURA-1?

The registered promoter entity is MATRIX ENCLAVES PROJECTS DEV. PVT. LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MARATHON NEXWORLD AURA-1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MARATHON NEXWORLD AURA-1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MARATHON NEXWORLD AURA-1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MARATHON NEXWORLD AURA-1?

The professionals named in the filing: Architect: MATRIX ARCHITECTS AND ENGINEERS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MARATHON NEXWORLD AURA-1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MARATHON NEXWORLD AURA-1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MARATHON NEXWORLD AURA-1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.