Home / Browse projects / Thane, Maharashtra / MARATHON NAGARI NX VIGO D

Completed No litigation declared Residential / Group Housing project

MARATHON NAGARI NX VIGO D

By MARATHON REALTY PVT LTD

RG-MH-24415 · RERA P51700005045 · Last updated on MahaRERA portal: 28 Mar 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2020Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

MARATHON NAGARI NX VIGO D is a Residential / Group Housing project by MARATHON REALTY PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700005045 on 9 Aug 2017. The registration is recorded completed; possession was promised by 29 Dec 2020. The completion date has moved by 18 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMARATHON NAGARI NX VIGO D
  • TypeResidential / Group Housing
  • Location
    • GOVAN RD
    • SHIRGAON
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700005045
  • ReraGenie IDRG-MH-24415

Builder

  • NameMARATHON REALTY PVT LTD
  • Entity typeCompany
  • CINU70100MH1994PTC084037
  • DirectorsCHETAN RAMNIKLAL SHAH, MAYUR RAMNIKLAL SHAH
  • Other registrations6 more →
  • Completed1 of 7
  • No longer live5 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseJun 2019Revised toDec 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Aug 2017
  • Promised completion29 Dec 2020
  • Revised completionRevised to 29 Dec 2020 (originally 30 Jun 2019)
  • Buildings1 building record
  • Documents filed60 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MARATHON NAGARI NX VIGO DNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

MARATHON NAGARI NX VIGO D: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 28 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Closed/Covered3

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area357 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2987.28
Proposed, not sanctioned2,987 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMARATHON MAX SHOP NO 12 TO 15 MULUND GOREGAON LINK ROAD MULUND WEST MUMBAI 400080

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
MARATHON REALTY PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700001918Jun 2019 → Jun 2020

Reason as filed by the promoterRespected Sir/Madam We have already applied OC at KBMC 02/02/2019

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12504005MARATHON REALTY PVT LTDDarshana Rajesh Torane13/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Sep 2021

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: NAGARI NX- VIGO D RERA CERTIFICATES Sep2018.pdf28 Mar 2025
Certificates of CA (Form 3)File: RERA CA Certificate NAGARI NX- VIGO D Dec2018.pdf28 Mar 2025
Certificates of CA (Form 3)File: NAGARI NX VIGO D RERA CERTIFICATE Mar 2019.pdf28 Mar 2025
Certificates of CA (Form 3)File: RERA CA Certificate-NAGARI NX VIGO D Jun 2019.pdf28 Mar 2025
Certificates of CA (Form 3)File: RERA CA Certificate NAGARI NX VIGO D Sep 2019.pdf28 Mar 2025
Certificates of CA (Form 3)File: Nagari Nx Vigo D Rera Certificate Dec 2019.pdf28 Mar 2025
Certificates of CA (Form 3)File: Nagari NX- Vigo D Rera Certificate Mar 2020.pdf28 Mar 2025
Certificates of CA (Form 3)File: NAGARI NX VIGO D RERA CERTIFICATE Jun 2018.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Vigo-D Dec 2018.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Vigo-D Mar 2020.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Vigo-D Dec 2019.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Vigo-D Sep 2019.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Vigo-D Jun 2019.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Vigo-D Mar 2019.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Vigo-D Sep 2018.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Vigo-D Jun 2018.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Vigo-D Mar 2018.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Vigo-D Dec 2017.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Vigo-D Sep 2017.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Vigo-D Jun 2017.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Vigo-D Jun 2020.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Vigo-D Sep 2020.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Vigo-D Dec 2020.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Vigo-D Mar 2021.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Vigo-D Jun 2021.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Vigo-D Sep 2021.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Vigo-D Dec 2021.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Vigo-D Mar 2022.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Vigo D.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SIGNEDForm 2A - QAC-NAGARI VIGO D-FY23-24.pdf27 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4_AC_Form-1_Nagari NX Vigo-D_2024.pdf19 Apr 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Vigo-D'wing_Society Registration Certificate.pdf8 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 25-MARATHON NAGARI NX VIGO D -Q2.pdf7 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC VIGO D LEETR.pdf4 Sep 2021
Architect’s Certificate on Completion of Project (Form 4)File: certificate of completion 05042021.pdf5 Apr 2021
Certificates of CA (Form 5)File: Form 5 - Vigo D.pdf21 Dec 2020
OtherFile: OCapplication.pdf19 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate_Vigo D_Dec 2018.pdf16 Feb 2019
Certificates of CA (Form 5)File: Form 5 VIGO D.pdf9 Oct 2018
Proforma of Allotment letterFile: Vigo D resi.pdf17 Aug 2018
Proforma of Allotment letterFile: Vigo D comm.pdf17 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate _Vigo D upto March 2018.pdf8 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate_Vigo D_June 2018.pdf8 Aug 2018
Certificates of CA (Form 3)File: RERA CERTIFICATE _ NAGRI NX - VIGO D_ DEC17.pdf7 Aug 2018
Certificates of CA (Form 3)File: Vigo D_March-2018.pdf10 May 2018
Commencement Certificates / NA Order for plotted developmentFile: cc nagarinx.pdf10 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer's Certificate_Vigo D upto Sep 2017.pdf16 Nov 2017
Certificates of CA (Form 3)File: NAGARI NX - VIGO D RERA SEP17-ilovepdf-compressed.pdf16 Nov 2017
Layout approvalFile: Layout Plan.pdf27 Jul 2017
Building plan approvalFile: Floor Plans.pdf27 Jul 2017
PAN CardFile: MRPL PANCARD1.pdf27 Jul 2017
Copy of the legal title reportFile: TC-Shailendra J(031111).pdf27 Jul 2017
Details of encumbrancesFile: NAGARI NX_No encumbrance.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf27 Jul 2017
Building Plan Approval (IOD)File: Floor Plans.pdf27 Jul 2017
Declaration in FORM BFile: FORM B MARATHON NAGARI NX VIGO.pdf27 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: VIGO-D.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer's Certificate_Vigo D.pdf27 Jul 2017
Certificates of CA (Form 3)File: FORM 3 VIGO-D.pdf27 Jul 2017
Proforma of Allotment letterFile: DECLARATION MARATHON NAGARI NX VIGO.pdf27 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
MARATHON NAGARI PHASE 1SHIRGAON BADLAPUR EAST696CompletedJul 2012Late, Feb 2013

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 18 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MARATHON NAGARI NX VIGO D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHIRGAON7,600+ in Thane

2 kmMARATHON NAGARI NX VIGO Completed 161Lapsed / revoked 56Other 106Dot size: filed unitsN

Filed coordinates, straight-line distance. 323 registered projects within 2 km.

Builder: MARATHON REALTY PVT LTD

MARATHON REALTY PVT LTD has 7 registrations on MahaRERA, including MARATHON MONTE CARLO-2 and MARATHON MONTEPLAZA. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if MARATHON NAGARI NX VIGO D is delayed beyond 29 Dec 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MARATHON NAGARI NX VIGO D?

The registered promoter entity is MARATHON REALTY PVT LTD, a company as per the filing. Its CIN U70100MH1994PTC084037 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MARATHON NAGARI NX VIGO D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MARATHON NAGARI NX VIGO D?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MARATHON NAGARI NX VIGO D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in MARATHON NAGARI NX VIGO D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MARATHON NAGARI NX VIGO D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MARATHON NAGARI NX VIGO D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.